State company «Russian highways» General presentation June 2011.

Slides:



Advertisements
Similar presentations
EURORAIL Project Organizational model. EURORAIL Project Initiator: Ministry of transport and communications of Ukraine Lviv Oblast State Administration.
Advertisements

16 years on the transport market. PPP – a tool of implementing compound integrated development projects as exemplified by the infrastructure transport.
NIZHNY NOVGOROD REGION Business, educational and cultural centre of the Volga Federal District NIZHNY NOVGOROD REGION Population – 3.3.
The existing and the future sectors of M0 ring The construction of the eastern sector of motorway M0 is an overdue debt. M0 collects and distributes.
Bulgaria’s strategic road infrastructure challenges.
1 1 FINANCIAL PERFORMANCE June 30, 2012 дата проведения OVER THE FIRST HALF OF 2012.
Strengthening Investment in Transport Infrastructure to Address the Financial Crisis by Joint Effort 6th APEC Transportation Ministerial Meeting (TPTMM6)
Role of State Role of State in implementation of major PPP road projects Panagiotis Patsiadas Deputy Head of Contracts & Bids Unit, International Project.
The road transportation infrastructure program for Romania.
Montenegro Ministry of Transport, Maritime Affairs and Telecommunications Vienna Economic Forum »Invest in Montenegro. Invest in the Region « M I N I S.
 «South Caucasus Railway» CJSC The perspectives of Armenia’s and South Caucasus Railway Integration into the Eurasian Transport System.
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS DIRECTORATE GENERAL PROGRAMMING OF REGIONAL DEVELOPMENT Operational Programme Regional Development.
TRACECA PROJECT EVALUATION. Mark the location of the project on the map with a plain, black line or dot. Constanta – Vama Veche Motorway section.
Financing Urban Public Infrastructure
1 URALSIB BANK May I. UralSib Financial Corporation.
ROADS IN UKRAINE 1. 2 SECTOR INFORMATION  Ukraine has significant potential for motorway development due to its location on the intersection of multiple.
Customer: FGU “Roads of Russia” General Designer: CJSC “Peterburg-Dorservice” Project “Construction of Moscow – Saint-Petersburg Express Highway, km 15.
June 2013 Building the New Silk Road: EBRD transport infrastructure investments in Central Asia Askar Namazbayev, Infrastructure Russia and Central Asia.
Imagine the result European Infrastructure Friedrich Schneider, Executive Board Member August 4, 2010.
Prospects and challenges in view of the development of road connectivity in the SCO region Ufa, Russian Federation, 13 May 2015 Umberto de Pretto Secretary.
INVESTMENT PROJECT PROPOSAL Construction of the railway line Marculesti-Soroca, and the bridge over the Nistru river Construction of the railway line Marculesti-Soroca,
Some issues of transport-logistics business in Saint-Petersburg Mikhail Pimonenko North-West Russia Logistics Development Center Rail Baltica Growth Corridor.
TRACECA PROJECT EVALUATION
PPP in Lithuania March, 2011.
1 COUNTRY REPORT KEC TECHNICAL TRAINING PROGRAMME, 2011.
Building of multifunctional geothermal rehabilitation town InterMedicalEcoCity Project goal: «InterMedicalEcoCity» - is an International Medical Rehabilitation.
OPPORTUNITIES FOR INVESTMENT IN THE STATE OF GOIAS DEVELOPMENT INFRAESTRUCTURE OF TRANSPORT IN METROPOLITAN REGION OF GOIÂNIA.
1 MINISTRY OF TRANSPORT 1RailNetEuropeDB Netz AG, NM (EB) Oer Bulgarian Membership in EU and Transatlantic cooperation: strong and competitive business.
PUPLIC-PRIVATE PARTNERSHIP AS AN INSTRUMENT OF DEVELOPMENT OF THE TOURIST INDUSTRY POST-GRADUATE STUDENT OF THE DEPARTMENT OF ECONOMICAL AND FINANCIAL.
Financing and regulating highway construction in Scandinavia – experiences and perspectives Svein Bråthen Molde University College
The State Road Administration of Ukraine Infrastructure projects of road network development Kyiv
"State-Business Cooperation in the RK. Infrastructure Construction"
 PPP Department within the Ministry of Economy and Transport  Government Decree in May 2003 to set up an Interdepartmental Committee – Ministry of Economy.
Public transport on Estonia Arne Tilk. Public transport on Estonia 1. Is collective transport (in Estonia) considered as a service of general interest?
A European Commission funded Regional Programme since Improvement of the road section of Gerede - Gürbulak Border Gate and Impacts Evaluation.
STATE POLICY AND PERSPECTIVES FOR DEVELOPMENT OF THE RAILWAY INFRASTRUCTURE MINISTRY OF TRANSPORT, INFORMATION TECHNOLOGY AND COMMUNICATIONS REPUBLIC OF.
1 APPLICATION ON THE SPANISH CONCESSIONAL MODEL TO CENTRAL AND ESTERN EUROPE WORLD BANK WORKSHOP ON PPP IN HIGHWAYS: INSTITUTIONAL, LEGAL, FINANCIAL AND.
TRACECA CONSTRUCTION OF INTERMODAL TERMINAL IN THE REGION OF RUSE CITY BULGARIA Infrastructure Working Group Kiev, 11 May 2011.
System of Export Support in the Russian Federation.
Project # 1 Rikoti-Zestaponi Highway May, Rikoti-Zestaponi Highway 11/29/2015Ministry of Regional Development & Infrastructure of Georgia 2 Poti.
H\projects\controls\ekdilosi\tecnoman\ ppt Prospects of drafting Prospects of drafting Black Sea Ring Highway Black Sea Ring Highway Master Plan.
Oct Project Fund- An Instrument to Finance Infrastructure Projects Two Case Studies.
COMPLEX DEVELOPMENT OF UST-LUGA SEAPORT AND ADJACENT TERRITORY Svetlana Makarova, Srategy and Development Director Marina Lebedeva, Environmental Projects.
Menno Langeveld Senior Consultant NEA
Location The park is located between the major centers of consumption in Russia Industrial Park MSB-Udomlya is located in the Tver region. The developed.
Trade Facilitation & Regional Integration Asia Pacific Perspectives Expert Meeting on Trade Facilitation as an Engine for Development September.
Rail Schemes and the PPP Model November Rail Schemes and the PPP Model  Rail Schemes  PPP model  Successful Projects  Lessons Learned  Conclusions.
Country Report: Latvia Tālis Straume Latvian State Roads.
PRESENTATION OF SMOLENSK REGION
1. Initiator and goals of the project Initiator of the project – the Investment Promotion Agency of Novosibirsk region – a specialized organization for.
RISE Capital: Brief overview of activities. Investment philosophy Focus on the PPP sector RISE Capital АВ (”RISE”) is one of the largest private investment.
Madrid-Marbella-Málaga-Almería-Murcia-Alicante-Londres-Francia-Bulgaria-Rumanía-Alemania-Italia-Marruecos-Turquía-Portugal-Brasil
Tyumen Region  .
Challenges for BRICS International finance and Technology transfers
Building the New Silk Road: EBRD transport infrastructure investments in Central Asia Askar Namazbayev, Transport Team 12 March 2013.
Vice President: Lin Zhonghong Economic & Planning Research Institute
Speaker – Sergey S. Shavzis MS, General director
«We will start carrying out promising projects such as the formation of international transportation corridors, including those from the Baltic via the.
«We will start carrying out promising projects such as the formation of international transportation corridors, including those from the Baltic via the.
Country Report: Latvia
Ministry of Transport Viet Nam
Operation of the State Company AVTODOR French practices in Russia
ROAD INFRASTRUCTURE DEVELOPMENT PROGRAMME ZIMBABWE
Port Infrastructure Development for Ensuring Sustainability
REPUBLIC OF ARMENIA Seoul, Korea September 2017.
RING OF CHISINAU AS PART OF TENT - NETWORK
»Invest in Montenegro. Invest in the Region «
PRIORITY POJECTS OF THE TRANSPORT SECTOR OF THE REPUBLIC OF TAJIKISTAN
Proposal for Financing Balti - Criva road sector rehabilitation
Republic of Moldova Ministry of Transport and Road Infrastructure
Presentation transcript:

State company «Russian highways» General presentation June 2011

State company “Russian Highways” was created by the federal law №145-FZ in order to maintain and develop the highways network of Russia, improve road services and infrastructure. Russian Federation is the founder of the State company. Acting as a state organization State company “Russian Highways” attracts investments using PPP mechanisms. introduction - Attract investments using various PPP mechanisms - Maintain roads of the State company - Collect tolls and implement tolling - Manage the ROW and wayside - Carry out functions of the grantor on concession agreements goals 2

Government of the Russian Federation approved the long-term development program of the State Company “Russian Highways”. According to the program, planned investments of the State company for the years are 35,7 billion euro, 24,1 billion euro (67,5%) of which are federal subsidies, and 11,6 billion euro (32,5%) – private financing. funding used forms of public-private partnership 3 concessions Direct toll Availability payments O&M contracts investment agreements for pre-project stage implementation with following concession possible (D+BTO) investment agreements for pre-project stage implementation with following concession possible (D+BTO) long-term contracts for construction and operation (BOT) long-term contracts for construction and operation (BOT)

prospective highways network of the State company by the year 2030 federal roads regional roads state border transit points legend: toll roads prospective roads Moscow By the year 2030 the total length of the road network of the state company will reach approximately km. 4

existing highways network of the State company RoadLength, km Asset management transfer year Federal highway М-4 «Don» Federal highways M-1 «Belarus» Federal highway М-3 «Ukraine» legend: roads transferred in 2010 roads to be transferred in 2011 Moscow 5

№ProjectConstruction timeLength 1Reconstruction of the M-4 “Don” federal highway km 2Reconstruction of the M-1 “Belarus” federal highway ,9 km 3Construction of the new Moscow – Saint-Petersburg highway km 4 Construction of the new transport corridor “Center -Urals” (Moscow – Nizhniy Novgorod – Kazan – Yekaterinburg – Tyumen) km 4.1 Construction of Noginsk bypass (head part of the corridor “Center –Urals”) km 5Reconstruction of the M-3 “Ukraine” federal highway ,8 km 6 Construction of the international transport corridor “Europe – Western China” (Saint-Petersburg – Vologda – Kazan – Orenburg – Kazakhstan border) 2011 – km priority projects: 6 7Construction of the Central ring road km

first concessions in Russia New Moscow – Saint- Petersburg highway construction New exit from the Moscow Ring Road and Odintsovo bypass The construction of the head part of the section 15 km – 58 km will start in 2010, and is realized on a concession basis by the «North-West concession company» LLC (group «Vinci», France). Construction cost – 1,48 billion euro, State financing – 38,6%, 0,57 billion euro, Private financing – 61,4%, 0,91billion euro, Construction time – , Concession type – direct toll Concession agreement for the new exit from the Moscow Ring Road and Odintsovo bypass at the federal highway M-1 “Belarus” was signed on the 17 th of July 2009 with «Main road» CSC ( MC“Lider”, Alpina, FCC, Brisa). Construction cost – 0,533 billion euro, State financing – 51,18%, 0,272 billion euro, Private financing – 48,82%, 0,261 billion euro, Construction time – , Concession type – direct toll Length43,1 Lanes10/8/6 Speed150 km/h Toll systemclosed Length18,5 Lanes8/6 Speed120 km/h Toll systemclosed 7

Moscow Saint-Petersburg Valday national park Novgorod Moscow – Saint-Petersburg highway (km 58 – km 684) Road sectionLength, kmConcession type Concession tender time Construction time Construction cost, thousands € Private funds km 58 – km 14991direct toll ,5 40% km 149 – km availability payment % km 258 – km 334 (Vishniy Volochek bypass) ,6 - km 334 – km ,6 34,2% km 543 – km availability payment ,3 30% km 646 – km 68438availability payment ,6 30% 8

15 58 Festivalnaya St. skyway Ac. Korolev St. Moscow Moscow – Saint-Petersburg highway: Northern belt road Moscow exit State company “Russian Highways” initiates important city projects such as the Northern belt road which links Moscow with the head part of the new Moscow – Saint-Petersburg highway. Northern belt specifications Length – 11 km. Number of lanes – 6 Approximate cost – 2,5 billion euro State investments – 50% Private investments – 50% Design&Construction: Concession type – DBFO/availability payments 9

33 км 84 км231 км 449,9 км Moscow Smolensk Vyazma 380 км Road sectionLength, kmConstruction time Construction cost, thousands € Private funds км 33 – км ,035% км 84 – км ,535% км 230 – км ,535% км 380 – км 449,989, ,035% M-1 “Belarus” federal highway reconstruction The whole M-1 “Belarus” federal highway will be reconstructed and operated via DBFO/availability payments financial scheme. 10

M-1 “Belarus” federal highway reconstruction Regions: Moscow, Smolensk Sections length: 436 km Intensity forecast: – vehicles per day Category: 1B Estimated speed: 120 km/h Number of lanes: 6/4 General information Project information Overall cost: mln. €: State financing: 65% Private financing: 35% Concession type: Availability payment/ DBFO Concession time: 25 years Concession tender time: 2012 Reconstruction time:

M-4 “Don” km 633 – km 715 section construction Regions: Voronezh Section length: 82,5 km. Daily Intensity: per day Category: 1B Estimated speed: 120 km/h Number of lanes: 4 Tolling system: closed General information Project information Overall cost: mln. €: 1000 State financing: 75% Private financing: 25% Concession type: Availability payment/ DBFO Concession terms: years Tender terms: Construction terms:

M-4 “Don” tunnel construction at km 1411 – km 1417 Regions: Krasnodar Section length: 5 km. Intensity forecast: per day Category: 1B Estimated speed: 80 km/h Number of lanes: 4 Tolling system: closed General information Project information Overall cost: mln. €: 300 State financing: 50% Private financing: 50% Concession type: Availability payment/ DBFO Concession terms: 30 years Tender terms: Construction terms:

М-4 «ДОН» Legend toll sections O&M contract 1 toll sections not toll sections O&M contract 2 toll sections not toll sections O&M contract 3 toll section DBFO (LCC) contracts number of section M-4 “Don” highway: reconstruction for tolling NoToll sectionsTermMileage Current Traffic* NoToll sectionsTermMileage Current Traffic NoToll sectionsTermMileage Current Traffic O&M CONTRACT 1O&M CONTRACT 2O&M CONTRACT 3 1км 25 – км , км 225 – км , км 877 – км , км 48 – км км 287 – км , км 948 – км , км 71 – км , км км , км 1091 – км , км 117 – км км км , км 1119 – км , км 211 – км км 414 – км , км 492 – км , км 544 – км , Moscow Voronezh Rostov-na-Donu Krasnodar № O&M contacts: sections breakdown UKRAINE BLACK SEA AZOV SEA NoToll sectionsMileage Total (Euro) Private finances (Euro) DBFO CONTRACTS 1313км 633 – км bln25% 18км 1411 – км mln50% 6 18 * per day 14

60 Noginsk 16 Moscow Ring Road 15 Construction of the new exit from the Moscow Ring Road at the federal highway M-7 “Volga” (bypass of Noginsk) Regions: Moscow area Sections length: 50 km Intensity forecast: vehicles per day Category: 1B Estimated speed: 120 km/h Number of lanes: 6 Overall cost: mln. € State financing: 50% Private financing: 50% Concession type: direct toll Concession time: 30 years Concession tender time: Reconstruction time:

CRR – Moscow Central Ring Road CCR length – 520 km Result of the long-term program – first stage of construction (320,7km) Estimated speed – 140 km/h Number of lanes on the first stage №First stage of constructionkmTerms 1 Part 3 from the intersection with new M- 11 Moscow – Saint-Petersburg highway and M-7 federal highway 105, Part 4 from the intersection with M-7 federal highway and M-4 federal highway 96, Part 1 from the intersection with M-1 federal highway and new M-11 Moscow – Saint-Petersburg federal highway 118,

International transport corridor “Europe – Western China” International transport corridor “Europe – Western China” will connect EU, Russia, Kazakhstan and China. It is estimated to have much influence on the integration of transport networks, trade development and regional cooperation. Prospective characteristics by the year 2022: Length: 2090 km, Category: 1B, Number of lanes: 4-6, Estimated speed: 120 km/h 17

According to the federal law №71-FZ State company received government guarantees of the Russian Federation for loans. The guarantees for the loans in the beginning of 2011 are 75 million euro and are destined to payback a nominal bonds volume or to return the loans of the State company. In 2011 these guarantees will be used to secure the bonds issue planned for the beginning of Secured bonds will allow their holders to submit claims to the Ministry of finance of the Russian Federation in case of unexpected difficulties with the redemption of bonds. Government guarantees 18

Thanks for attention