LHC beam operation past, present, future Mike Lamont for the LHC team.

Slides:



Advertisements
Similar presentations
LHC Beam Operations Past, Present and Future Maria Kuhn on behalf of the LHC team Moriond QCD 2013.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
(n)QPS LHC status and plans LHC Status and Plans Mike Lamont for the LHC team 1.
(n)QPS LHC status LHC: past, present and future Mike Lamont for the LHC team
Status of the LHC Mike Lamont for the LHC team. The LHC Very big Very cold Very high energy 2.
LHCC 3rd June 2015 Mike Lamont for the LHC team
LHC status The Large Hadron Collider Mike Lamont for the LHC team.
(n)QPS LHC status and plans LHC status and plans for 2011 Mike Lamont for the LHC team 1.
Sat/Sun 26/27 th March Sat 18h20: Stable beams. Fill #1653. Sun 10h02: Stable beams continued. vdM scans. Length calibrations. 16h59: Beam dump. Delivered.
MD#2 News & Plan Tue – Wed (19. – 20.6.) DayTimeMDEiCMP Tue06: GeV  4 TeV: Ramp for chromaticity - missed A 08:00Ramp down 10: GeV: Large.
LHC machine status Mike Lamont for the LHC team. 75 ns50 ns 2011 – recap Increase number of bunches Reduce beam size from injectors Squeeze further Increase.
Lot’s of time lost due to cryo problem in IR8. Major impact, therefore review of MD program… Start discussion here, please let us know your input. Will.
Saturday 6:13 – 15:00 STABLE BEAMS  scans etc. 15:00 moved to ADJUST Squeeze to 2 m in two steps 11 – 5 – 2  remarkably smooth  tertiary collimators.
LHC Accelerator Prospects Mike Lamont for the LHC team “LHC: the status, the projections for this year, and the possibilities for the near and far future..
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
CONTENT: Beam characteristics and parameters Filling schemes Operational settings OP procedure and COLL setting Planning Shift breakdown To define the.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
The LHC from commissioning to operation Mike Lamont for the LHC team.
LHC progress Report LHCC Wednesday 23 rd March 2011.
Evian 2014 historical perspective run 1: 2010: L peak >10 32 cm -2 s -1  2x10 32 cm -2 s : produce >1 fb -1  delivered.
Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
Status of the LHC Mike Lamont for the LHC team. LS1 - descent into the underworld again.
Monday :00 Injection for physics fill # :00 Stable beams fill #1816, luminosity ~1.2x1033 cm-2s-1 11:08 Beams dumped. QPS trigger on detector.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Future Needs and Future Directions Maximizing the LHC Performances J.M. Jimenez …when Nature persists.
Collimator settings for 2012 R. Bruce, R. Assmann for the collimation team
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
LHC Status Report 1 Jan Uythoven For the LHC Team LPCC
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Mike Lamont An attempt at synthesis Acknowledgements all round
Ion Commissioning: Thursday & Friday
Mike Lamont for the LHC team
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
The CERN Physics Programme
MD Planning Fri – Sat (26. – 27.8.)
M.Fitterer, A.Patapenka, A.Valishev (FNAL)
Wednesday 8.9 External crossing angles:
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
LHC Machine Status report
Machine Coordinators: G. Arduini, J. Wenninger
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
LHC status Benoit Salvant (Beams department, Accelerator and Beam Physics group) for the LHC complex teams With many thanks for their inputs to J. Boyd,
Status of LHC Operations
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Summary of Week 16 G. Arduini, J. Wenninger
Scrubbing progress - 10/12/2012
Friday 31st August & night
J. Uythoven, W. Venturini Delsolaro, CERN, Geneva
Week 35 – Technical Stop and Restart
Saturday 7th May Sat – Sun night
Summary Thursday h21: Stable beams fill #1303.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Machine plans - CMS startup workshop
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Collimators: Operations - Baseline Assumptions
Saturday Nov Stop proton operation. Switch back to ions
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
MD Planning Fri – Sat (1. – 2.7.)
Monday :15 fill 3523 dumped by BPMs IP6
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Another Immortal Fill….
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Tuesday 6th April 8:00 Injection studies 16:00 RF studies
HI2011 Commissioning Status
Presentation transcript:

LHC beam operation past, present, future Mike Lamont for the LHC team

75 ns50 ns 2011 – recap Increase number of bunches Reduce beam size from injectors Squeeze further Increase bunch intensity Initial commissioning Initial commissioning Scrubbing 11/3/2012 LHC status

Starting out Efficient commissioning leading into 75 ns operation Intermediate energy run Scrubbing rocky but successful – Dynamic effects: synchrotron radiation, e-cloud  Scrubbing  reduction of the LHC pressure Decision: go with 50 ns 11/3/2012 LHC status

Number of bunches++ End April: “fabulous performance” A little bit of caution – extended period at 1092 bunches Pushing 1.3e11 ppb but high beam intensity issues starting to show Blow-up of some bunches at injection E-cloud solenoids, triplet vacuum, beam screen cooling 108 b injection sort of OK, worry about scraping in the SPS Injection kicker heating, vacuum kicking off in IR 8 RF arc detectors – false dumps Abort gap population SEUs starting to show Collimator heating 11/3/2012 LHC status

LHC machine breaks 3 new world records at 10h41 Sunday 29 May: 2 x 1092 bunches colliding, luminosity above 1.2 x 10^33, and a beam energy of 73 MJ. 11/3/2012 LHC status

Strong emittance blow-up at injection Chromaticity stability, persistent current decay compensation Eventually suppressed by octupoles at 450 GeV Bunch length control in ramp Satellite collisions tested RF versus intensity versus trips – worrying about couplers – dump on cavity trip deployed Vacuum at 2&8 - instabilities Instrumentation issues UFO storms High losses at collimators 1 SEU dump per day Trim quad circuits tripping during squeeze Looking towards 1380 bunches 15 th June: 1 fb -1 11/3/2012 LHC status

Summer - now what do we do? July: starting to look encouraging… August: getting so worried about SEUs we had a brainstorming and a mini-Chamonix 11/3/2012 LHC status Decision to push: beam from the injectors squeeze

Beam from injectors 11/3/2012 LHC status Excellent performance – years in the preparation Best in 2011 with 50 ns: ~1.45 x ppb ~2.3 microns into collision Design with 25 ns: 1.15 x ppb Normalized emittance 3.75 microns

IR1 and IR5 aperture at 3.5 TeV 2011’s “platinum mine” We got 4-6 sigmas more than the expected 14 sigma Triplet aperture compatible with a well-aligned machine, a well centred orbit and a ~ design mechanical aperture (small tolerance) LHC status Stefano Redaelli 11/3/2012 ~600 m ~3 cm

Squeeze Beta* = 1 m – big success – 3.3e33 cm -2 s -1 Pushing bunch intensities to 1.35e11 Collimator interlocks, PADs/MADs, injection quality, vacuum, collimator heating, Alice background, b2 instability, RF de-bunching, tune feedback in squeeze 11/3/2012 LHC status

Impressive final run in Mirko Pojer 11/3/2012 LHC status

Very positive ending Ion man 11/3/2012 LHC status

2011 Another remarkable year It was nearly always a battle… Remarkably no real show stoppers Successfully took on: – Total intensity – Bunch spacing – Bunch intensity – Emittance – Beta* & aperture 11/3/2012 LHC status

Of note Operational robustness – Precycle, injection, 450 GeV, ramp & squeeze & collisions Machine protection – Unpinned by superb performance of machine protection and associated systems – Rigorous machine protection follow-up, qualification and monitoring (Post Mortem analysis, MPP, rMPP) Routine collimation of 110 MJ LHC beams without a single quench from stored beams. 11/3/2012 LHC status

Operation efficiency Overall efficiency – Pretty good considering that this is the LHC – Overall time in stable beams 34% Premature dumps – 50% of all STABLE BEAMS fills lasted less than 3 hours 34% 11/3/2012 LHC status

Radiation to electronics (R2E) xMas-Mitigation crucial: patch, shielding, relocat. Patches to continue during 2012 Particular emphasis (analysis) of ‘new’ failures 11/3/2012 LHC status

11/3/2012 LHC status Concerted program of investigations, simulations, tests with beam … Tobias Baer

Vacuum 11/3/2012 LHC status LSS2 CMS Unexpected pressure rise (10 -6 mbar) observed in LSS2-LSS8 (D1) and close to CMS: bad RF contact (x-rays inspection)  interventions done in 2 & 8 & CMS to resolve RF finger issues - shouldn't be a problem in 2012.

TDI – beam screen heating 11/3/2012 LHC status

2011 to 2012 Well organized, productive Xmas technical stop – Lot of R2E related work – Plus consolidation and improvements of many systems Vacuum consolidation to address successfully diagnosed causes of instabilities in 2011 Injection collimators issues diagnosed and understood - spare in preparation - fingers crossed in the meantime Cool-down of machine exactly on schedule - cryogenics demonstrating full mastery… Very smooth hardware commissioning including careful quench-less commissioning of main circuits to 4 TeV Machine checkout proceeding well - good for beam next Tuesday afternoon 11/3/2012 LHC status

2012 strategy 4 TeV 50 ns p-Pb: 3.5 TeV or 4 TeV β*=0.6m→0.7m→0.9m ∫Ldt = fb -1 L peak = cm -2 s -1 SPS N p = SPS ε= 2 μm Pile-Up=26-35 ∫Ldt = 5 fb -1 in June? β*=(0.6,0.6,0.6,3)m TCP gap=2.2mm LHCb ∫Ldt=1.5 fb -1 IP1 β*=500m Dumps=30-50 nb -1 ∫Ldt = nb -1 11/3/2012 LHC status Rogelio Tomas

Collimator settings 2012 Collimation hierarchy has to be respected in order to achieve satisfactory protection and cleaning 11/3/2012 σ TCP 74.3 TCSG 76.3 TCLA 78.3 TCSG 67.1 TCDQ 67.6 TCT9.0 Aperture : tight settings LHC status

How tight? 11/3/2012 Intermediate settings (2011): ~3.1 mm gap at primary collimator Tight settings: ~2.2 mm gap at primary collimator Norway Iberian peninsula LHC status

2012 run configuration Energy – 4 TeV – Low number of quenches (as in 2011) assumed Bunch spacing - 50 ns Collimator settings – tight – As discussed – NB not yet proven operationally Atlas and CMS beta* - 60 cm – with 70 cm and 90 cm as fallbacks Alice and LHCb beta* - 3 m – Natural satellites versus main bunches in Alice 11/3/2012 LHC status

Bunch spacing Performance from injectors Bunch spacing From Booster Protons per bunch (ppb) Emittance H&V [mm.mrad] 150 Single batch 1.1 x Single batch 1.2 x Single batch 1.45 x Double batch 1.6 x Double batch 1.2 x /3/2012 LHC status

2012 LHC schedule Q1/Q /3/2012 LHC status

2012 LHC schedule Q3/Q /3/2012 LHC status High beta* runs for ALFA and TOTEM Van der Meer scans

breakdown 11/3/2012 LHC status Days Machine check-out2 Commissioning with beam21 Machine development22 Technical stops20 Scrubbing (25 ns)3 Technical stop recovery6 Initial intensity ramp-up~21 Proton running~126 Special runs~8 Ion setup4 Ion run24 ~150 days

50 ns performance estimate 4 TeV, 50 ns, 1380 bunches, 1.6e11, 2.5 microns 150 days of proton physics (assuming similar efficiencies to 2011) Beta* [cm] CollimatorsPeak Lumi [cm- 2 s -1 ] Int. Lumi [fb -1 ] Pile-upIncrease in peak 90Intermediate5.1e – Tight6.2e – % 60Tight6.8e – % 11/3/2012 LHC status

25 ns performance estimate 4 TeV, 25 ns, 1380 bunches, 1.6e11, 2.5 microns 140 days of proton physics (extra scrubbing required) Beta* [cm] CollimatorsPeak Lumi [cm- 2 s -1 ] Int. Lumi [fb -1 ] Pile-up 80Tight3.8e /3/2012 LHC status Conclusion: 25 ns not competitive with 50 ns

11/3/2012 LHC status

Conclusions Good performance in 2011 from working on all available parameters Very definitely exploring the effects of high intensity beams – SEUs, beam induced heating, vacuum instabilities… – Operational efficiency suffering as a result Main gain in 2012 is use of tight collimator settings and reduced beta* – 5 to 6 x cm -2 s -1 and 15 fb -1 should be possible Hope for improved operational efficiency – R2E mitigation measures – but partially countered by increased peak performance Another long, interesting year in prospect… 11/3/2012 LHC status