How to Do Phase II: Post-Construction Site Runoff Controls NC STATE UNIVERSITY.

Slides:



Advertisements
Similar presentations
Storm Water Management
Advertisements

MS4 Stormwater Permit Program and Great Bay. Brief Overview – EPA’s Stormwater Management Program Clean Water Act – NPDES Stormwater amendments.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
RIPDES Storm Water Program: Municipal Separate Storm Sewer Systems (MS4s)
Austin Peay State University Stormwater Program Kristen Spicer, Ph.D.
Proposed Stormwater Regulations Public Forum Richland County Government September 2009.
Post Construction Runoff Control & BMPs J. C. Hayes, Ph.D., P.E. & D. Hitchcock, Ph.D. South Carolina Stormwater Forum May 8, 2007 Columbia, SC.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
& Community Design LSU Green Laws Research Project Green Laws Louisiana Department of Agriculture & Forestry EBR Parish Tree And Landscape Commission Louisiana.
Introduction To The Highway Runoff Manual This introduction focus on: An overview of the Highway Runoff Manual. The definition of Minimum Requirements.
IT’S TIME TO GET YOUR MIND IN THE GUTTER! Overview of Proposed Coastal Stormwater Rules February 14, 2008.
Stormwater Management University of North Carolina at Chapel Hill Sharon Myers, L.G. Environment, Health, and Safety (919)
Low Impact Development Overview  Alternative to end of pipe approach to SWM  Maintain hydrologic function of local ecosystem  Treat stormwater close.
& Community Design LSU Green Laws Research Project Green Laws Louisiana Department of Agriculture & Forestry EBR Parish Tree And Landscape Commission Louisiana.
Department of Conservation and Recreation 1 Proposed Stormwater Management Requirements for Virginia Rappahannock River Basin Commission June 24, 2009.
Stormwater Management
SLIDE 1 Sustainable Stormwater Management May 6, 2015 Blue Highways: Transportation and Stormwater Management in Virginia Ginny Snead, PE Richmond Office.
Managing the Environmental & Project Development Process StormwaterManagement.
Stormwater Master Plan University of North Carolina Peter A. Reinhardt Sharon Myers, L.G. Department of Environment, Health and Safety.
NPDES Compliance. NPDES Water Quality Issues for the Precast Concrete Industry.
Design for Water Quality CE 365K Hydraulic Engineering Design Spring 2015 David R. Maidment.
NPDES Stormwater and the Town of Wrightsville Beach.
STEP 3: SITING AND SIZING STORM WATER CONTROLS Section 6.
Steve Harrison, Environmental Manager Bureau of Entomology and Pest Control -Mosquito Control Section.
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
Creation of MS4 Regulations Green / Tradewater River Basin Team Henderson, Kentucky Prepared by Henderson Water Utility April 22, 2008.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Stormwater 101 Ohio Lake Erie Commission Best Local Land Use Practices Kirby Date, AICP.
1 Stormwater Phase II Municipal Separate Storm Sewer Systems and Act 167 Doug Brennan PA DEP September, 2002.
Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork City of Southlake Storm Water Management Plan Christi Upton
DWQ’s Stormwater Programs: Overview and Recent Changes Eastern Carolina Environmental Conference May 10, 2012 MCAS Cherry Point, NC Scott Vinson Stormwater.
Chumstick Creek Salmon Habitat Conditions* Land development, road construction, and other human activities have affected channel migration and sediment.
Stormwater Rain and melting snow Collected by storm drains and flows into streams, rivers, lakes.
CHAPEL HILL HIGH SCHOOL ISLAND PROJECT Water: The Essential Ingredient & Thoughts for Sustainability ©Town of Chapel Hill Stormwater Management Division.
Introduction to Storm Water Phase II Pennsylvania Department of Environmental Protection.
Stormwater Management for Colleges and Universities Phase II for Colleges and Universities State Stormwater Programs Industrial Facilities.
Why are we here today? To discuss the challenges we face in meeting NPDES Phase II minimum requirements for stormwater control. The NPDES program requires.
Construction & Post-Construction Stormwater Ordinance City of Wenatchee, Public Works Department Jessica Shaw, Environmental Manager.
MDOT Storm Water Management Plan Module 2: Best Management Practices
Stormwater Treatment and Flow-Control Requirements in Phase I and Phase II Municipal NPDES Permits Dan Cloak, Principal Dan Cloak Environmental Consulting.
Low impact development strategies and techniques jennifer j. bitting, pe the low impact development center, inc. june 2008.
Stormwater Regulations NC Division Of Water Quality DPPEA Technical Sharing Session May 25, 2004.
10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.
Effective Post-Construction Stormwater Management Mike Novotney, P.E. (MD) Center for Watershed Protection Ronald Feldner, P.E. Ecological Solutions, Inc.
Phase II National Storm Water Regulations What’s in it for you?
From the Beginning Design Standards and Other Post-Construction Program Elements.
STORM WATER STORAGE AND TREATMENT
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Bureau of Watershed Management Regulatory Proposal Chapter 102 [Erosion and Sediment Control] Erosion, Sediment and Stormwater Management February 21,
Kitsap County Department of Public Works CRAB – November 04, 2015 Bioretention Stormwater BMP Benson Burleson Design Engineer
Program Overview Town of Wrightsville Beach Public Works Department Stormwater Services.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Low Impact Development Practices. What is Low Impact Development (LID)? LID is an approach to land development (or re- development) that works with nature.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
Storm Water Management at MSU Ruth Kline-Robach Michigan State University Institute of Water Research Dept. of CARRS.
Durham County Soil & Water Conservation District January 28, 2016 Michael Dupree.
City of Clarksville Storm Water Management Manual Revisions 2014.
John Huisman – NC DWQ NC Water Quality Commission – January 11, 2012 NC Environmental Management Commission – January 12,
Urban Runoff Pollution Ordinance 2017 Proposed Update
New Jersey Department of Environmental Protection
Supervisor, RIDEM RIPDES Permitting Program
Storm Water Storage and Treatment
Building a Phase III WIP for Wastewater, Stormwater & Septic Systems
Sacramento County Stormwater Quality Program
MIDS calculator Quantifies reductions in runoff volume for a given BMP or group of BMPs Quantifies reductions in phosphorus (P) and TSS runoff for a given.
Kickoff example Create a new file
Low Impact Design Bio Retentions.
MS4 OVERVIEW 2015.
Sacramento County Stormwater Quality Program
Presentation transcript:

How to Do Phase II: Post-Construction Site Runoff Controls NC STATE UNIVERSITY

1. What does the permit say you have to do and what kind of help is available? 2. What BMPs can you use? 3.Discussion time 4.A new stormwater program on the horizon Post-Construction Runoff Controls: Agenda for Presentation

These BMPs are required: a.Establish a post-construction stormwater management program. b.Establish a program that includes BMPs appropriate for the MS4. c.Establish a program to control sources of fecal coliform to the maximum extent practicable. d.Establish nutrient sensitive waters (NSW) protection measures (for programs draining to NSW waters). What does the permit say you have to do?

Develop, adopt by ordinance, implement, and enforce a stormwater program runoff for new development and redevelopment. The ordinance must be reviewed and approved by DWQ. a) Establish a Post-Construction Stormwater Management Program

The UNC School of Government and the Environmental Finance Center has developed a model stormwater ordinance. The ordinance includes a section on Illicit Discharges. Developing a Stormwater Ordinance

Can combine structural and non-structural BMPs. Adequate long-term operation and maintenance of structural BMPs. Annual inspection reports of permitted structural BMPs performed by a qualified professional. (b) Establish strategies which include BMPs appropriate for the MS4

Water Supply Watershed areas (WS-I - WS-IV) HQW and ORW watersheds Neuse River Basin stormwater program areas Tar-Pamlico River stormwater program areas Randleman Lake Water Supply Watershed These areas already comply with Phase II:

LOW DENSITY: (A) No more than two DUs per acre or 24% built-upon area. (B) Use vegetated conveyances to the maximum extent practicable. HIGH DENSITY: (A) Structural BMPs must control and treat the difference between pre- and post-development conditions for the 1-year 24-hour storm. (B) Structural BMPs must be designed to achieve 85% average annual removal of total suspended solids. (C) Stormwater management measures must comply with the requirements listed in 15A NCAC 2H.1008(c). All other areas must meet or exceed this:

DWQ has developed a draft Stormwater BMP Manual. 357 pages! Establishing BMP Design Standards

Stormwater wetlands Bioretention Wet detention basin Dry extended detention basin Grass swale Filter strip Infiltration systems Manufactured BMPs Buffer Permeable pavement Rooftop runoff management Sand filter Stormwater BMP Manual

Definition Description and purpose Advantages Disadvantages Location/general characteristics Design Cost Performance enhancers Construction guidelines Monitoring Maintenance References and additional resources Stormwater BMP Manual

Comments on the manual are due by September 30th. It will take 3-6 months after September to prepare a final version. Stormwater BMP Manual

Control the sources of fecal coliform to the maximum extent practicable. Develop and implement an oversight program to ensure proper operation and maintenance of septic systems. Municipalities must coordinate this program with the county health department. (c) Establish a program to control the sources of fecal coliform to the maximum extent practicable

This model ordinance provides language that will allow a jurisdiction to enforce maintenance obligations for septic systems. As a start, the jurisdiction should consider how to integrate the existing health department permit data for onsite systems into an inventory of onsite systems in the Phase II jurisdiction. Septic System Maintenance

Develop, adopt, and implement an ordinance to ensure that the BMPs for reducing nutrient loading are selected. In areas where the EMC has approved an NSW Stormwater Management Program, the provisions of that program fulfill the nutrient loading reduction requirement. Develop and include a nutrient application (fertilizer and organic nutrients) management program. (d) Establish nutrient sensitive waters (NSW) protection measures (for programs with development or redevelopment draining to NSW waters)

Jurisdictions in the Neuse and Tar-Pamlico basins can follow their existing NSW Stormwater programs. Other Phase II jurisdictions with NSW waters can use the Neuse and Tar-Pamlico programs as examples. Establishing NSW Protection Measures

Keep all built-upon areas at least 30 feet landward of perennial and intermittent surface waters (USGS and Soil Survey maps). Have deed restrictions and protective covenants to ensure that future development activities maintain the development (or redevelopment) consistent with the approved plans. Both low and high density developments must:

Phase II local governments may develop comprehensive watershed protection plans to meet part, or all, of the requirements for post-construction stormwater. Watershed Protection Plans

Some examples: Bioretention areas Stormwater wetlands Sand filters Wet ponds Buffers Water reuse Green roofs What BMPs can you use?

NCSU campus Golf course in Kinston Bioretention areas are landscaping features adapted to provide on-site treatment of storm water runoff. Surface runoff is directed into shallow, landscaped depressions.

Bioretention areas are usually designed to use many of the pollutant removal mechanisms that operate in forested ecosystems. NC Aquarium in Dare County Strip mall in Charlotte, NC

Stormwater wetlands are similar to wet ponds but also incorporate wetland plants into the design. As stormwater runoff flows through the wetland, pollutants are removed through settling and biological uptake. Constructed wetland in Avery County, NC

Stormwater wetlands are fundamentally different from natural wetland systems. Stormwater wetlands are designed specifically to treat stormwater runoff, and have less biodiversity than natural wetlands.

Sand filters are good options in ultra-urban areas because they consume little space. Underground and perimeter sand filters in particular are well suited to the ultra-urban setting because they consume so surface space.

Sand filters are an excellent option to treat runoff from storm water hot spots because stormwater has no interaction with groundwater. (Hot spots include areas where vehicles are fueled, serviced, washed or stored and places where hazardous materials are generated or stored.)

Ponds remove stormwater pollutants through settling and biological uptake.

Buffers are areas along a shoreline or stream where development is restricted or prohibited. Buffers cleanse stormwater and provide a physical barrier to protect waterways.

Water reuse involves capturing stormwater from a roof before it is discharged into a storm drain. This reduces peak flow and also reduces the need to purchase treated water.

Green roofs are simply a layer of vegetation grown on a layer of soil and drainage material on a rooftop. Rainwater is stored in the layers of drainage material for a short time before it is discharged.

 DWQ recently initiated the USMP, which would be a voluntary new program.  The USMP would allow a local government to implement a single set of post-construction requirements throughout its entire jurisdiction.  The USMP would be more straightforward, easier to implement, and more protective of the natural environment. Universal Stormwater Management Program (USMP)

The USMP would combine the following programs: NPDES Phase 2 WS-II WS-II Critical Area WS-III WS-III Critical Area WS-IV WS-IV Critical Area HQW – freshwater ORW – freshwater Coastal counties HQW - saltwater ORW - saltwater Shellfishing (SA) Neuse & Tar-Pamlico NSW 401 Certifications

Durham County Before & After the USMP

Montgomery County Before & After the USMP