1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.

Slides:



Advertisements
Similar presentations
NAESB Measurement and Verification Model Business Practice Retail Electric Demand Response 5/29/09 update.
Advertisements

ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
January 9, 2013 BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC.
GPA Renewable Energy Resource for Guam Power Authority
Preliminary Impacts of Wind Power Integration in the Hydro-Qubec System.
Power Supply Adequacy Assessment Model/Methodology Review Steering Subcommittee Meeting January 29, 2010.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
1 Integrating Wind into the Transmission Grid Michael C Brower, PhD AWS Truewind LLC Albany, New York
A R EVIEW OF L ARGE -S CALE R ENEWABLE E LECTRICITY I NTEGRATION S TUDIES Paulina Jaramillo, Carnegie Mellon University And Paul Hines, University of Vermont.
INTEGRATION COST. Integration Cost in RPS Calculator While “Integration Cost” is included in NMV formulation, the Commission stated that the Integration.
NERC LTRA Update / CDR Capacity Counting Issues
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
The impacts of hourly variations of large scale wind power production in the Nordic countries on the system regulation needs Hannele Holttinen.
RenewElec October 21, 2010 Robert Nordhaus, David Yaffe Van Ness Feldman 1050 Thomas Jefferson Street, NW Washington, DC (202) FERC’s.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
GE Energy Asia Development Bank Wind Energy Grid Integration Workshop: Issues and Challenges for systems with high penetration of Wind Power Nicholas W.
Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.
Lynn Coles, PE National Wind Technology Center National Renewable Energy Laboratory Golden, Colorado USA 10 FAQ’s (Frequently Asked Questions) About Wind.
U.S. Energy Information Administration Independent Statistics & Analysis EIA Reporting Proposal: Balancing Authority Hourly Operating Information.
© New York Independent System Operator, Inc. All Rights Reserved. Michael Swider Manager – Research & Development New York Independent System.
NASUCA Meeting Integration of Intermittent Renewable Resources Panel Michael McMullen MISO June 10, 2013.
Western Wind Integration Study Debbie Lew NREL. Goal To support multi-state interests in understanding the operating and cost impacts due to the variability.
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
1 Renewable Technology Working Group (RTWG) July 14, 2009 Henry Durrwachter.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
Western Wind and Solar Integration Study Debbie Lew National Renewable Energy Laboratory SWAT/CCPG Meeting Aug 22, 2007.
FERC’s Role in Demand Response David Kathan ABA Teleconference December 14, 2005.
Texas Wind Energy American Meteorological Society Summer Community Meeting – Norman Oklahoma Henry Durrwachter, P.E. August 12, 2009.
Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.
1 Mid-Continent Area Power Pool Wind Integration Studies Edward P. Weber August 16, 2007.
Debbie Lew (NREL) TEPPC MWG Feb 6, 2008 Western Wind and Solar Integration Study and Virtual Control Area Study.
Integration of Variable Generation Task Force (IVGTF) & Emerging Issues Mark Lauby Manager, Reliability Assessments
1 Electricity System and Energy Market Basics David J. Lawrence Manager, Auxiliary Market Products Prepared for: RGGI I&L Workshop June 15, 2006.
Integration of Variable Generation Task Force (IVGTF) Mark Lauby Manager, Reliability Assessments
SM April Peak Week Operations Review Presentation to ISO Business Issues Committee May 22, 2002.
1 New York State Reliability Council …….. Promoting Electric System Reliability in New York State Presentation to the MEUA Annual Meeting September.
RGGI Workshop on Electricity Markets, Reliability and Planning Topic Session 3: RGGI Design, Markets and Reliability – Issues Relating to System Operations.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
May 11, 2012 RPG meeting YTP Scope and Process – RPG Comments.
ERCOT TAC11/2/ CREZ Study Update ERCOT TAC 11/2/2006.
Craig Williams Market Interface Manager August 21, 2014 ISAS, Portland, OR.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
George Zhou, VGITF Chair October 14, 2015 Salt Lake City, Utah Variable Generation Interconnection Task Force Update to PCC.
RAWG Agenda Item LAR Data WECC Staff. Data Elements Generator information – Existing – Changes Monthly Peak Demand and Energy (actual year and.
January 14, 2016 PacifiCorp-CAISO-NVE EIM Initiative Overview.
Probabilistic Approach to Resource Adequacy Resource Adequacy Forum Technical Committee Meeting Portland, OR January 23, 2009.
Generation Adequacy Task Force Meeting April 10, 2014.
April 13, 2007 Regional Planning Group Meeting Wind Impact/Integration Analysis Warren Lasher Regional Planning.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
DRAFT – FOR DISCUSSION PURPOSES ONLY © 2013 New York Independent System Operator, Inc. All Rights Reserved. EIPC Roll-Up Powerflow Model Zach Smith Director,
GATF Loss of Load Process (or How to Make Sausage) October, 2012.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
1 NPCC – A-2 Dr. Mayer Sasson Transmission Planning Consolidated Edison of New York June 1, 2006 Presented to the NYSRC-RRS.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
Analysis of the Effects of a Flexible Ramping Ancillary Service Product on Power System Operations Ibrahim Krad Eduardo Ibanez Erik Ela.
Evolving Economic Dispatch in SPP
Solar Eclipse Overview August 2017
ISO New England Net Load Analysis with High Penetration Distributed PV
Reliability Assessment Committee Reliability Workshop Priorities
Mid-Continent Area Power Pool
2013 Long-Term Reliability Assessment and Other Key Assessment Initiatives Briefing.
Integration of Variable Generation Task Force (IVGTF): Status
Reliability Assessment Committee Reliability Workshop Priorities
Forecasting and Operations CAISO Case
Proposal to Revise Appendix D of NYSRC Policy 5
Gordon van Welie, President & Chief Executive Officer
Presentation transcript:

1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment

2 Project Timeline 08/08/03Draft Scope of Work Released to Market Participants for Review 08/29/03RFP Issued 09/29/03Technical Proposals Received 10/09/03Technical Review of Proposals Completed 10/15/03Request to Proceed to Contract with GE Approved 10/29/03Team Meeting on Data Requirements (NYISO, GE, NYSERDA, AWS, NYSDPS)

3 Project Timeline (continued) 11/14/03Team Meeting on Analytical Approach 12/02/03Contract with GE Executed 12/31/03Draft Phase 1 Report Submitted for Review 01/06/03Meeting to Review Draft Report (NYISO, GE, NYSERDA, AWS, NYSDPS) 01/09/04Draft Phase 1 Report Released to Market Participants & RPS Proceeding Parties 01/14/04Presentation by GE of Draft Phase 1 Report Results

4 Project Timeline (continued) 01/20/04Market Participants & RPS Proceeding Parties Comments and Questions Received 02/02/04Final Phase 1 Report due to NYSERDA 10/01/04Draft of Phase 2 Report due to NYSERDA 11/01/04Final Phase 2 Report due to NYSERDA

5 Send your written comments to: Please identify section and page number of draft report

6 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment Draft Report -- January 8, 2004

7 Phase 1 Objectives Assess impact of large scale wind generation on reliability of NYSBPS –Can NY reliably operate with a significant penetration of wind generation? –Consider technical issues, not economics Provide foundation for detailed system performance evaluation in Phase 2

8 Scope of Phase 1 Analysis Review world experience with wind generation Fatal flaw power flow analysis on NY transmission system Reliability analysis (LOLE) Review current NY planning and operating practices (NYSRC, NPCC, NERC, NYISO)

9 Data Sources AWS Scientific, Inc. –101 potential wind generation sites in NY State –One year of hourly wind profiles for each site –Wind generation technical characteristics –Wind energy generation forecasting NY Independent System Operator (NYISO) –Powerflow and reliability datasets Department of Public Service (NYSDPS) –Generation fuel cost and heat rates

10 NY Control Area Load Zones and Potential Wind Generation

11 World Experience With Wind New York 2008 Peak Load: Approx. 33 GW

12 World Experience Interconnection Requirements Existing wind technology in use –Voltage regulation at interconnection bus, with guaranteed power factor range –Low voltage ride-through –Monitoring, metering, event recording –Power curtailment capability New York should require these features now

13 World Experience Interconnection Requirements Emerging wind technology, available in near future –Ability to set power ramps –Governor functions –Reserve functions –Zero-power voltage regulation New York should require these when available

14 World Experience Wind Forecasting –Site-specific –Hourly and day-ahead –Central collection and analysis to facilitate state-wide coordination and operation Evolution of Technology and Procedures –Institutional flexibility to revise procedures –Gather experience while penetration is low

15 World Experience Operational Impacts in NY State –Existing hourly load variability: 920 MW –With 3300 MW of wind: Load+Wind variability: 975 MW (Increase of 6%) No operating problems anticipated –Examined experience data for minute-to-minute wind variation No increase to NY 10-minute operating reserves anticipated –Focus of Phase 2 investigation: Load following and regulation (wind variability) Unit commitment (wind forecast accuracy)

16 World Experience Based on world experience.... –NY State should be able to integrate wind generation up to at least 10% of system peak load 3300 MW of wind generation –No significant operational limits or problems anticipated if NY State adopts suitable wind farm interconnection requirements and operation practices

17 Fatal Flaw Power Flow World experience shows 10% wind penetration should be possible AWS wind site survey shows 10,026 MW potential How much power can the NY State transmission system accommodate from each of the wind sites?

18 Fatal Flaw Power Flow Process –Add wind generators per site list Redispatch other generation in same zone –If thermal overloads on transmission lines, reduce wind generator output Results (with nuclear plants at base load) –5100 MW wind at 80% peak system load –4900 MW wind at 44% peak system load Supports conclusion that 10% penetration should be possible

19 Reliability Analysis How does wind generation contribute to the reliability of the New York Control Area? –Resource Adequacy –Loss of Load Expectation, LOLE Include effects due to: –Capacity factors –Seasonal wind variation –Diurnal wind variation

20

21 Average monthly capacity factor for all 101 wind sites and NYCA monthly peak load

22 Average hourly output for all 101 wind sites and NYCA average load for July

23 Reliability Analysis For wind generation sites in NY State, average capacity contribution to reliability is approximately 10% of nameplate rating. Modification of UCAP calculation method required (Phase 2 task)

24 Planning and Operating Practices

25 Procedures Needing Modifications Sooner: –Calculation of unforced capacity value of wind generation (UCAP) –Operating procedures for operation with impending severe weather conditions

26 Procedures Needing Modifications (Continued) Later: –Calculation of operating reserves, regulation and load following requirements in the presence of wind generation –Test requirements for the Dependable Maximum Net Capacity (DMNC) measurement of wind generation –Consideration of wind generation in transmission planning

27 Phase 1 Conclusions Based on the results of this preliminary assessment: NY State should be able to integrate wind generation distributed across the NYCA to a level of at least 10% of the system peak load without significant impacts on planning, operations, and reliability of the bulk power system. Total of about 3300 MW of Wind Generation

28 GE’s Project Team Nick Miller World Experience with Wind Generation Kara ClarkFatal Flaw Power Flow Analysis Gary JordanReliability Analysis George Boukarim Review of Current NY Planning and Operating Practices Richard PiwkoProject Manager