Data Acquisition Software for CMS HCAL Testbeams Jeremiah Mans Princeton University CHEP2003 San Diego, CA.

Slides:



Advertisements
Similar presentations
Roma, P. Camarri DAQ & on-line monitoring at X5 (G. Aielli, P. Camarri) DAQ realization and performance for RPC tests at X5-GIF. Adds and changes.
Advertisements

June 19, 2002 A Software Skeleton for the Full Front-End Crate Test at BNL Goal: to provide a working data acquisition (DAQ) system for the coming full.
The First-Level Trigger of ATLAS Johannes Haller (CERN) on behalf of the ATLAS First-Level Trigger Groups International Europhysics Conference on High.
Calorimeter1 Understanding the Performance of CMS Calorimeter Seema Sharma,TIFR (On behalf of CMS HCAL)
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
CHEP04 - Interlaken - Sep. 27th - Oct. 1st 2004T. M. Steinbeck for the Alice Collaboration1/20 New Experiences with the ALICE High Level Trigger Data Transport.
2 July 2003Paul Dauncey - DAQ1 Progress on CALICE DAQ Paul Dauncey Imperial College London, UK.
March 2003 CHEP Online Monitoring Software Framework in the ATLAS Experiment Serguei Kolos CERN/PNPI On behalf of the ATLAS Trigger/DAQ Online Software.
Kaori Maeshima (FNAL), Muon Alignment EDR: FEB. 28, Endcap Alignment EMU Alignment DAQ Muon Alignment EDR Feb. 28, 2002 Outline: 1.Components to.
Evaluation of G4 Releases in CMS (Sub-detector Studies) Software used Electrons in Tracker Photons in the Electromagnetic Calorimeter Pions in the Calorimeter.
DAQ System at the 2002 ATLAS Muon Test Beam G. Avolio – Univ. della Calabria E. Pasqualucci - INFN Roma.
Emulator System for OTMB Firmware Development for Post-LS1 and Beyond Aysen Tatarinov Texas A&M University US CMS Endcap Muon Collaboration Meeting October.
TRIGGER-LESS AND RECONFIGURABLE DATA ACQUISITION SYSTEM FOR POSITRON EMISSION TOMOGRAPHY Grzegorz Korcyl 2013.
RPC PAC Trigger system installation and commissioning How we make it working… On-line software Resistive Plate Chambers Link Boxes Optical Links Synchronization.
Online Calibration of the D0 Vertex Detector Initialization Procedure and Database Usage Harald Fox D0 Experiment Northwestern University.
CALOR2006 June 7, Julie Whitmore Fermilab Overview of the CMS Hadron Calorimeter.
6-10 Oct 2002GREX 2002, Pisa D. Verkindt, LAPP 1 Virgo Data Acquisition D. Verkindt, LAPP DAQ Purpose DAQ Architecture Data Acquisition examples Connection.
Summary of CSC Track-Finder Trigger Control Software Darin Acosta University of Florida.
S. Brambilla, “Recent DAQ integration test at L.N.L May 2008” 7 th AGATA Week, Uppsala, 8-11 July th AGATA Week Uppsala, 8-11 July 2008 Recent.
A Front End and Readout System for PET Overview: –Requirements –Block Diagram –Details William W. Moses Lawrence Berkeley National Laboratory Department.
Management of the LHCb DAQ Network Guoming Liu * †, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
Overview of DAQ at CERN experiments E.Radicioni, INFN MICE Daq and Controls Workshop.
Motivation General rule for muon triggers: Never neglect a possible backup reduction factor. It will always come back to you. Even if RPC trigger works.
May 1-3, LHC 2003V. Daniel Elvira1 CMS: Hadronic Calorimetry & Jet/ Performance V. Daniel Elvira Fermilab.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
News on GEM Readout with the SRS, DATE & AMORE
Sep. 17, 2002BESIII Review Meeting BESIII DAQ System BESIII Review Meeting IHEP · Beijing · China Sep , 2002.
1 H C A L S.Sergueev, NEC2001, Varna, September 2001 CMS HCAL Slow Control System for the CMS Hadron calorimeter S.Sergueev, FNAL/JINR CMS HCAL.
DAQ Andrea Petrucci 6 May 2008 – CMS-UCSD meeting OUTLINE Introduction SCX Setup Run Control Current Status of the Tests Summary.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
The experimental setup of Test Beam HE EE ES BEAM  A slice of the CMS calorimter was tested during summer of 2007 at the H2 test beam area at CERN with.
Update on the project - selected topics - Valeria Bartsch, Martin Postranecky, Matthew Warren, Matthew Wing University College London CALICE a calorimeter.
TDAQ Experience in the BNL Liquid Argon Calorimeter Test Facility Denis Oliveira Damazio (BNL), George Redlinger (BNL).
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
Electronics Review, May 2001Darin Acosta1 OPTICAL SP 1 Muon Sorter 3  / port card 3  / sector ME1 ME2-ME3 ME4 SR DT TF SP From CSC Port Cards MS MB1.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
Software for the CMS Cosmic Challenge Giacomo BRUNO UCL, Louvain-la-Neuve, Belgium On behalf of the CMS Collaboration CHEP06, Mumbay, India February 16,
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
Feb 24, Abnormal Events in HF: TB04, Simulation, and Feb.08 Fermi Testbeam Anthony Moeller (U. Iowa) Shuichi Kunori (U. Maryland) Taylan Yetkin (U.
Management of the LHCb DAQ Network Guoming Liu *†, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
Geant4 Tutorial, Oct28 th 2003V. Daniel Elvira Geant4 Simulation of the CMS 2002 Hcal Test Beam V. Daniel Elvira Geant4 Tutorial.
ECFA Workshop, Warsaw, June G. Eckerlin Data Acquisition for the ILD G. Eckerlin ILD Meeting ILC ECFA Workshop, Warsaw, June 11 th 2008 DAQ Concept.
Event Management. EMU Graham Heyes April Overview Background Requirements Solution Status.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
ATLAS The ConditionDB is accessed by the offline reconstruction framework (ATHENA). COOLCOnditions Objects for LHC The interface is provided by COOL (COnditions.
R. Fantechi 2/09/2014. Milestone table (7/2014) Week 23/6: L0TP/Torino test at least 2 primitive sources, writing to LTU, choke/error test Week.
Software and TDAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
Online Software November 10, 2009 Infrastructure Overview Luciano Orsini, Roland Moser Invited Talk at SuperB ETD-Online Status Review.
1 J. Varela, CMS Trigger, RT09, Beijing, May 2009 J. Varela IST/LIP Lisbon CMS Trigger Project Manager 16 th IEEE NPSS Real Time Conference May 10-15,
Super BigBite DAQ & Trigger Jens-Ole Hansen Hall A Collaboration Meeting 16 December 2009.
András László KFKI Research Institute for Particle and Nuclear Physics New Read-out System of the NA61 Experiment at CERN SPS Zimányi Winter School ‑ 25.
The LHCb Calorimeter Triggers LAL Orsay and INFN Bologna.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
HCAL Fall meeting, Nov 11-13,`04 HCAL digital optic link and trigger mapping Ianos Schmidt The university of Iowa.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
E. Hazen1 Fermilab CMS Upgrade Workshop November 19-20, 2008 A summary of off-detector calorimeter TriDAS electronics issues Eric Hazen, Boston.
Slow Control and Run Initialization Byte-wise Environment
Slow Control and Run Initialization Byte-wise Environment
JEDI polarimetry – Developments at SMART|EDM_Lab
CMS High Level Trigger Configuration Management
AHCAL Beam Interface (BIF)
slicPandora: slic + pandoraPFANew
Trigger, DAQ, & Online: Perspectives on Electronics
HCAL Configuration Issues
Sergey Abrahamyan Yerevan Physics Institute APEX collaboration
Example of DAQ Trigger issues for the SoLID experiment
The CMS Tracking Readout and Front End Driver Testing
Data Concentrator Card and Test System for the CMS ECAL Readout
FED Design and EMU-to-DAQ Test
Presentation transcript:

Data Acquisition Software for CMS HCAL Testbeams Jeremiah Mans Princeton University CHEP2003 San Diego, CA

3/25/2003 CHEP 2003 Jeremiah Mans Princeton University DAQ Software for CMS HCAL Testbeams 2 Quick Review of the CMS HCAL Sampling calorimeter using brass absorber and plastic scintillator panels  Light is collected using wavelength-shifting fibers and carried to a hybrid photodiode. Segmentation  4 5° phi slices/wedge  18 eta slices/wedge  17 depth layers added optically – do not count towards channel count Readout  QIE digitization at 40 MHz (33 MHz for 2002 test beam)  Optical link to HCAL Trigger/Readout (HTR)  HTR sends 20 time slices/channel to Data Concentrator (DCC) on L1Accept.

HCAL Readout Chain Hybrid Photodiode QIE CCA 10 Front End (on detector) Readout crates (in blockhouse) HCAL Trigger Readout (HTR) 8/16 inputs 24/48 channels Data Concentrator (DCC) 18 inputs Up to 432 channels S-LINK Trigger

3/25/2003 CHEP 2003 Jeremiah Mans Princeton University DAQ Software for CMS HCAL Testbeams 4 Subdetectors Wire chambers for particle position detection (TDC) Trigger scintillators between wire chambers (TDC) 7x7 crystal ECAL mockup (QDC) HCAL wedge (HCAL DAQ chain) Muon identification scintillator

3/25/2003 CHEP 2003 Jeremiah Mans Princeton University DAQ Software for CMS HCAL Testbeams 5 Testbeam Area

3/25/2003 CHEP 2003 Jeremiah Mans Princeton University DAQ Software for CMS HCAL Testbeams 6 DAQ Hardware HCAL is read out using SLINK-32 from the DCC into DMA memory on a Linux PC. All other subdetectors are read out over VME, using SBS VME  PCI fiber bridge.  Second SBS link used for HCAL crate configuration. Linux PC is a dual processor 1.2 GHz Pentium III in a custom rackmount case. Windows PC used for DCS and configuration/communication with front-end electronics. (DIM interface to DAQ PC)

3/25/2003 CHEP 2003 Jeremiah Mans Princeton University DAQ Software for CMS HCAL Testbeams Testbeam Software Modular design  Each module is a separate pthread thread. Inter-Module Communication  Broadcast commands of fixed meaning INIT, RUN, STOP, LOAD, READOUT, etc…  Exported module parameters Module can make variables available for other modules to read or modify. Each subdetector has its own readout module, which produces one or more data blocks, which are sent an EventBuilder module.

3/25/2003 CHEP 2003 Jeremiah Mans Princeton University DAQ Software for CMS HCAL Testbeams 8 Data Storage The EventBuilder distributes the completed events to various consumers, including the Writer.  The Writer formats and stores events in ROOT files.  Other consumers are responsible for monitoring the data Runs Database  XML database of basic run parameters (streams configured, events taken, table position, etc)  Published in searchable form on the web

3/25/2003 CHEP 2003 Jeremiah Mans Princeton University DAQ Software for CMS HCAL Testbeams 9 Run Control via Java GUI Connects to DAQ through IP port  a crash in the GUI doesn’t bring down the DAQ Capabilities  Send broadcast messages  Access/change the values of all exported parameters

3/25/2003 CHEP 2003 Jeremiah Mans Princeton University DAQ Software for CMS HCAL Testbeams 10 Data quality monitoring Within the DAQ, various plots are prepared using the data stream and made available over an IP port.  The GUI contains a separate window for data quality monitoring.

3/25/2003 CHEP 2003 Jeremiah Mans Princeton University DAQ Software for CMS HCAL Testbeams Testbeam Performance 7/1/02 – 9/20/02  Runs: 3302 SPS Spills: 54,849  Events: 105,380,936  Average DAQ rate: 350 Hz (peak 960 Hz)  Beam data event size: 6kB  Total data stored in CASTOR: 291 GB (compressed) Run 3328: ECAL+HCAL 100 GeV  Multiple hits in one 600 ns time slice

3/25/2003 CHEP 2003 Jeremiah Mans Princeton University DAQ Software for CMS HCAL Testbeams 12 Testbeam Resolution Pions (MIP in ECAL)

3/25/2003 CHEP 2003 Jeremiah Mans Princeton University DAQ Software for CMS HCAL Testbeams 13 In 2002, the final HCAL electronics was used only to read out the barrel and outer parts of the detector. In 2003, the final electronics will be used for the barrel (HB), endcap (HE), and forward (HF) calorimeters.  HB+HE one partition  HF one partition Additionally, the 2003 HCAL Testbeam DAQ will be built using the xDAQ toolkit provided by the central CMS DAQ group.  See other talks in this session for full details on xDAQ 2003 Testbeam Changes

3/25/2003 CHEP 2003 Jeremiah Mans Princeton University DAQ Software for CMS HCAL Testbeams 14 Configuration/Firmware Databases The 2003 HCAL testbeam DAQ will be set up using configuration information stored in an XML database. This database will contain hardware configuration values, trigger setup information, and firmware version information. The mapping between firmware revisions and actual firmware files will be handled by a separate database. These databases will accessed with xDAQ using a modified version of the standard dstore module which supports simple SQL-style queries.

3/25/2003 CHEP 2003 Jeremiah Mans Princeton University DAQ Software for CMS HCAL Testbeams 15 Additional improvements/Extensions “Examine”-type monitoring  Allow sampling of event data through an IP port  Online access to partial data sample in a ROOT session – easier development of data quality monitoring scripts

3/25/2003 CHEP 2003 Jeremiah Mans Princeton University DAQ Software for CMS HCAL Testbeams 16 Goals for 2003 HB/HE  Large scale testing of HB/HE DAQ electronics  Testing of phase-dependent information  Investigating mysteries from the 2002 data HF  Complete calibration of 18 wedges 1000 electrons for each EM fiber  Sustained average rate of 3kHz Overall: get hardware (and software) to as near a final form as possible.