Last Planner: A Case Study in Learning from Anomalies and Breakdowns Glenn Ballard Nottingham Trent University May 7, 2014.

Slides:



Advertisements
Similar presentations
MAINTENANCE PLANNING AND SCHEDULING
Advertisements

Last Planner ® National Capital Region Community of Practice Victor Sanvido – Southland Industries Matt Bruening – Southland Industries 1.
ONIT Consulting LLC Who’s on your project? Q9 Initiative Presented by: Anna Gabara.
The A3 Process and A3 Thinking
April 23/14. Ursa Major SAFETY HEALTH & ENVIRONMENT April 6:00 Previous 24 Hours Total to Date First Aid Record. Injury TURNAROUNDS & MAJORS TURNAROUNDS.
Problem Solving. Objective of Problem Solving OODA Loop Problem Solving Process – Types of “problems” – 8 StepsOverview.
P2SL - PROJECT PRODUCTION SYSTEMS LABORATORY Last Planner Initiative – Look ahead Planning, March 06, 2009 CPMC Cathedral Hill Hospital Project Look ahead.
Lean Manufacturing "There is only one boss: the customer. And he can fire everybody in the company, from the chairman on down, simply by spending his money.
(c) 2007 Mauro Pezzè & Michal Young Ch 1, slide 1 Software Test and Analysis in a Nutshell.
Engineering Management MSE507 Lean Manufacturing "There is only one boss: the customer. And he can fire everybody in the company, from the chairman on.
Project Management “Introduction to Project Management: Tools, Techniques, and Practices” BA 320 Operations Management.
HUMAN RESOURCE MANAGEMENT Introduction Human Resource Strategy Human Resource Planning Recruitment and Selection Training and Development Performance Management.
Sense of Initiative and Entrepreneurship This project has been funded with support from the European Commission. This [publication] communication reflects.
Partnering and Collaborative Working An Introduction Dr Neil Jarrett.
Emporia State University Phil Bennett (Some Slides by Dr. Larry Lyman) Teacher Work Sample The Teachers College.
Dan Frasier, PE, CCP Successful Turnover of New and Renovation Construction Projects Successful Turnover of New and Renovation Construction.
Production management in Skanska Finland Sakari Pesonen.
Chapter 11. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
Project Life Cycle.
What is design? Blueprints of the instructional experience Outlining how to reach the instructional goals determined during the Analysis phase The outputs.
Phase Scheduling Glenn Ballard P2SL Research Workshop April 30, 2008
Quality Management.
Problem Solving.
PERT and CPM.
Project Management Project Planning. PLANNING IN PROJECT ENVIRONMENT Establishing a predetermined course of action within a forecasted environment WHY.
Combating Uncertainty in the Workflow of Systems Engineering Projects
Project Management.
1  2002 North Haven Group 1 Six Sigma Improvement Process Improve Phase Activities Introduction Identifying Solutions Evaluating Potential Solutions Solution.
Lean Office - Total Quality Management managementsupport
Managing programs that promote personal effectiveness.
Workflow Recovery with Ensuring Task Dependencies Presented by Yajie Zhu March 08, 2005.
The “Seven Deadly Sins” of Running an Alfresco Project Sabine Otto Director Consulting Services EMEA The Alfresco Implementation Methodology.
3.0 DESIGN PROCESS FOR THE PROPOSED PROJECT 3.1 TIME PLANNING Now, having understanding the Project Management in general and its strategy in the project.
Engineering Design Building the Team. Elements of Cohesive Teams Trust Willingness to engage in conflict Commitment Accountability Attention to results.
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
HCIS 410 Read, Lead, Succeed/Uophelpdotcom For more course tutorials visit
MIS Project Management Instructor: Sihem Smida Project Man agent 3Future Managers1.
If you can’t say “no”, you can’t make a promise
Improvement Kata & Coaching Kata
Outline Background Purpose Organization Plan Overview
HCIS 410 AID Experience Tradition /hcis410aid.com
Production Management Across a Programme of Design Projects
Project Management What is Project Management?
What is Lean Construction?
CERN Construction Planning and Scheduling (LHC installation)
Maintenance Scheduling
Fall 06 ECE 361 Project Schedule
Unified Modeling Language
4.05 Time Management.
Problem Solving Updated Jun 2016.
Instructional Design Models
Project Management.
Overview – Guide to Developing Safety Improvement Plan
MAINTENANCE PLANNING AND SCHEDULING
رؤية مستقبلية لتطوير كلية الزراعة جامعة الفيوم
HCIS 410 Education for Service-- snaptutorial.com.
HCIS 410 Teaching Effectively-- snaptutorial.com.
Overview – Guide to Developing Safety Improvement Plan
NERC Congestion Management Tool – Project Schedule
How do you get people to do what they say they are going to do?
PROJECT MANAGEMENT (BSBI 622)
Project management Project management 4th semester, 2 nd year.
I love the sound they make as they fly by.
Project management Learning Unit 5.
Tools for Implementation
Tools for Implementation
What is a Value Stream Map?
PDCA PROBLEM SOLVING TRAINING SESSION 1. Kaizen our way of life Prepared by: Serge Paluku.
Process improvement for the lab
Presentation transcript:

Last Planner: A Case Study in Learning from Anomalies and Breakdowns Glenn Ballard Nottingham Trent University May 7, 2014

Improving Processes Toyota’s improvement KATA: (1) vision, direction, or target; (2) grasp of the current condition, (3) next target condition on the way to the vision is defined, (4) strive to move step by step toward that target condition, we encounter obstacles that define what we need to work on, and from which we learn In Toyota, line managers carry out 90% of improvement projects. Training (Sensei) should target: awareness, change, mastery and consistency. Focus on the purpose of using the methods.

Construction Weekly Work Plan ©Glenn Ballard 2011

Improving Processes: Last Planner example Current condition: chronically low Percent Plan Complete (PPC) Target Outcome: Better match between DID and WILL Target Condition: Only well defined, sound, sequenced, and sized tasks are allowed on weekly work plans Outcomes: – Better match between DID and WILL – Better productivity – Some impact on project durations

Impact of PPC on Productivity PPC Performance Factor 50%.96 60%.84 70%.77 80%.71

Climbing the PDCA staircase

Improving Processes: Last Planner example Current Condition: DID could perfectly match WILL and the project be falling behind schedule. Need a ‘make ready’ function. Target Condition-1: Constraints on tasks planned for execution in the next 3 weeks are assumed to exist unless known to have been removed. Target Condition-2: Breakdown tasks into operations

What is a Construction Operation? – Projects are composed of phases. – Phases are composed of processes. – Processes are composed of operations. – Operations are composed of steps. – Steps are composed of elemental motions. ©Glenn Ballard 2011

What is a construction operation? ©Glenn Ballard 2011

Improving Processes: Last Planner example Current Condition: DID could perfectly match WILL and the project be falling behind schedule. Need a ‘make ready’ function. Target Condition-1: Constraints on tasks planned for execution in the next 3 weeks are assumed to exist unless known to have been removed. Target Condition-2: Breakdown tasks into operations Target Condition-3: Design operations collaboratively with those who are to perform them

In what operations should we invest? New- we must learn how to do them (new product design or new tools) Critical- we cannot afford to fail (hazardous, time-critical) Repetitive- small improvements can have large impact ©Glenn Ballard 2011

How are Construction Operations Designed? Virtual prototyping Physical prototyping (mock-ups) First run studies (for repetitive operations) ©Glenn Ballard 2011

Improving Processes: Last Planner example Current Condition: Make ready improves the match between CAN and SHOULD but does not entirely eliminate plan failures. Target Condition: Analyze plan failures to actionable causes and apply countermeasures to prevent reoccurrence. Outcome: Implementation challenges, but good results where applied.

Climbing the PDCA staircase

Improving Processes: Last Planner example Current Condition: Project programs (schedules) tend to be badly structured. Target Condition: Front line supervisors collaboratively plan how to do the work in each project phase, using pull planning. Result: Better specification of SHOULD

The Last Planner ® System of Production Control Master Scheduling Weekly Work Planning Lookahead Planning Learning Phase Scheduling (pull) Set milestones and phase durations & overlaps Specify handoffs & conditions of satisfaction between processes within phases SHOULD CAN WILL DID Identify & remove constraints Breakdown tasks from processes into operations Design operations Make reliable promises Measure PPC, TMR & TA Use 5 Whys to identify actionable causes Act to prevent reoccurrence ©Glenn Ballard 2011

Thank you for your attention. I look forward to hearing your Takeaways and Questions