OEC Webinar on Nuclear Safety New Airborne Dispersion Modeling and Its Impact on Safety Basis Documentation at a DOE Waste Handling and Processing Facility.

Slides:



Advertisements
Similar presentations
Incident Command System
Advertisements

1 NYP BEST PRACTICES EXISTING CONDITIONS SURVEYS Presentation to Approved A/E Vendors to NYP June 17, 2013.
1 Component Design Basis Inspection (CDBI) Graydon Strong 6/17/14.
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
Meteorology Combined License NRC Review Process Meteorology Joseph Hoch Physical Scientist U.S. Nuclear Regulatory Commission June , 2008 Nuclear.
Responsible CarE® Process Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
US NRC Protective Action Recommendation Study National Radiological Emergency Preparedness Conference April 10, 2008 Las Vegas, NV Randy Sullivan, CHP.
BRC Storage & Distribution Safety and Quality Management System Training Guide
Lindy Hughes Fleet Fire Protection Program Engineer Southern Nuclear Operating Company June 4, 2013 Fire Protection.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
Contractor Management and ISO 14001:2004
California Accidental Release Prevention Program California Accidental Release Prevention (CalARP) Program.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.7 Commissioning Geoff Vaughan University of Central.
Responsible CarE® Employee health and Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
TRAINING AND DRILLS. Training and Drills Ensure A comprehensive, coordinated, and documented program as an integral part of the emergency management program.
CD NS Chief, Defense Nuclear Safety FIRE PROTECTON FUNCTIONAL AREA CDNS BIENNIAL REVIEWS May 15, 2012 Carl Sykes.
ToR of GEOSAF2 WG on Operational Safety Review of WG2.
Excavation Instructional Goal: through class participation and discussion, the participant will identify the issues and hazards related to trenching and.
Onsite Transportation At SRS Robert W. Watkins Manager Packaging & Transportation Services Contractors Transportation Management Association 2015 July.
Control Selection Techniques Employed for D&D Projects with Emphasis on Nuclear Criticality Safety Controls Brenda L. Hawks Engineering Director Oak Ridge.
Readiness Review Course November Nov Readiness Review Course Introduction – Mod 1.
Federal Emergency Management Agency Radiological Emergency Preparedness Program Region I, Boston September 10, 2012.
SRNS-F Comparison of Parameters for Modeling Tritium Dispersion Accident Analyst Nuclear & Criticality Safety Engineering Savannah River.
NEI Issues & Current Events George Oliver June 22, th Annual RETS – REMP Workshop South Bend, Indiana.
Nov Readiness Review Course Implementation Plan - Mod 8 Screening or Scoping Meeting (ORR vs RA, Authorization Authority (AA) Defined, Startup Notification.
Quality Assurance Program National Enrichment Facility Warren Dorman September 19, National Energy and Environmental Conference.
QA Requirements for DOE Accelerator Safety System Software K. Mahoney Group Leader, Safety Systems TJNAF Presented at the 2008 DOE Accelerator Safety Workshop.
Carol L. Sohn Senior Nuclear Safety Advisor, Office of Science, SC-33 1 May 5, 2011 Review of Science Sites Hazard Categorization.
Fatigue Management Rule Russell Smith Nuclear Energy Institute (NEI)
FIRE PROTECTION TOPICS OF INTEREST Defense Nuclear Facilities Safety Board.
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
October Training 8 HR Ref. Content Overhead Utilities Risk Assessments Task Safety Environmental Analysis Health and Safety Plan Components of a HASP Questions?
Clarification of Safety Basis Topics from DOE-STD
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
DOE Order 413.3A Program and Project Management for the Acquisition of Capital Assets Catherine Santana Deputy Director, Project Management Systems, OECM.
Nicolas Solente Workshop on Regulatory Requirements to Ensure Safe Disposal of Disused Sealed Sources for Operators and Regulators Amman, JORDAN 7-11 April.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
1 Current Issues in Siting Safety Reviews Michelle Hart, Sr. Reactor Engineer Division of Site and Environmental Reviews NRC Regulatory Information Conference.
Repository Design Overview Presented to: NSNFP Meeting Presented by: Joe Price Office of Repository Development April 13, 2005 Bethesda, MD.
Integration of Safety into the Design Process Overview of DOE-STD-1189 Richard Black, Director Office of Nuclear & Facility Safety Policy.
Comparison of the AEOLUS3 Atmospheric Dispersion Computer Code with NRC Codes PAVAN and XOQDOQ 13th NUMUG Conference, October 2009, San Francisco, CA.
1 ESTABLISHMENT OF REQUIREMENTS Module “DECOMMISSIONING PROCESS” Project BG/04/B/F/PP , Program “Leonardo da Vinci”
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
Software QA Safety Systems at SLAC Enzo Carrone Controls Department – Safety Systems SLAC National Accelerator Laboratory.
Fire Hazards Analysis the ORNL Approach Jeff Sipes Fire Protection Engineer April 17, 2007.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
IAEA International Atomic Energy Agency IAEA Safety Standards for Research Reactors W. Kennedy Research Reactor Safety Section Division of Nuclear Installation.
IAEA International Atomic Energy Agency Technical Meeting on the Demonstration of Operational and Long Term Safety of Predisposal Management Facilities.
Research and Test Reactor Decommissioning Inspections Gerald A. Schlapper, PhD, PE, CHP Health Physicist Division of Nuclear Materials Safety Region I.
IAEA International Atomic Energy Agency TM Technical Meeting to Discuss Human Intrusion and Future Human Actions in relation to Disposal of Radioactive.
Improving performance, reducing risk Dr Apostolos Noulis, Lead Assessor, Business Development Mgr Thessaloniki, 02 June 2014 ISO Energy Management.
CDM Construction Design and Management
Safety of At-Reactor High-Density Storage of Fuel in Pools Steve Jones Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission International.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
By Annick Carnino (former Director of IAEA Division of Nuclear Installations Safety) PIME, February , 2012.
1.9. Safety assessment “School for Drafting Regulations on Radiation Safety, IAEA - Module 1 Regulatory framework for safety, authorization and inspection.
Use and Conduct of Safety Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decission Making Workshop Information IAEA Workshop Lecturer.
Lowell Randel Global Cold Chain Alliance/ International Institute of Ammonia Refrigeration.
Best Practices in Performing DSA Legacy Reviews
The ORR/RA and the Authorization Basis May 2005 Revision
South Carolina Perspective on Part 61 Proposed Revisions
Flooding Walkdown Guidance
Mitigation of Beyond Design Basis Events (MBDBE) Rule Implementation
Research and Test Reactor Decommissioning Inspections
Chemical Purchasing.
TRTR Briefing September 2013
Introduction: IAEA activities / Documents on human intrusion
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Research and Test Reactor Decommissioning Inspections
Presentation transcript:

OEC Webinar on Nuclear Safety New Airborne Dispersion Modeling and Its Impact on Safety Basis Documentation at a DOE Waste Handling and Processing Facility

OEC Webinar on Nuclear Safety - What Initiated the Need for a New DOE Nuclear Facility Safety Basis Offsite and Onsite dispersion analyses?

OEC Webinar on Nuclear Safety Initially, DOE Office of Health, Safety, and Security issued Safety Bulletin No Accident Analysis Parameter Update, in May The bulletin identified issues related to the use of deposition velocity parameter assumptions when determining the atmospheric dispersion factor (x/Q) that is used in dose consequence modeling Initially, DOE Office of Health, Safety, and Security issued Safety Bulletin No Accident Analysis Parameter Update, in May The bulletin identified issues related to the use of deposition velocity parameter assumptions when determining the atmospheric dispersion factor (x/Q) that is used in dose consequence modeling.

New Airborne Dispersion Methodology Complex-Wide Meetings Took Place. However, there was much discussion throughout DOE sites regarding the best approach for the new assumptions. As such, DOE provided direction to us in two letters (June 24, Site- Specific Dispersion Analysis Parameters, and January 23, Clarifications of Site- Specific Dispersion Analysis Guidance) regarding assumptions to be used in the recalculation of x/Q.

As a result, we modified the previous Documented Safety Analysis (DSA) dispersion methodology in which we calculated new onsite and offsite x/Q (“Chi over Q”) values using the simplified approach outlined in the Nuclear Regulatory Commission (NRC) Regulatory Guide 1.145, Atmospheric Dispersion Models for Potential Accident Consequence Assessments at Nuclear Power Plants. This new approach is discussed in our DSA and is the basis for recalculation of consequences in the Preliminary Hazard Analysis (PHA) tables and all site accident scenarios modeled in our DSA.

Impact… When compared to x/Q used for ground level releases in our previous DSA, the value was increased by a factor of 1.3 at the 100m receptor location; 2.88 times higher at the 900 meter receptor location; and 3.97 times higher at the 1,200 meter location. Staging area fires (outside) in the previous DSA were modeled as buoyant plumes based on various assumed fire sizes, consistent with provisions of DOE-STD When the new ground level release x/Q is compared to these lofted plume x/Q values for fire sizes up to 10 MW, the previous DSA calculated x/Q at the touchdown location of the maximum receptor was increased by a factor of 60 to 80, depending on the site boundary distance being compared (i.e., 900 meters or meters). This means that consequences for all hazard scenarios and accidents in the new DSA were increased according to the requisite increase in x/Q.

Impact… Our DOE review team evaluated the associated assumptions, methodology, and results. This document was also reviewed by the DOE Headquarters Chief of Nuclear Safety and shared with the Defense Nuclear Facilities Safety Board and determined that the revised site atmospheric dispersion model was compliant with Appendix A, of DOE-STD , CN3. Additionally, the newly calculated x/Q values have several inherent conservative assumptions relative to the previous DSA, including:  Modeling of ground-level releases  Default surface roughness length of 3 cm versus previous values of 40 cm  Use of the shortest distance for all 16 sectors, and  Use of a dry deposition velocity value of zero rather than the previous assumed value of 1 cm/s The DOE review team concurred with the new conservative methodology.

Changes in Hazard and Accident Scenarios Several factors resulted in significant changes to the hazard and accident analysis First, atmospheric dispersion analysis methodology changes resulted in an increase in accident consequences reported for events in the PHA tables and the accident analysis. This led to additional events being selected and modeled in the Accident Analysis. As consequences were increased, it also led to more detailed analysis in some cases (e.g., seismic, aircraft crash, various vehicle pool fires).

Changes in Hazard and Accident Scenarios Second, other new events were also modeled based on the incorporation and evaluation of four other new activities that came about as a result of our site’s increased mission and the resultant new conditions. This included consideration of a new suite of accidents. Based on these collective factors, the number of hazard scenarios identified in the PHA table was increased. As a result, the bounding and representative PHA events selected as accident scenarios and further modeled in the accident analysis was increased from 21 events to 40.

Changes in Hazard and Accident Scenarios As a result of increased consequences driven by changes in atmospheric dispersion methodology and other factors, the safety SSCs [Structures, Systems, and Components] and SACs [Specific Administrative Controls] were modified. Two SC [Safety Class] SSCs and seven SS [Safety Significant] safety SSCs were added in the DSA revision, while three other existing SS SSCs were removed. None of these SSCs involved active systems. In the previous DSA, there were 14 Specific Administrative Controls involving inventory limits in various areas of the facility. This number was expanded to 21 SACs in the DSA revision, as staging areas were re- designated with new boundaries and MAR limits in many areas were reduced to offset the increased consequences of the new atmospheric dispersion methodology.

Result  Certain waste transportation containers are now Safety Class.  Vehicle Impact Barriers are now required in areas to protect waste.  Liquid impediments had to be installed around various areas.  Waste staging building construction became credited.  The above-grade nature of some buildings became credited as not allowing fuel to run into the building where the waste is stored.  Various facility/ building MAR [Material-At-Risk] limits were reduced so that no one single fire would involve too much waste.  Vehicle Spotters and Fuel Attendants (think “escorts”) are required during movement of waste in certain areas.  Credit was taken for various ground/asphalt slopes, grades, and drainage around the site so that fuel cannot run into buildings storing waste.  Various specific waste container design criteria became credited.  Various waste staging area configurations became credited.

Result Various new Specific Administrative Controls (SACs) were required including:  New lower inventory limits were assigned to certain facilities.  Some waste containers now have to be overpacked in secondary containers.  No internal combustion-type vehicles /forklifts can be used to transport waste: only electric forklifts or manual-type, i.e., pallet jacks.  Fuel (greater than a specific quantity) cannot be present within 75 feet of waste being transported. This required traffic reconfiguration controls, use of additional boundaries such as gates, chains, and posting of new signage.  Establishment of new “fuel exclusion zones”.  Crane use restrictions near waste.  More restrictive container stacking limitations were established.  Concrete Jersey Barriers are now required around certain areas.

Implementation of These Controls Involved:  Site physical configuration modifications.  Over 50 operational and administrative documents being revised.  Conduct of an internal Management Self-Assessment (MSA) and Implementation Verification Review (IVR), and DOE-witnessed practice evolutions using the new controls, documents, and configurations.  Cooperative efforts with other contractors at adjacent sites.  Minor impacts to adjacent sites’ safety basis documents.  Training Program updates and rewrites.  Extensive training classes and practice evolutions.

Implementation of These Controls Involved: By far, the most significant efforts as a result of the new release criteria were:  Updating the safety basis  Rewriting over 50 procedures and other documents  Purchasing and installing the additional equipment (vehicle barriers, etc.)  Developing and presenting to all employees training on the new controls.

 The DOE review team evaluated the TSRs and determined that:  TSRs were consistent with the set of newly identified controls identified in the DSA.  Affected sections of the TSR were appropriately updated as needed.  Overall, the team concluded that definitions were complete and appropriate to support controls in other sections of the TSR.  Minimum staffing was modified as needed to implement new SACs.  SACs were updated with sufficient clarity to support proper implementation.  Bases were provided and were complete for each SAC to facilitate proper implementation.  Design Features captured the appropriate performance criteria derived in the DSA.  Interfaces with other contractor TSRs were consistent with that derived in the DSA and ensure compliance with new site waste staging restrictions and planned operations.  The DSA incorporates the appropriate changes associated with new dispersion methodology and brings closure to outstanding actions related to Safety Bulletin No , Accident Analysis Parameter Update.

THANK YOU OEC …. for the opportunity to present this information..  We have been very privileged to be among the leaders in this safety basis upgrade effort.  Through a significant training effort our site personnel have embraced the need for the upgrades.  Equally important, the DOE and project management have dedicated the resources we needed to accomplish this large and challenging initiative.