Friday 23 rd November - morning Coming out of loss maps over night Thu – Fri  in shadow of MKD problem in SPS (and CMS cryo recovery) 07:35 Start pre-cycle.

Slides:



Advertisements
Similar presentations
Thursday 12 th April - morning Machine in access for a problem on the injection kickers… MKI2 problem – fuse - PFNs were properly charged but pulses were.
Advertisements

8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Mo morning set up 228 bunch injection (36 bunch trains), ramp, squeeze, collisions h luminosity (depending on experiments) ATLAS length scale calibration.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Monday 4 th to Friday 8 th Technical stop  Coordination: Katy Foraz  Machine back to Operations Friday evening on schedule Major cryogenics intervention.
Wednesday 12 th September Pumping, removal of vacuum equipment from tunnel in the morning TOTEM & ALFA, RP movement tests: OK 11:50 pre-cycle started,
5/11/2012LHC 8:30 meeting Summary of Week 44 Coordination: Mike Lamont & Jan Uythoven.
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
Thursday 12 th May - recovery from TS 18:30: cryo back in whole ring, also for RF cavities. Preparing to power. Problem with quench loop S23. Access to.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Plan for start-up with beam Friday  19:00 Machine closed. Ramp for powering tests & pre-cycle  22:00 Pilots through nominal cycle up to collisions. Measure.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
Saturday 25/11/10 & Night 12:24 Dump fill #1523 after more than 8 hours in physics It takes some time to get back:  Parallel sequences: Fewer clicks to.
LHC 8:30 meetingEBH 1  Cryogenics recovery in point 8  Meanwhile a couple of accesses:  MKI investigation on noise in IP2  Insulation Vacuum.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
Friday morning Dump fill due to the trip of the RQF.A78  intervention had been just planned for the morning on the circuit Access, interventions:  RQF.A56/78,
LHC 8:30 meetingEBH 11 Thursday 24 November 2011.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
Monday 12 th November 04:50 Beam dump, trip of RF line 4B, integrated L ~120 pb-1. Access for RF. 07:00 Injecting. FBCT phasing. Line steering. 09:59 Beam.
Pevatron status Sunday 29 th November 2015 Coordination: John Jowett, Mike Lamont, Jan Uythoven Access Loss maps Physics.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
LHC progress Tuesday 28 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Tuesday 24 th July - morning 10:15 Operator dump of fill 2873  Initial luminosity: 5.83e33 cm-2s-1  12 hours stable beams  151 pb-1 delivered  Initial.
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
:00 meetingEBH 11 Saturday :00 meetingEBH 2  7:58 Fill 2483 (264 bunches) dumped by reference orbit set to zero in.
Lumi scan limits checked (in preparation for next fill VdM scans).  Trims of up to 150 um per beam in IP1 & IP2 both planes both beams were done (IP5.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
Injection issues overnight 10:50 Access  QPS & EPC  Vacuum leak SPS – magnet to be replaced Monday – cycling for FT and LHC only over the weekend 12:15.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
:00 meetingEBH 1  6:39 beam dump by BLM 655ms RS on BLMEI.05L4.B2E10_MBRB (which is downstream of BSRT B2).  The losses increased during.
Saturday 14:10 Cryogenics back [26 hours 40 minutes] Pre-cycle 15:30 Beam 2 in  Interlock on TCLIB.6R2.B1. Alessandro Masi found a broken sensor, it would.
LHC Status Sat Morning 30-June Bernhard Holzer, Jan Uythoven Status Friday Late: preparing restart some issues... LHCb dipole tripped / router problem.
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Last 24 hours RQ4.L1 Lost going into collision Test ramp Storm
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tue :25 Beams dumped due to RF vacuum interlock
Monday 6th August & night
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
Tuesday 08:30 Fill 2700 dumped by QPS on RCBXH2.L1
Thursday 10th May - morning
LHC Morning Meeting - G. Arduini
Wednesday 30th November 10:00 Access PZ33 for RP, Cryo, EPC, ELQA
Thursday :00: Physics fill from the night shift
LHC Morning Meeting - G. Arduini
Friday Morning 7:30 injection for fill 2908
Wednesday 03/11 – The Plan Finish electron-cloud program:
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Summary Thursday h21: Stable beams fill #1303.
Wednesday Ramp single nominal bunches for loss maps
Aims for the week Recover from technical stop and precycle at 10A/s
Thursday Physics fill 1250 (with 13b) dumped at 10.30
Friday 25 bunch fill dumped just before (BLM in 5)
Saturday 3rd November - morning
Thursday – Morning Energy matching at injection with H CODs
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Thursday 22 September 2011.
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Saturday :42 stable beams fill 3541
LHC Morning Meeting - G. Arduini
LHC - Week 38 Technical stop: Katy Foraz
Coordination: Eva Barbara Holzer, Mike Lamont
Wednesday 26 October 2011.
Wednesday morning Waiting for PS – problem on RF cavity.
Thursday 10:00 Fill 1986 in stable beams.
Presentation transcript:

Friday 23 rd November - morning Coming out of loss maps over night Thu – Fri  in shadow of MKD problem in SPS (and CMS cryo recovery) 07:35 Start pre-cycle in preparation for VdM 10:15 Start ramp 10:45 colliding – no problems – clean – good lifetimes 10:55 Stable beams 11:05 beams dumped during ALICE separation  Software interlock (Power converter surveillance). This interlock was not masked as it should have been for the VdM scans.  Not good… 11:16 CMS solenoid back-up LHC status

Friday 23 rd November - afternoon RCBV27.L5B1 tripped during ramp-down – taken out of service for the moment 12:20 ready to inject again but again a problem with the MKD in the SPS  Decision taken by ABT not to change switch …  Another switch is being prepared, and will be tested in the lab, in order to have a fully tested spare by the week-end 18:00 Injecting physics beam 18:15 MKD tripped again 19:10 SPS back again 20:00 Start ramp 20:30 Stable beams LHC status

Van der Meer scans – part II 20:55 Start 1 st CMS scan 00:50 End 17 th CMS scan 00:55 X/Y scan for ATLAS 02:25 Start VdMs for ALICE 05:00 End ALICE scan No wire scan – intensity limit 05:10 Dump beams Switch hypercycle  Called JJ Gras to change the BCT range settings  Reverted the beta* limits for the stable beams flag LHC status

One of many… LHC status ATLAS in X plane (separation): -6 sigma to 6 sigmas in 25 steps with 30s integration time

Saturday 24 th November - morning 06:05 Probes in 06:15 Steering lines 06:45 No beam from SPS – MKD fault  Switch erratics - MKDV3  Piquet called – Pete Burkel – he changed a module on the thyratron heater and increased the pressure a little – switch holds for the moment but after discussion Laurent Ducimetiere…  Switch needs to be changed 08:15 Go for a fill 08:45 LHC full… LHC status

On the list MKDV3 switch replacement (~9 hours)  Started Saturday 10:00 Switching position of first 6 bunches B1/B2 Re-enhanced satellites for ALICE Access for RCBV27.L5B1 LHC status