Aquarius Hydroelectric Project (A small-scale CDM project) Project Design Document.

Slides:



Advertisements
Similar presentations
Guatemala: El Canada Hydroelectric Project
Advertisements

Technology Transfer in the CDM DUAN Maosheng Tsinghua University Linking Climate Mitigation Policy and Modeling in China Workshop February 18, 2006 Beijing.
Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
Clean Energy Project Analysis Course Greenhouse Gas Emission Analysis with RETScreen ® Software © Minister of Natural Resources Canada 2001 – Photo.
Capacity Development for CDM - National Workshop on PDD, Cairo June Capacity Development for CDM Fourth National Workshop Cairo, June.
ww.neprisoe.org CDM Methodologies Carbon Markets – CDM project development 8. August 2011 Jørgen Fenhann.
CDM Project Cycle Carbon Markets – CDM project development, 8. August 2010 Jørgen Fenhann.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth COP 9 5 th December 2003.
Eng Rafik G. M. of Economic and Environment Studies NREA Baseline For Japanese Wind Power Plant Project in Zafarana (Arab Republic of Egypt)
POWER GRIDS AND CDM METHODOLOGIES Workshop for CDM stakeholders The World Bank Buenos Aires December 8, 2004.
Clean Air Act Section 111(d) Indiana Energy Association September 11, 2014 Thomas W. Easterly, P.E., BCEE Commissioner IN Department of Environmental Management.
EE535: Renewable Energy: Systems, Technology & Economics
1 Dr. Christo Christov Energy Institute JSCo Sofia, Bulgaria Bulgaria GHG Emission Projections - Results and Methodological Problems Dr. Christo Christov.
UNEP rise centre - Demark Fourth regional workshop and training on “Capacity development for the clean development mechanism” 4-6 April - AIT Thailand.
Capacity Development for Clean Development Mechanism Project Idea Note (PIN) Preparation by Kofi Asante.
China Thermal Power Efficiency Project WB support to the improvement of coal-fired power generation efficiency in China Jie Tang Energy Specialist East.
Hydroelectric Power
Case Study: Gemina rice husk project, Nicaragua (Scenario Analysis and Small-Scale Simplified Methodologies) Carbon Finance Unit The World Bank 22 October.
World Bank Experience with Power Sector Baselines Workshop on CDM Methodologies for Grid-Connected Power Projects Buenos Aires, 8 December 2004 Fernando.
Standardized approaches in CDM methodologies Daniel Perczyk 7th Joint Workshop 13/03/2011.
Development Alternatives Baselines & Additionality Methodologies Workshop on Clean Development Mechanism: Opportunities in Rajasthan January 28-29, 2005.
The Learning Process and Technological Change through International Collaboration: Evidence from China’s CDM Wind Projects Tian Tang David Popp Maxwell.
Opportunities and Constraints on Possible Options for Transport Sector CDM Projects – Brazilian Case Studies Suzana Kahn Ribeiro Importance of Transport.
Introduction to Climate Change: - global warming - basis steps in a clean development project - connection of CDM with European Trading Scheme Wim Maaskant.
Case Study 5: Gemina rice husk project, Nicaragua Sandra Greiner Carbon Finance Unit The World Bank World Bank methodology event.
PDD Preparation Cairo, June 14 th -15 th, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXPDD Preparation Process and Format.
RENEWABLE ENERGY POTENTIALS Projections to 2050 BASED ON THE PRESENTATION of Mohamed El-Ashry Chairman REN 21 3rd Ministerial Meeting in Gleneagles Dialogue,
Carboncredits.nl Baseline Methodologies Dispatch Analysis Gerhard Mulder Project Officer.
CD4CDMCD4CDM Estimating CO 2 Emissions Reduction by example.
CDM Project Developers Workshop.  Boundaries & Leakage  Calculating emissions reductions  Any other issues Session II.
Module 6: PINs M6. M6. PINs Contents: Project Identification Notes – how to structure them (including eligibility, baselines and additionality) Two projects.
DAC PROJECT Capacity Building in Balcan Countries for the Abatement of Greenhouse Gases Setting priorities for GHG emissions’ reduction George Mavrotas.
CLEAN ENERGY MECHANISMS IN CONVENTIONAL POWER GENERATION H.AZOUZ, CDM Project Management Officer at STEG
Sustainable Energy options for Northern Ireland European Studies Project.
1 CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM) 2 nd National Workshop on Capacity Development for the Clean Development.
Min Hydro-Egypt 1 Tunis, Sept 22-24, 2004 TIMS/EEAA Jerba-CDM-Investment-Forum UNEP RISOE / APEX EGYPT : Damietta Barrage Small Hydropower Project Eng.
CDM A/R Investors' and Developers' Workshop, Beijing 2010 CDM Afforestation/Reforestation Projects: International workshop for developers and investors.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
Development Alternatives Baselines, Additionality & Monitoring Methodologies For Orientation Workshop on March 25-26, 2004 Udit Mathur Climate Change Centre.
1 Second Regional Workshop Capacity Development for the Clean Development Mechanism (CD4CDM) 23 March 2004 Siem Reap, Cambodia A.T. Biopower Rice Husk.
Clean Air Act Section 111(d) Indiana State Bar Association Utility Law Section September 4, 2014 Thomas W. Easterly, P.E., BCEE Commissioner IN Department.
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide Dr. Bahaa Mansour TIMS Dr. Mohamed Elewa TIMS Presented by: CDM Guidelines Cairo, January 12-13,
Capacity promotion in research and education on clean development mechanism (CDM) Preliminary results and plan to implement the task 5 in year
ENDA TM / CDM-PDD1 Analysis of a CDM-PDD illustrated by the El Gallo project Second Regional Workshop on CD4CDM August 2004 Maputo, Mozambique Dr.
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
UNEP Collaborating Centre on Energy and Environment Rules for Small-Scale CDM Projects Prepared for the CD4CDM Regional Workshop in Tunis January.
1 Basics of CDM Development Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
1 Formato de um PDD. 2 índice Formato de um PDD Descrição geral da atividade do projeto Aplicação de uma metodologia de linha de base e monitoramento.
UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, January 2004.
El Gallo Hydroelectricity Project PDD Analysis
1 PDD and PIN preparation Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
Salvador Da Bahia Landfill Gas Project: Baseline Methodology 1 of the 1 st 2 methodologies recommended for approval by the Meth Panel, July 2003.
CD4CDM Philippines Salvador da Bahia Landfillgas Project (PDD Presentation)
Kai-Uwe B. Schmidt Maria Netto Cooperative Mechanisms UNFCCC secretariat Clean Development Mechanism (CDM) under the Kyoto Protocol.
1 19 th World Energy Congress – 2004 Round Table 1 – Non Fossil Fuels: Will They Deliver? Jerson Kelman President, Brazilian Water Agency - ANA.
1 Case study: Sofia District Heating Dr. Venkata R. Putti Team Leader, Carbon Finance Assist The World Bank Minsk / Belarus, March 2007.
0 National Inter-Ministerial Dialogue on Climate Change Cape Hotel Monrovia, Liberia June 25, 2009 Assessing and Developing Policy Options for Addressing.
ENTER+ ENTER+ METZ - FRANCE 25th -26th November 2010 AGORÁ Società Cooperativa a r.l. Via Copernico, Senigallia (AN) tel. & fax
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, Capacity Development for CDM Cairo, March 31 & April 1,
Quantification of the CDM effect: PT.NOEI Integrated Solid Waste Management Project in Bali Mitsubishi Securities Clean Energy Finance Committee Workshop.
Case Study: Gemina Rice Husk Project Nicaragua (Scenario Analysis and Small-Scale Simplified Methodologies) Carbon Finance Unit The World Bank 22 October.
UNEP Collaborating Centre on Energy and Environment Use and Conceptualization of Power Sector Baselines: Methodology and Case Study from El Salvador Lasse.
CDM Project Design Document CDM Project Design Document Training Course May 22, 2003 CCIC Conference Room Manila Observatory Ateneo de Manila University.
JISC work on Small Scale JI Projects UNFCCC Technical Workshop on Joint Implementation Bonn 9 th March 2006 By: Fatou Ndeye Gaye and Evgeny Sokolov.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
Visit of the S. Korean delegation UNEP Risø Centre, 1 September 2005 Jørgen Fenhann Analysis of the CDM project pipeline Content of the presentation: What.
Salvador Da Bahia Landfill Gas Project: Baseline Methodology
Betül Özer, Erdem Görgün, Selahattin İncecik
Presentation title Methodological tool and data for the development of a SB for the emission factor of an electricity system CDM Standardized Baselines:
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide
Presentation transcript:

Aquarius Hydroelectric Project (A small-scale CDM project) Project Design Document

Host country requirements: Brazil is a non-Annex 1 country Brazil has ratified the Kyoto Protocol last August 28, 2002 Establishment of Designated National Authority

A.1. Title of the project activity: Aquarius hydroelectric project

A.2 Description of the project activity:  The objective of the project activity is to generate clean electricity using hydroelectric resources and sell it to the regional power grid.  The project is expected to have an installed capacity of 4.2 MW, and will utilize the water of the Correntes river. It will be a run- of-river project with no dam or flooding.  The Aquarius project started in the 1980s with some structures already in place, like, water intake channel, partial excavation of the conduction channel, bases for blocks of anchorage of the penstock and ramp.

A.2 Description of the project activity (cont.):  The project was reactivated in 1999 and was linked to the 180 MW Ponte de Pedra hydropower plant.  The total height difference (head) between the headpond and the turbine/generator is approximately 60 meters. The dam takes advantage of the existing natural fall and the inlet water is at m above sea level.  The project will require 350 m conduction channel and a 160 m long penstock, and two turbines will be installed.

A.2 Description of the project activity (cont.): The project will deliver about 25,750 MWh/year to the Brazilian power system. Since the power plant is located at the end of the CEMAT (Centralis Eletricas Matogrossenses) distribution system, another important function of the Aquarius project is to improve the quality of power supply in the region.

A.3 Project Participants: Host Party:Brazil Project Developers: Companhia Agricola Sonora Estancia – CASE PDD Consultants: MGM International, Inc. and NEGAWATT – Projtos, Engenhariae Comercio Ltda. Annex 1 country participant: Electric Power Dev. Co. Ltd

A.4.1 Technical Description of the project activity: A.4.1 Location of the project activity: A Host country: Brazil A Region: Latin America A City/Town: Itiquira Municipality (right margin of the Correntes river) in the Mato Grosso State and Sonora Municipality (left margin of the Correntes river), Mato Grosso do Sul State A The project will be located in the central-western region of Brazil (latitude: 17°37‘S and longtitude 54°55’W), on the Correntes river.

Map of Brazil

A.4.2. Type and category(ies) and technology of project activity: Type : 1 – Renewable Energy Projects Category: D – Renewable Electricity Generation for a Grid

A.4.3 Brief Statement on how anthropogenic emissions of greenhouse gas (GHGs) by sources are to be reduced by the proposed CDM project activity: It is expected that the project activity will serve to displace fossil- fired plants with clean technology provided by hydroelectricity. The baseline analysis (Section B) estimates that the Project would displace: 7 -year ( )104,594 tonnes of CO 2 21-year313,782 tonnes of CO 2 30-year life span448,260 tonnes of CO 2

A.4.4 Public funding of the project activity: No public funding, including official development assistance is involved in financing the project.

A.4.5 Confirmation that the small-scale project activity is not a debundled component of a larger project activity: Aquarius is not part of a larger debundled CDM activity.

B.1 Title and reference for the project category applicable to the project activity: Type 1 – Renewable Energy Projects Category 1.D – Renewable Electricity Generation for a Grid

B.2 Project category applicable to the project activity: The baseline is the kWh produced by the renewable generating unit multiplied by an emission coefficient (measured in kgCO 2 /kWh) calculated in a transparent and conservative manner as: The average of the “approximate operating margin” and the “build margin”, where: The “approximate operating margin” is the weighted average emissions (in kgCO2/kWh) of all generating sources serving the system, excluding hydro, geothermal, wind, low-cost biomass, nuclear and solar generation; (i) The “build margin” is the weighted average emissions (in kgCO2/kWh) of recent capacity additions to the system, defined as the lower of most recent 20% of plants built or the 5 most recent plants

B.3. Description of how the anthropogenic GHG emissions by sources are reduced below those that would have occurred in the absence of the registered CDM project activity Until mid 1990’s the electricity market was focused on large hydroelectric power plants operated by the state; 1990s consumption increased by 49% while installed capacity increased only by 35% requiring the use of stored energy in the form of water in the reservoirs. In 1995 onwards, international interest rate increased and investment capacity of the state decreased; The solution was privatization and liberalization of the market;

B.3. Description of how the anthropogenic… (cont.) In year 2000, the power demand was TWh with a generation capacity of 67.7 GW; with a gross generation of TWH; The only alternatives were improved energy efficiency or a more intensive use of existing plants; Improved energy efficiency generated limited result; Intensive use of existing plants was exploited; The reservoirs were not able to meet the demand resulting to power shortage in 2001; In 2001 onwards, rationing was imposed to reduce consumption by 20%

In 2000 the government launched the Thermal Electric Priority Plan (PPT) to increase the share of thermal electricity; The government promoted the building of thermal power plants based on imported natural gas; This was a significant shift from basically hydroelectric system to thermal power plants; The Wind Energy Incentive and Alternative Energy Sources Incentive Program foresee increase generation capacity by 3300 MW with other renewable energy other than hydro, offering long-term contracts with special conditions, lower transmission costs, lower interest rates from banks. There are still uncertainties on the benefits of these programs. B.3. Description of how the anthropogenic… (cont.)

B.4 Description of the project boundary for the project activity: Construction of Equipment Materials transportation Construction of the plant Power Plant (prod. Of energy) Injection of elec. to the grid Grid (trans and dist.) End users Correntes river (water supply) Auxiliary energy Dashed line indicates project boundary

B.5 Details of the baseline and its development: B.5.1 The methodology used is option (a) of Appendix B of the Simplified Methodology developed based on the following steps: 1. Determination of expected annual electricity production, found by multiplying the installed capacity (4.2 MW) by the plant capacity factor (70%) by 8,760 (number of hours in one year) = 25,755 MWh per year. Capacity factor: average of natural gas and hydro plants in 2001 Equation 1: Annual Plant Capacity = Plant Capacity x Plant Capacity x Annual Hours Output (MWh/yr) (MW) Factor 8,760 hours

B.5 Details of the baseline and its development (cont.): 2. Determine power plants serving the national and regional system (excluding hydro, geothermal, wind, nuclear, low-cost biomass, and solar generation). The Sistema de Informacoes Empresariais do Setor de Energia Electrica, Boletim Semestral Sintese 2001, MME-ANEEL-ELETROBRAS provides data on the electricty generation of its power plants. For the study, power plants located in the Center-West region of Brazil,comprising the states of Goias, Mato Grosso and Mato Grosso do Sul were considered.

B.5 details of the baseline and its development (cont.): 3. Emission factors (kg CO2 per kWh electricity) for thermal power plants are obtained from natural gas and diesel consumption, and corresponding power generation of power plants in the West Central (WC) region during 2001, as reported in SIESEE. Additional data were taken from Revised 1996 (IPCC Guidelines for National Greenhouse Gas Inventories, Volume 3: GHG Inventory Reference Manual

B.5 details of the baseline and its development (cont.): 4. Plant conversion efficiencies (conversion of thermal energy into electricity), obtained from the official data, were checked with estimates of the World Bank Greenhouse Gas Assessment Handbook, Annual emissions of carbon dioxide are calculated by multiplying electricity generation by the corresponding emission factors (by fuel and technology) B.5.2. Date of completing the final draft of this baseline: 28/02/2003

B.5 details of the baseline and its development (cont.): B.5.3 Name of person/entity determining the baseline: Dr. Gautam S. Duff and Ing. Ivana Cepon, MGM International, Inc. Ayabucho 1435, 9B C1111AAM Buenos Aires Argentina

C.1 Duration of the project activity : C.1.1 Starting date of the project activity: Construction is expected to begin in mid Duration of the construction is 17 months. Generation is expected for early C.1.2 Expected operational lifetime of the project activity 30 years

C.2 Choice of the crediting period and related information: C.2.1. Renewable crediting period (at most seven (7) years per period) C Starting date of the first crediting period is (dd/mm/yyyy) : 01/07/02005 C Length of the first crediting period 7 years C.2.2 Fixed crediting period (at most ten (10) years: Not selected.

D.1. Name and reference of approved methodology applied to the project activity : According to option (a) of Type 1, Category D of CDM small-scale project activity categories contained in Appendix B of the simplified M & P for CDM small-scale project activities, monitoring shall consist of metering the electricity generated by the renewable technology (hydroelectricity).

D.2 Justification of the choice of the methodology and why it is applicable to the project activity: Monitoring has been chosen as it is suggested in the last proposal on “Indicative simplified baseline and monitoring methodologies for selected small-scale CDM project activity categories”. Data collection is compatible with the baseline methodology described in Section B.5

D.3 Data to be monitored : ID Number Data type Data variable Data Unit Measured; Calculated; Estimated Recoding Frequency Proportion of data to be monitored How will the data be archived? (electronic or paper) For how long is archived date to be kept? Comments: Source of data

D.4 Name of person/entity determining the monitoring methodology: Dr. Gautam S. Duff and Ing. Ivana Cepon, MGM International, Inc. Ayabucho 1435, 9B C1111AAM Buenos Aires Argentina

E.1 Formulae used: E.1.1 Selected formulae as provided in appendix B: Not applicable E.1.2 Description of formulae when not provided in appendix B: E Describe the formulae used to estimate anthropogenic emissions by sources of greenhouse gases due to the project activity within the project boundary: Zero since hydroelectric power is clean technology.

E.1 Formulae used (cont.): E Describe the formulae used to estimate leakage due to the project activity,where required for the applicable project category in appendix B to the simplified modalities and procedures for small-scale CDM project activities. Not applicable. E The sum of E and E represents the project activity emissions: No emissions at all.

E. 1 Formulae used cont.: E.2.4 Describe the formulae used to estimate anthropogenic emissions by sources of greenhouse gases in the baseline using the baseline methodology for the applicable project category in appendix B to the simplified modalities and procedures for small-scale CDM project activities. Baseline emissions, E baseline are given by: E baseline (tonneCO 2 /yr) = [E] baseline (kgCO 2 /kWh) x CG(kWh/yr) kg / tonne Where CG stands for Aquarius electricity generation (Equation 1).

E. 1 Formulae used cont.: E Difference between E and E represents the emission reductions due to the project activity during the given period. Total baseline emission = 14,942 tonnesCO 2 /year – Hydro power emission = 0 Emission Reductions = 14,942 tonnesCO 2 /year

E.2 Table providing values obtained when applying formulae above: Build margin estimation : [E] build margin = kg CO 2 /kWh Operating margin estimation : [E] operating margin = 0.851d kg CO 2 /kWh Baseline estimation: [E] baseline = ([E] build margin + [E] operating margin )/2 = kg CO 2 /kWh

E.2 Table providing values obtained when applying formulae above (cont.): E baseline = kgCO2/kWh x 25,755 MWh/yr kg/tonne E baseline = 14,942 tonnes CO 2 /year Total emissions reductions: 1 year 14,942tonnes CO2 7 years104,594tonnes CO2 21 years313,782tonnes CO2 30 years448,260tonnes CO2

F.1 If required by the host party, documentation on analysis of the environmental impacts of the project activity: The proposed project is a run-of-river hydropower plant, which involves no dam construction and no flooding, and thus no deforestation. Therefore, the environmental impact is very small compared to other types of power generation alternatives.

G.1 Stakeholders comments The municipality of Sonora, where the project would be located, is a major stakeholder in the project. They were asked to give an opinion on the project. A letter of support was attached to the PDD. Another stakeholder is the Brazilian Institute of Environment and Renewable Natural Resources (IBAMA). IBAMA issued an environmental license. PDD was also posted on the website for comments of other stakeholders and the public in general. Deadline for comments is May 23, 2003.

Related links:   

Marina T. Mallare Climate Change Information Center Manila Observatory Ateneo de Manila University Tel No Fax No