Sida 1 N3S Nexans Space Saving Solution High Density ODF system.

Slides:



Advertisements
Similar presentations
R&M Fiberliner LAN / WAN applications R&Measynet.
Advertisements

How To Install RAM In Laptop Installing Larger RAM is the easiest way speed up your laptop computer. This Post will guide you about installing laptop computers.
1 R&M FO Patch Panels Splice Version The convincing way to terminate fibers.
Assembly Manual Mike Fortney 04/09/2004 CricketSat Receiver.
NetReachTM DSLAM XC Compact Series
FibreTec ODF Solutions Ordering Guide for The Patch & Patch/Splice Tray FODF-1U-P 1.Production Description 2.Ordering Information 1.FODF-1U-P Tray 2.Splice.
Fiber Optic Construction & Termination Jeff Hite University of Oregon/NSRC This document is a result of work by the Network Startup Resource.
Start here >> Network IQ Training Manual Chapter 4 - Fibre Optic Hardware.
FiberNext LLC 41 Locke Road, Concord, NH MPO Switch Exclusively by FiberNext Rev_12/30/13.
Holiday Lane Batting Cage Set-up Instructions July 2007 In-ground Posts (6 places) Upright Poles (qty 6) Cross Piece (2) – Short (1) - Long Frame Assembly:
Visitability Standards Dan McNabb, Deputy Building Official Planning and Development Review Department.
VS Compact Slim Enrique Rodriguez Head of Product Management.
Qualified Partner Program FO Terminal Outlets Felice Guarna, Training Program Manager Wetzikon, September 2005.
Infrastructure and components. Cable The cable and components used in structured cabling systems is defined in the standards –EIA/TIA 568 x There are.
© red ©
VS Compact Applications Enrique Rodriguez Head of Product Management Distribution Systems.
Assembly Manual Mike Fortney 04/02/2006 CricketSat Receiver.
111 © 2002, Cisco Systems, Inc. All rights reserved. Trim out phase steps Cutting cables to length Labeling cables Dressing cables Terminating cables Installing.
1 Nexans Cabling Solutions Fibre solutions for fast deployment Joost Grillaert.
1 Fiber Optics FIBER OPTIC PATCH PANELS. 2 Fiber Optics Just like our copper cable plant the fiber cable plant incorporates many of the same hardware.
1 Telecom Cabling Ladder racks systems and relay racks Ladder racks systems and relay racks.
Supplies List for Farm Themed Busy Book
By: Robbie Newman. Total Square Feet: 1474 sqft Front Rear.
1 Nexans Cabling Solutions Easy and reliable migration from fast to faster to100G.
1 Nexans Cabling Solutions NVT Software update 2012 – NVT 3.2 Didier Willems Project Design & Support Department Manager.
Ages 8+. x1 x2x6x2 x1 x7x2x1 x2 x1 x4x2 x1 x3 Step 1: Boat Assembly 1. Attach red block to back space of the boat. 2. Attach blue flat block to back.
12 feet 4 feet Top view Removable fronts 4x4 posts Slats 1x4x ¾” spaced ¾”
HD Flex ™ Fiber Cabling System
1 The fiber optic system for cross connection cabinets R&M FiberCurb.
Carrier - Copper and FO Solutions by R&M. R&M Products for Carrier Networks Copper / Page 2 R&M Cu Application Outdoor Boxes Cross Connection Cabinet.
Energy Area Presentation November 19th, 2011 Ryan Arch Ryan Asa Fabian Lopez Ogee Nnamdi-Emetarom Jerron Smith.
Patent Pending The strong link for data networks
Sing the song Red,blue, yellow and green are all the colours I know.
CERN EN-EL Cabling and Optical Fibre Section CERN EN-EL Cabling and Optical Fibre Section Mini Workshop, Simao Machado, EN/EL/CF.
A quick and effective preconnectorised system
Module 2 Lesson 8 - Solve addition and subtraction word problems using the ruler as a number line.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
ITE1v4 Computer Assembly Module 3 JEOPARDY RouterModesWANEncapsulationWANServicesRouterBasics RouterModesWANEncapsulationWANServicesRouterBasics.
ANCIT WORKSHOP Torino, March 1998 Optical Network Construction in Customer Premises by Sadaaki TAKANO NTT Access Network Systems Laboratories.
Operating procedure for POF cables Comoss Electronic Co., Ltd. Date : May-05, 2008.
G.Barber Mice Tracker Mechanical Ral June Tracker Mechanical Update Contents:- Station Space Frame Station Layout Connectors Patch Panel Still to.
Splitter Module Distribution Frame VSOF-SMF SPLITTER MODULE DISTRIBUTION FRAME.
© 2008 Eaton Corporation. All rights reserved. This is a photographic template – your photograph should fit precisely within this rectangle. BladeUPS Preassembled.
Write a fraction for a whole. 1. How to count parts of a group.
BIMA Antenna Reconstruction. AntennaFarm.V3 antenna assembly lift pedestal onto base (CRANE) lift dish onto pedestal (CRANE) reinstall ladder (FORKLIFT)
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
MKTG 2016.
BOYS Women X Fragment Converse.
Titan Installation Guide
Micro duct cabling at CERN
What colour?.
Installing an Xbox 360.
Update of MVD services and requests
Enrique Calvo Alamillo DAEGU
RATIOS BY: JENNIFER BODELL.
South African Flag The South African flag contains the most colours of any national flag. Can you colour it in here? RED WHITE YELLOW WHITE BLACK GREEN.
MKTG 2016.
WARNINGS Side Description COMPONENTS SIDE (TOP) EXPRESSIONS BOARD 1/2
Make your map 3D 1. Trace Contour Map of Mt. Capulin onto White Paper
Solving Systems of Equations By Substitution
Scope Reliability What is reliability ? Reliability parameters.
Absorption and Colour Along with everything else in the world, plants are the colour they are because of the light that they reflect, and all other colours.
Colours.
FRONT No Solutions Infinite Solutions 1 solution (x, y)
What Color is it?.
General wiring procedure for a new instrument
Reader Swap out Guide.
Bharat Electronics
Presentation transcript:

Sida 1 N3S Nexans Space Saving Solution High Density ODF system

Sida 2 N3S Modularity: patching frame, splicing frame, splicing module, patching module and a complete solution for cables and patch cords management. Front view Rear view

Sida 3 Individual pieces of components

Sida 4 N3S Patching frame 2200x600x subracks 96 fibres or 32 subracks 48 fibres; in all 1536 SC connectors 2000x600x subracks 96 fibres or 28 subracks 48 fibres; In all 1344 SC connectors 1800x600x subracks 96 fibres or 24 subracks 48 fibres; in all 1152 SC connectors

Sida 5 N3S Splicing frame 2200x600x cables (192 fibres/cable) top or bottom entrenance and clamping 80 cables to subracks 10 splicing modules 7680 fibre splices (ribbon) in total 2000x600x300 9 splicing modules 6912 fibre splices (ribbon) in total 1800x600x300 8 splicing modules 6144 fibre splices (ribbon) in total

Sida 6 N3S Pre-connectorised ODF subrack 96 fibres 20 m of cable 6 pull-out units each with 8 duplex adaptors 48 fibrer 20 m of cable 3 utdragsenheter med 8 pull-out units each with 8 duplex adaptors

Sida 7 N3S

Sida 8 N3S Splicing module 8 swing-out cassettes 96 splices/cassette 768 splices in total (e g 4 cables with 192 fibres)

Sida 9 N3S - accessories Patchcord ladderProtective lidCable clamp Pull-out feetPatchcord hangerPatchcord guide Cable ladder Doors Pull-out ramp

Sida 10 INSTALLATION and FUNCTIONALTY

Sida 11 Location in CO

Sida 12 Pull-out feet

Sida 13 Pull-out and twist

Sida 14 Installation of subrack

Sida 15 Patching - internal

Sida 16 Patching external

Sida 17 Installation complete!

Sida 18 Documentation Installation guideProduct description

Sida 19 Labelling

Sida 20 N3S – coloured guides for patchcords Guiding of patchcords is supported by coloured guiding strip vertically along the inner turnable part of the patching frame yellow, white, red and blue stripes

Sida 21 N3S

Sida 22 N3S

Sida 23 N3S