ROOF MATE Step-By-Step Application Over METAL ROOFING Master Guide Specifications List of Materials: ROOF MATE WHITE ROOF MATE BASECOAT ROOF MATE BUTTER.

Slides:



Advertisements
Similar presentations
Wetsuit Roofing and Waterproofing
Advertisements

Sectional Assembly and Installation
FRIGI-TECH REFLECTIVE ROOF COATINGS. MAIN BENIFITS INSULATES – Outperforms 7 of fiberglass insulation. Keeps interiors cooler and more comfortable. CUTS.
Presentation Overview
Copyright , Facade Works Inc - Drained/Back-Ventilated Rain Screen System.
Unit 55 Roof Finish Roof Overhangs and Cornices • Open Cornices • Closed Cornices • Cornice Soffit Systems • Covering Roofs • Asphalt Shingles • Wood Shingles.
Interior Wall and Ceiling Finish
Stucco Basics and Beyond
Group MAKING KITS Designed to deliver creative learning in your classroom or workshop.
Civil Engineering Specifications for the Water Industry
Polyurea Application for Excessively Cracked Concrete
Optimum Round Pool Instructions. Prepare the pool site Remove all the grass on a surface 2’ wider than the size of the pool Level the ground.
2313 W Sam Houston Parkway N Suite 105 Houston, Texas ROK Shield Application Instructions ROK Shield is a non-toxic,
NERI TORCH TRAINING PART VII PRACTICAL EXAM PREPARATION.
Ground-Supported Slabs • Exterior Flatwork
ATLIER FRANCOIS (COMPRESSOR). MAINTENANCE AND CHECKS DAILY CHECKS DAILY CHECKS INSPECT AND NOTE THE OIL LEVEL AND ALL THE PRESSURE AND TEMPERATURE LEVELS(FILLL.
Building Code – Flashing Changes & Challenges Builder Breakfast and Luncheon Series Presented by:
CONSTRUCTION OF A “LITTLE FREE LIBRARY” Gary Mehlum, pressed into service by wife and UHLS employee Mary Fellows (“When you marry a librarian, you marry.
1 Presentation 30: STARTING 3-TAB SHINGLES. 2 Underlayment Felt underlayment is installed on a roof deck before shingles are applied.
Blacklidge Emulsions Inc. GuardTop Sealer. Guardtop Mission Statement The goal of Guardtop is to produce an asphalt seal coating that has deeper and longer-lasting.
SYNTHETIC RED OXIDE METAL PRIMER It has good anti-corrosive properties. It contains Zinc-chrome. Recommended for agricultural, steel structures & other.
Method to fix wall tiles. Preparation All wall tiles to be immersed in water for 3-4 hours for better results. Some gap in between the rows to allow the.
Grouting Ceramic Tile This step comes after the tile is installed and has had time to cure. It is very important to either follow the instructions listed.
Example of a successful lining Description: Tuff Stuff is sprayed as a protective lining onto a boat hull. The lining with TS provides a high level of.
CLADDING / VENERING OF INTERIOR AND EXTERIOR WALL SURFACES WITH MASONRY STONE CLADDING BRICK CLADDING.
Concrete Specifications
INSTALLATION INSTRUCTIONS FOR GERARD METAL SHINGLES
Firestone Building Products EPDM Training. Membrane Attachment.
ROOF MATE Step-By-Step Application Over BOARD-STOCK INSULATION
ROOF MATE Step-By-Step Application Over MODIFIED BITUMEN ROOFING Master Guide Specifications List of materials: ROOF MATE WHITE ROOF MATE BASECOAT ROOF.
EXISTING ROOF TOP UNIT. PROVIDE NEW FLASHING AROUND STRUCTURAL PIPE SUPPORTS. 4 2 EXISTING ACCESS LADDER. RE-ADHERE EXISTING BOOT AND SEAM SEAL OVER FLAT.
New Mexico FFA Agricultural Mechanics Career Development Event Concrete and Masonry.
AUZIE QUIC SLIP PTY LTD AQS METAL PRO – 001 INTERIOR AND EXTERIOR.
SPECIFICATIONS FOR ROOFING ROOF DRAINAGE Adequate drainage fall should be specified at no less than the industry minimum requirement or at least 1.5% without.
REINFORCED CONCRETE Reinforced concrete is a composite material which utilizes the concrete in resisting compression forces, and steel bars and/or.
CONSTRUCTING A FIVE CABIN LATRINE
VERTICAL/WALL APPLICATION. PRIMING YOUR WALL PRIMER: MAY BE APPLIED DIRECTLY OVER DRYWALL, MASONRY, CONCRETE, CONCRETE BLOCK, OR ICF/STYROFOAM SUBSTRATES.
Fluid/Liquid Applied Roofing Richard Tran. Session Outline 1.Effective Uses and Advantages → 2.Construction Sequence/Environmental Installation and Storage.
Remanufacturing the HP 1200 Tom DiPasquale Diamond Tech Associates
ROOF MATE Step-By-Step Application Over EPDM ROOFING Master Guide Specifications List of Materials: ROOF MATE WHITE ROOF MATE LIGHT GRAY ROOF MATE BUTTER.
Tools of the Trade Common Tools used with Master Wall Systems Presented by With thanks to.
Master Guide Specifications List of materials: ROOF MATE WHITE ROOF MATE BASECOAT ROOF MATE BUTTER GRADE ROOF MATE MESH Optional materials: UCC (United.
The DUCTZ Experience. A Brief Overview of how DUCTZ Cleans a Heating and Cooling System.
Dry lining by direct bond – overview
Products & Accessories Details System Highlights Hands On
ROOF MATE Step-By-Step Application Over CONCRETE ROOFING
Freeman Athletic Center – Bacon Fieldhouse – North Elevation Scope, Typical for north, south and west elevations: Remove all existing horizontal and vertical.
Principles of Manufacturing Copyright © Texas Education Agency, All rights reserved 1.
Firestone Building Products
appseal ® STP Acrylic based elastomeric strip Areas of application: (A) Over Construction joints. (B) Over Expansion joints. 1.
1. 2 Routinely used by athletic trainers Used to minimize swelling, provide support to injured areas and prevent injury While techniques are not difficult.
Basic Slide Show Under Tile Spooled Heating Installation Guide.
1 Presentation 30: STARTING 3-TAB SHINGLES. 2 Underlayment Felt underlayment is installed on a roof deck before shingles are applied.
© 2011 McGraw-Hill Higher Education. All rights reserved. Bandaging and Taping part 1.
Queen Anne Academic Center Prince George’s Community College 301 Largo Road Largo, Maryland By: Austin Heidelbaugh.
Non-elastic and Elastic Adhesive Taping Historically an important part of athletic training Becoming decreasingly important due to questions surfacing.
UniBond™ ST Polyester-Faced Adhesive Tape
STEP 1: ASSEMBLE ANGLE PLATES
Garland’s White-Knight® Plus/ White-Stallion® Plus System
Garland’s Rust-Go System
Linoleum Installation System
Liquid Flashing: Garland’s Tuff-Flash™ System
CPR™ System.
Fiberglass-Reinforced Sheet Flooring Installation System
Revitalizer™ Systems.
B-Clean™ Heavy-Duty Concrete & Masonry Cleaner
STEP 1: ASSEMBLE ANGLE PLATES
Fiberglass-Reinforced Sheet Flooring Installation System
II REVIEW.
Application Issues & Solutions
Presentation transcript:

ROOF MATE Step-By-Step Application Over METAL ROOFING Master Guide Specifications List of Materials: ROOF MATE WHITE ROOF MATE BASECOAT ROOF MATE BUTTER GRADE UNI-TAPE ROOF MATE MESH Optional Materials: UCC (United Cleaning Concentrate) ACRYLEX 400 or LOCK-DOWN PRIMER UNI-CAPS RHINO TOP ACRYSHEEN EXITMAIN MENUNEXT>EXIT

ROOF MATE Step-By-Step Over METAL ROOFING STEP 1 – Preparation Retighten or replace mechanical fasteners, as necessary. "Stripped out" fasteners shall be replaced using a larger diameter fastener. Unsound rust shall be wire brushed, sandblasted or mechanically abraded to remove all loose rust. Metal panels deteriorated to the point that their structural integrity is compromised shall be replaced. Remove excessive amounts of asphaltic-based or other deteriorated patching/flashing materials, if present. Excessive gaps or deflection between panels shall be eliminated by installing additional screws or rivets as necessary to restrict deflection to ¼" (6 mm) or less. <BACK EXITMAIN MENUNEXT>EXIT

ROOF MATE Step-By-Step Over METAL ROOFING STEP 2 – Cleaning Metal surfaces must be clean, dry, sound, and free of dirt, grease, oil, and any other contaminants that may interfere with optimum adhesion of the coating. All metal surfaces, whether new or existing, shall be cleaned using United Cleaning Concentrate (UCC) or comparable biodegradable cleaner. Heavy deposits of dirt or contamination may require agitation with a stiff-bristle broom or similar mechanical scrubber. All existing "sound" rusted areas shall be primed with Acrylex 400 (light to medium rust) or Lock-Down (heavy rust). If the roof has been coated with aluminized asphalt, contact UNITED COATINGS for additional preparation instructions. Fill gaps between ¼" and ½" (6 and 13 mm) at panel seams, joints and protrusions with ROOF MATE Mesh embedded into ROOF MATE Butter Grade. Fill gaps larger than ½" (13 mm) using polyethylene backer rod or spray-applied polyurethane foam. <BACK EXITMAIN MENUNEXT>EXIT

ROOF MATE Step-By-Step Over METAL ROOFING STEP 3 – Details Treat all horizontal (end-lap) seams, roof terminations, flashings, around drains, scuppers and skylights, and around the base of all vents and other protrusions with Roof Mate Mesh embedded into a heavy coat of ROOF MATE Butter Grade or ROOF MATE Basecoat. Or, cut a length of 6" (15 cm) Uni-Tape to the desired length, peel off the release backing, center over the detail area and press firmly into place, removing all wrinkles and bubbles. A wallpaper seam roller is helpful in securing the Uni-Tape to the metal deck. Treat all overlapped horizontal (side-lap) seams with ROOF MATE Butter Grade. Using a 2” or 3” (5 or 7.5 cm) brush, apply the Butter Grade in 1 or 2 coats to a total thickness of 40 to 60 mils (1,016 to 1,524 microns), centered over the seam. 2” Uni- Tape can also be used on overlapped horizontal seams. <BACK EXITMAIN MENUNEXT>EXIT

ROOF MATE Step-By-Step Over METAL ROOFING STEP 3 – Details (continued) At the interface of any metal with a dissimilar material, detail the joint either by applying a strip of 6" (15 cm) ROOF MATE Mesh embedded into ROOF MATE Butter Grade, or with 6” Uni-Tape as previously described. All mechanical fastener heads shall be treated using ROOF MATE Butter Grade or Uni-Caps. Using a stiff 1” to 2” brush, apply Butter Grade using a swirling motion so that it completely encapsulates the base of the fastener head, sealing it to the deck. If using Uni-Caps, center the cap over the fastener head and press firmly in place using a Uni-Cap Tool or other similar device to seal the cap flush around the base of the fastener head. <BACK EXITMAIN MENUNEXT>EXIT

ROOF MATE Step-By-Step Over METAL ROOFING STEP 4 – Reinforcement At drip edges, refasten all metal flanges and reinforce the area with ROOF MATE Butter Grade, or embed 4” or 6” ROOF MATE Mesh into a strip- coat of ROOF MATE Butter Grade or ROOF MATE Basecoat, or use Uni-Tape centered over the detail. Reinforce all protrusions, skylights, etc. in the same manner. <BACK EXITMAIN MENUNEXT>EXIT

ROOF MATE Step-By-Step Over METAL ROOFING STEP 5 – Coating Application Apply 1 to 4 separate coats of ROOF MATE, using airless spray or roller, at the total rate of 2 to 4 gallons per 100 sq. ft. (.8 to 1.6 l/m²), depending on warranty and/or specification requirements. Create a self-terminating flashing by extending the ROOF MATE Topcoat a minimum of 3” (7.5 cm) above all protrusions, parapet walls, etc. <BACK EXITMAIN MENUNEXT>EXIT

ROOF MATE Step-By-Step Over METAL ROOFING *Rhino Top is a tough acrylic coating that is available in both smooth and textured formulations. It is ideally suited for horizontal surfaces that receive regular foot traffic. STEP 6 – Options Apply walk pads, ceramic roofing granules or Rhino Top as required to demarcate walkways and service areas, and/or provide non-skid characteristics. To enhance dirt release characteristics in problem areas, apply a coat of Acrysheen, which imparts a slick, semi-gloss finish that aids in maintaining a clean surface. <BACK EXITMAIN MENUNEXT>EXIT

Thank you for choosing quality ROOF MATE products from UNITED COATINGS <BACK EXITMAIN MENUEXIT