Calais, ME-St. Stephen,NB Border Crossing Project A Case Study.

Slides:



Advertisements
Similar presentations
1 NMDPS-MTPD ENHANCED ELECTRONIC SCREENING. 2 Project Overview  Introduction  The NM Motor Transportation Police are manually entering License Plates.
Advertisements

Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
Towards a framework for integrated cross-border law enforcement initiatives Based on the Consultation Paper circulated to CACOLE in July 2008 by Public.
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
Baudette, Minnesota/Rainy River, Ontario International Bridge
Gilbert Road Light Rail Extension Transportation Project Advancement Agreement City Council Study Session December 4, 2014.
Prepared by Robert Gadsby Crossing the Line International Deployment of Wildlands Fire Resources Department of Homeland Security United States Customs.
FHWA at the Border David Franklin U.S – Canadian Border Coordinator Office of Planning.
Transportation Border Working Group Towards a More Secure and Efficient Border: Facilitation and Security in North American Trade and Transportation Washington,
ENHANCING COMPLIANCE WITH CANADA’S TOBACCO TAX LEGISLATION Canada Revenue Agency September 2005.
1 Detroit River International Crossing (DRIC) New International Trade Crossing (NITC) Transportation Border Working Group April 24, 2013.
Qu é bec-New York Regional Workshop Report Ministère des Transports du Québec / New York State Dept. of Transportation TBWG Montréal, Québec October 25,
Longmeadow Parkway Fox River Bridge Corridor
Beyond the Border Action Plan Border Infrastructure Investment Plan (BIIP)
Created by Steven WevodauSteven Wevodau Detroit River International Crossing Study June 29, 2009 Mohammed Alghurabi Senior Project Manager IRWA’s 55th.
Detroit River International Crossing (DRIC) Study 2007 Ohio Conference on Freight Toledo, Ohio September 18, 2007.
Cross Border Rail Passenger Service Transportation Border Working Group Buffalo, New York – April 8, 2014.
The State of Israel Jordan Gateway Project An Israeli-Jordanian Industrial Peace Park April 2013.
MassDOT P3 Project Overview. MassDOT Project Mobility.
Trade Act of 2002 Office of Field Operations Kimberly Nott, Chief Manifest and Conveyance Branch September 2004.
FMCSA Update Canada-United States TBWG Plenary Meeting Chicago, Illinois April 28-29, 2009.
“High Speed Rail Implementation - An Update on Passenger Rail Planning Activities in Minnesota.” presented by: Minnesota Department of Transportation March.
PROJECT DESCRIPTION BORDER WAIT TIME WORKING GROUP.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Bi-national Collaboration in Delivering Port-of-Entry Highway Infrastructure Improvements Case Study: Pembina-Emerson Port-of-Entry and Innovations in.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
Reclamation Bureau Interagency Forum Local Agency Planning Process City of Rancho Cordova December 6, 2007.
INTRODUCTION TO SECTION 4(f) Presented by Ian Chidister Environmental Program Manager FHWA – Wisconsin Division December 4, 2013.
TBWG Meeting Burlington, Vermont National ITS Architecture June 10, 2003.
The U.S. Department of Transportation and the International Trade Data System Steven Beningo Transportation Border Working Group Border Data Workshop June.
SAFETEA-LU Section 6002 “ Efficient Environmental Reviews for Project Decisionmaking”
Transportation Border Working Group April 23, 2008 Milt Schmidt North American Borders Division Federal Motor Carrier Safety Administration 1200 New Jersey.
Interstate 95 Corridor Improvement Program June 20, 2012.
1. Marine Transportation Security Regulations Work Plan Webinar presentation January 2014 Transport Canada Donald Roussel
Enhancing Partnerships in Support of the Maritime Sector: An Overview of Transport Canada Initiatives 20 th CMC Towboat Conference May 25, 2013.
Tom Norton, Executive Director Colorado Department of Transportation American Association of State Highway and Transportation Officials September 9, 2003.
1. 2 Background Bill C-3, International Bridges and Tunnels Act: –introduced in the House of Commons on April 24, 2006 –received Royal Assent on February.
Trusted Trader Initiatives - Beyond the Border Action Plan Transportation Border Working Group April 17, 2012.
Border Trade Alliance Maria Luisa O’Connell BTA President March 11, 2008.
Phase I Engineering and Environmental Studies Project Development Flowchart US Route 45; IL Route 132 to IL Route 173 and Millburn Bypass CSS
June 9, 2009 VTA 2009 Annual Conference DRPT Annual Update 2009 VTA Conference Chip Badger Agency Director.
CROSS BORDER TRADE October, 2004 M O V I N G F O R W A R D 2004.
Michele Mueller Senior Project Manager Applying Intelligent Transportation Systems to Cross Border Issues TC / FHWA Regional Roundtable Mike Barnet Senior.
1. Perimeter Approach to Plant Protection Presentation to RCC Stakeholder Dialogue Session January 2014 Canadian Food Inspection Agency Steve Côté
Canada Border Services Agency Transportation Border Working Group (TBWG) April , 2010 Boston, Mass. CBSA OTTAWA UPDATE.
INCORPORATING INCOME INTO TRAVEL DEMAND MODELING Brent Spence Bridge Case Study October 13, 2015.
EBTC WORKSHOP ON BORDER PROJECTS: AVOIDING THE POTHOLES – PAVING THE WAY TBWG, Niagara Falls October 24, 2006 EBTC WORKSHOP ON BORDER PROJECTS: AVOIDING.
The Border Challenge TBDBTA October 26, 2007 Montreal, Quebec Canada.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Tuesday, May 3 rd, 2016.
Carolina North Carolina North Annual Report for Chapel Hill Town Hall September 29, 2010.
Detroit River International Crossing Project March 31, 2010.
Page 1 Establishing Business in Canada Brion Hendry, CPA, CA Partner BDO Canada LLP May 16, 2016 Leon Efraim Partner Thomas, Efraim LLP Barristers & Solicitors.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens.
New Brunswick / Maine Border Crossings Trans Border Working Group June 11, 2003 Burlington, VT.
Southeast Rail Extension Update RTD Board of Directors FasTracks Monitoring Committee March 3, 2015.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Metropolitan Planning Organization Advisory Council Florida Department of TRANSPORTATION Carmen Monroy Director, Office of Policy Planning April 28, 2016.
North American Free Trade Agreement
Sully District Council of Citizens Associations January 25, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation.
FY 2012 Status Report on the North Mainland (Ormond Crossings CRA)
600 MHz – Proposed TV Transition Objectives and Methodology
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Issaquah-Fall City Road
Transportation Improvement Program and Air Quality Conformity Analysis
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Consultation (C) After approval of the EIS, FONSI, or CE designation, the applicant shall consult with the Administration prior to requesting any major.
Surface Transportation Reauthorization: Corridors and Borders
Presidential Permits Implementing EO 13337
I Street Bridge Replacement Project
Presentation transcript:

Calais, ME-St. Stephen,NB Border Crossing Project A Case Study

 Introduction  Planning, coordination, and permitting  Considerations during Design  Considerations during Construction  Lessons learned Agenda

 New crossing discussed for about 30 years  8 th busiest commercial crossing along the U.S. / Canadian border  Annual traffic – 2.9 million vehicles  7,500 AADT including 550 heavy trucks  Delays inbound to the U.S. can be up to 2 hours  Truck traffic entering Maine has doubled since NAFTA implementation (70,000 to 140,000 annually) Introduction

 Maine and New Brunswick DOTs share the costs of bridge design/construction on a 50/50 basis  MaineDOT: Bridge design lead  MaineDOT: Project Manager for the bridge construction portion Project Management

 FHWA – lead federal agency  MaineDOT  GSA – cooperating agency  U.S. Department of Homeland Security  Customs and Border Protection  U.S. Border Patrol  U.S. Department of State Agencies — U.S.

 New Brunswick Department of Transportation  Transport Canada  Canada Border Services Agency  Canada Revenue Agency  Citizenship & Immigration Canada  Foreign Affairs Canada  Royal Canadian Mounted Police Agencies — Canada

 Four Alternatives including no action considered  Alternatives 2A and 3 deemed viable  Chosen: Alternative 3 Calais Industrial Park

 Preliminary design and NEPA compliance – started 1999  FHWA issued FONSI in July 2002  Final design and permitting July 2002 – September 2006  Construction Begins  NBDOT - Spring 2006  MaineDOT – Spring 2007  GSA and CBSA  Open to traffic - Fall 2008 Timeline

This Last Year…  January 2006 – Reevaluation of 2001 Environmental Assessment  May 2006 – Army Corps of Engineers request for details  June 2006 – Maine DOT replies  June US Coast Guard Approval  Sept 2006 – Army Corps of Engineers approval  Project tendered September 27, 2006

 Maine and New Brunswick circulated studies at same time  Changes in process (New Brunswick was very flexible)  Public Involvement  9 PAC meetings, 2 public meetings, and 1 formal public hearing  MaineDOT – GSA enter into a cost reimbursement agreement for NEPA Planning

 Partnership, respect for others’ process, flexibility  International Stakeholders workshops  Every 6 months to 1 year throughout the process  International partnering agreement  Master schedule discussed and developed  Good forum for troubleshooting problems like labor issues  Communication between workshops  Find ways to maintain national focus for future funding purposes  TBWG, BSPC, etc. International Coordination

 Required for an international bridge  Cooperating agency under NEPA  Bridge permit  40% plans required  Approved Presidential Permit is also required  Long lead time is necessary Permitting — Coast Guard Bridge Permit

 U.S. Department of State  No precedent for the northern border  First one in at least 30 years  Guidelines for complete application  State Dept. distributes application to at least 55 agencies for comment and determinations  Prepared and circulated own EA and FONSI as part of their process as well Permitting – Presidential Permit

 Transport Canada – New Brunswick agreement  This project spurred a new Canadian equivalent of the U.S. Presidential Permit process  International Boundary Commission approval  International Joint Commission or exchange of diplomatic notes required between Foreign Affairs Canada and U.S. State Department  MaineDOT - New Brunswick agreement to construct and reimburse Treaties and Approvals

 Inspection facility – increased in size from 20 to 50 acres. (Post 911)  MaineDOT – GSA cost reimbursement agreements  Advance notice for materials and people crossing the border  Buy America clause for steel  MaineDOT – NBDOT funding and management agreement  Bridge contractor ‘fact sheet’ and prequalification  Coordination between GSA and MaineDOT of design issues; staging issues, exchange of plans, etc. Design Considerations — U.S.

 Labor and requirements for foreign workers  Human Resources Development Canada-Canadian Labor Market Opinion  CBSA – immigration  Maine Dept of Labor  Security and background check  Ideal worker – dual citizenship, no criminal record Considerations During Construction - Labor

 Security during construction  U.S. Border Patrol  RCMP  Movement of workers; must be able to cross border within project limits  No precedent on this issue Considerations During Construction - Security

Considerations During Construction - Taxes U.SCanada Customs DutiesEXEMPT All international bridge projects are exempt Exempt – but imports need NAFTA certificate of origin Sales TaxEXEMPTNone Value Added Tax (GST/HST) None6% GST collected at border 14% HST Income Tax Withholding Non-resident withholding NB responsible for 15% non-residents

 Partnerships among agencies on both sides of the border that are built to last  Respect for others and stay flexible  Communicate and communicate some more  Combine NEPA/Presidential Permit Process as much as possible  Maximize the use of the cooperating agencies  Taxation issues for international bridge projects are complex Lessons Learned

Project Status International Bridge Construction (11.58 Million)  March 2007 – Summer 2008 U.S. Inspection Facility  Summer 2007 – Fall 2008 US Route 1 (9.33 Million):  April 2007 – Summer 2008 NB Route 1:  Spring 2007 Canadian Inspection Facility  Summer 2007 – Fall 2008

Calais, ME-St. Stephen,NB Border Crossing Project Calais, ME-St. Stephen,NB Border Crossing Project