1 EmpowHR Performance Management Process These Slides Cover Grades up to GS-15 SES handled separately.

Slides:



Advertisements
Similar presentations
The essentials managers need to know about Excel
Advertisements

SAVE DRAFT PLAN then SAVE Final Plan. the SAVE DRAFT PLAN Button on the PERFORMANCE PLAN tab will save your Work if you are interrupted. This feature.
Introduction: The Performance Management System Process
Indistar® Leadership Team Meetings. Where can we plan a meeting? Choose ‘Plan Your Meeting’ from the main menu screen Click on Meeting Agenda Setup.
Getting Started Performance Management System Tutorial for Managers Estimated Completion Time: 5 minutes Navigation instructions Begin the tutorial To.
August 2014 Liver quest User Demo: Liver Quality Enhancement Service Tool (QuEST)
E-Portfolio July2014 Managing Multi-source Feedback.
Overview of EmpowHR Performance Management Process 1.Supervisor creates performance plan 2.Reviewer concurs with plan 3.Supervisor reviews plan (slides.
HOW TO USE THE SYSTEM Specialty Crop Block Grant Program Online System.
A Participant’s View of the Internet Assessment System (IAS)
Three Phases & Work Flow of the Performance Management Process 1. Plan: 1.Supervisor Enters Non-Supervisory Plan or 1.Supervisor Enters Supervisory Plan.
Supervisors Can Designate An Alternate to “Act In Lieu Of” them in EmpowHR for A specified period of time NOTE: Delegations should be to employees with.
Copyright 2007, Paradigm Publishing Inc. POWERPOINT 2007 CHAPTER 1 BACKNEXTEND 1-1 LINKS TO OBJECTIVES Create Presentation Open, Save, Run, Print, Close,Delete.
Self-paced study guide for Online Performance Evaluations – Detailed steps for Employee Self-evaluation.
Navigation instructions Begin the tutorial Creating the Performance Plan Performance Management System Tutorial for Managers Estimated Time to Complete:
1 Excel Lesson 3 Organizing the Worksheet Microsoft Office 2010 Introductory Pasewark & Pasewark.
NCSRA Assignor Training Module For USSF North Carolina Arbiter Site Section 4 of 5 © Copyright July 2005 by Paul James, all rights reserved.
Performance Appraisal Application (PAA). Rating Cycle Rating Official reviews and approves the Performance Plan Rating Official Transfers to Higher Level.
Navigation instructions Begin the tutorial Certification of the Performance Plan Performance Management System Tutorial for Employees Estimated Completion.
IPAD Set Up. Gmail Account First, you need to set up a free gmail account with your name. If you have an existing one you may use that as long as: – A)
Interim Review- Employee 1 This is the place where the employee would input the Interim Review Self Assessment for each one of the job objectives. This.
UNCLASSIFIED / FOUO Introducing the National Guard Performance Appraisal Application (PAA) This briefing is UNCLASSIFIED.
Mail merge I: Use mail merge for mass mailings Perform a complete mail merge Now you’ll walk through the process of performing a mail merge by using the.
Log on to the site using your User ID and Password and select journal and click “Log In” Click here to create a new account Click here to check the system.
Adding Documents to OnCourse. Add a Document Look for the Documents tab and click it.
Basic Instructions on how to use One Drive and share files. ONE Drive Your LogoYour own footer.
State of Kansas Travel Authorizations Statewide Management, Accounting and Reporting Tool Entering a Travel Authorization Navigation: Employee Self Service.
Greendale Carpets Ad. Generator: A Friendly Guide Version 0.2.
System for Administration, Training, and Educational Resources for NASA External Training Requests for Users and Supervisors November 2009.
EPerformance Module 2 – Chapter 2. Preparing the employee’s appraisal For this training: 1.The employee has submitted his/her self-appraisal. 2.Colleagues.
UNCLASSIFIED / FOUO Introducing the National Guard Performance Appraisal Application (PAA) for Employee This briefing is UNCLASSIFIED.
Create the cover page by inserting clip art, WordArt, and text. Triple-click and enter your name here. Do not press the delete key! Triple-click and enter.
Introducing the National Guard Performance Appraisal Application (PAA) This briefing is UNCLASSIFIED.
LiveText Training. Registering Account First Time – Go to – Register Account (Left menu) – Click line.
Employee Enters Group Time Off Award – EmpowHR ESS Version 9.0.
WGW update Aug FY-2007 EmpowHR Performance Summary Rating Process.
January 2016 Slide 1 Monthly P-Card Reconciliation Job Aid.
Employee Certifies Concurrence With Summary Rating Via EmpowHR.
Supervisor reviews comments The employee entered for the Progress Review via EmpowHR Version 9.0 Revised Notice PM-2677.
How to Use Your Committee Workspace. Click Here AFPMB Homepage.
Employee Enters Individual Quick Track Award (Old Spot)
Supervisor enters Progress Reviews EmpowHR Version Tier Performance System Revised Notice PM-2677.
Employee views 5 Tier Progress Review in EmpowHR Version 9.0 Revised Notice PM-2677.
Employee Action To Review Midyear Progress Reviews Through ICAMS Version 8.8.
Prepared by ASM Research, Inc. 1  How to Apply for a Course Link to CHRTAS:
Creating a Google Doc A Quick Photo Tutorial. Sign in to Google Docs If you don’t already have an account, sign up for one, it’s FREE.
Supervisor Creates Performance Plan for Employee via EmpowHR.
Employee Certifies Concurrence With FY06 Summary Rating VIA EmpowHR.
This is the Home Page, enter your username and password.
Supervisor enters SUMMARY RATING in EmpowHR For Employees Under the 5 Tier Performance System.
Employee Reviews 5 Tier Performance Plan Via EmpowHR Work List.
1 Documenting Progress Reviews in EmpowHR Attachment F.
+ How to use MANAGEBAC for C&S Quick Guide. + To log in for the first time go to your school and look for the WELCOME to ManageBac .
SCC P2P – Collaboration Made Easy Contract Management training
Annual Performance Management Cycle Management Training Tutorial
FEPMIS Acquisition Plan
Carrying out a HSE competence assessment in SAPphire: Guidance for Staff This guidance has been prepared to assist staff holding HSE Critical Positions.
Introducing the National Guard Performance Appraisal Application (PAA)
CREATING A JOB REQUISITION
Carrying out a HSE competence assessment in SAPphire: Guidance for Staff This guidance has been prepared to assist staff holding HSE Critical Positions.
Employee Review Quick Guide July 2015 Version US_0.4 1.
Counselor Portion of the Student Profile
CREATING A JOB REQUISITION
Type your event details here
Type your event details here
References & Recommendations
References & Recommendations
Type your event details here
Presentation transcript:

1 EmpowHR Performance Management Process These Slides Cover Grades up to GS-15 SES handled separately

2 Supervisor goes to Manager Self Service

3 Click on Tasks 3 More

4 Click on Performance

5 Click on Performance Plan

6 Click on New Plan from the Employee List

7 Grades up to GS-13

8 Enter the start date of the appraisal period.

9 Click Add

10 Initial screen. Review dates and Click on the Looking Glass to select Rating Scale Type.

11 Select the 5 Tier Performance

12 Click on Elements and Standards Tab Do not Save or Print at any time until you have entered all elements and standards. There is no process to do an interim save. A Save sends the plan to the reviewing official.

13 Note that two mandatory elements are already on a new plan based on whether the employee is supervisory or not. Click View all to see all elements and to add the next element.

14 Standard Language comes into element. DO NOT click Copy Plan from Previous Year.

15 You may add additional language as needed. Scroll to end of language and you can type or cut an paste in other language from another source.

16 Employees will need more than two elements. Click the + key on the second element and a new element block will insert. Click the Pick Element Looking Glass to select an element from a list.

17 Select element from list by clicking on element.

18

19 Again, you can add language to standard text by cut an paste from another source. Click the + key if you have additional element to add to the plan. Once complete with adding elements click Previous Tab

20 Review this page and then Click Save. The Save action will send the Reviewer the plan for review and approval. At this time it would be appropriate to print the plan. (Not required)

21 Saved will appear quickly in the upper right and the Created the Plan will be checked and dated.

22 GS-14 and GS-15 Plans These plans are just a little different. The system was set up to not put in the mandatory elements. The following slides will give you instructions on how to prepare a plan for GS 14 and 15. Grades below GS-13 go to Slide 40

23 Enter the start date of the plan and Click Add

24 Click on the Look Up Glass to select the rating Scale.

25 Select 5 Tier Performance

26 Click Elements and Standards

27 For GS 14 and 15s a blank row comes up first. Click the – Key to delete this row.

28 The system will enter a new Measure 1. Now Click on the Look Up Glass for the Pick Element.

29 Select an Element

30 You will need to designate if Critical or Non Critical Click the + key to insert the next element

31 Click on the Look up glass again to select the next element.

32 Select an element

33

34 Need 3 to 10 elements. This slide represents the addition of a third element.

35

36 Click on View all to see all elements.

37 If you have added all elements click Previous Tab. Your data will be saved.

38 On a save you will see Saved in the upper right corner and the Created the Plan will be checked and dated.

39 Slide 39 ends the GS 14 and GS 15 plan development. The rest of the process is the same for all grades.

40 Reviewer Process

41 The reviewer will get an and worklist item. Reviewer should click the Link.

42 Reviewer will see plan. Click Elements and Standards Tab

43 Click view all to see all elements.

44

45 Changes can be made to the language by the reviewer.

46 Once reviewer has completed review click Performance Plan Tab or link

47 Click Reviewer Concurred and Save.

48 If Reviewer would happen to forget to save this edit will come up. Click OK to return to save or you will lose any changes you made.

49

50 Return to Supervisor with Concurred Plan

51 At this point the supervisor will get a worklist item that the reviewer has concurred. Click on the link. No action needed here but just to view the plan. That will clear the worklist item. It supervisor makes changes after it is reviewed it does not go back to the reviewer. The employee will have worklist item from Review that will bring up current plan.

52

53 Employee Process

54 Employee view of plan. Employee should get a worklist Item to click and take them directly to the plan. Or employee may Click Employee Self Service, Tasks and Performance.

55 Click Existing Plan.

56 Select date appropriate plan. For FY-07 you will most likely be looking for an October Review Period date.

57 Employee should click Elements and Standards tab.

58 Review Elements and Standards. Employee cannot edit. Contact supervisor to discuss plan and any needed changes.

59

60 Employee attempt to edit or add.

61 Upon save attempt the system will advise that changes cannot be made. Click OK, Edit out any changes and return to Save.

62 Click Viewed Discussed Plan or Refused to Sign and Save.

63 Supervisor Worklist after Plan has been viewed by Employee

64 That will send a worklist item back to the supervisor that you have reviewed your plan.

65 Supervisor or Employee may want to print a copy of the plan. Click Create Printable Form

66 System will work for several seconds to even up to a minute. The system is generating your form, be patient. The View Document link will appear to print the plan.

67 An Adobe Document will come up that you may print.

68

69 Once supervisor exits the plan the worklist item will be gone. The Plan creation process has been Completed.