Imago LEAP Recovery Procedure for Cryo-Compressor and Cold Finger The LEAP is equipped with a Uninterrupted Power Supply (UPS). Located in the 19 inch.

Slides:



Advertisements
Similar presentations
General Safety Overview and Information
Advertisements

Operational Ideas for Supercritical Systems The Ultimate Criteria for Appreciation ….. P M V Subbarao Professor Mechanical Engineering Department I I.
C230 Kompressor Oil Change Procedure
Dennis Fire Appliances Operations & use. PTO Step 1 Move slide cover towards the drivers seat to lock out the gearbox Step 2 Select drive on the gear.
Operating Functions.
Circulating Water System
Part III –Property Condition Report
Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
Operating Nitrox Systems 11 Presented by Nuvair. Operating Nitrox Systems2 Membrane systems produce nitrox efficiently Compressed air flows through the.
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
DRIP DISPERSAL SYSTEMS Problems and Solutions Presented by Keith Surface.
Heating Control Devices
6200 Calorimeter Operation Colby College Version Parr Instrument Company.
Physics 1809 Minilab 2: Heat and Temperature Physics 1809: The Relationship Between Heat and Temperature Purpose Understand how the total energy in a closed.
Clean Air Box Usage & Care CABs RAMs CO Monitors.
KLINGE’S NMR 262 Two Independent Systems Integrated into one Unit This Requires Special Features:  Total Redundancy of Refrigeration Components  Total.
Installation and Initial Start Up by Martin Noska, Service Engineer, Aftersales & Service.
Installation and Initial Start Up Worldwide Manufacturer of PSA Generators by Laco Remias, Service Engineer, Aftersales & Service.
Dennis Sabre Fire Appliances
PEUGEOT 206 INSTALLATION 99’— 05’ TU5JP4
1. Pump down the chamber from the atmosphere pressure 2. Using RHEED to obtain diffraction images 3. Open the RHEED chamber or venting from high vacuum.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
Varian 3118 Thermal Evaporation System
Marine Engine Systems Merchant Marine Training Centre.
AccuMax Multi-Point Injection Mechanics
CAFS On-Line Orientation Montgomery County Fire & Rescue Service Operating the CAFS Controllers.
Programming instructions.. To set the time Pool pump and heat pump must be ON. Pictrue 1Picture 2Picture 3 1.Press, the hour will flash (picture 1) 2.To.
Solar Cell conductive grid and back contact
Domina PLUS B WORKING DIAGRAMS TROUBLESHOOTING INTERNAL VIEWS WIRING DIAGRAMS INSTALLATION 03 PREVIOUS MODEL.
B757 Review Questions.
EZ Reach 40 Training & Procedure Manual. Unit Capacity One of the most important considerations when operating this machine is the Bucket Capacity of.
ICP Shutdown. Pump Flush the nebulizer spray chamber with acid for 5 minutes by choosing the location of the 3% HNO3 and moving the sample needle “position”.
Chapter 5 Starting up. Many accidents occur because the driver was not ready to take control of ATV Know your start up procedure!
Student Book © 2004 Propane Education & Research CouncilPage Reducing Cargo Tank Vapor Pressure Using a Plant Compressor In order to use.
Reser- Voir Turbo Pump 1 Five- Fold Turbo Pump 2 Scroll Pump1 Scroll Pump2 Tgt. Cham- ber N2N2 H2H2 P2 P1 P3 P4 P5 P6 Panel Tgt. Cell V2V1 V3 V0 E0 E1.
What tests are necessary to make sure your kegs are being cleaned, sanitized and filled correctly By Andrew J. Brewer
ISX12 G & ISL G Cold Weather Operation 1. ISX12 G and ISL G Cold Weather Operation  Cold weather affects CEGR SI natural gas engines differently compared.
To complete installation on electronic models run one wash cycle then click the DIP switch setting no.4 to the on position DIP switch settings.
Chapter 6 Protecting Your Files. Protecting Your Files FAQs: – What should I know about losing data? – How can I protect my files from viruses? – How.
LCMS-325 TQ Operation Chem 115 Paul Hrvatin Winter 2013.
Automotive Engines: Theory and Servicing, 7/e By James D. Halderman Copyright © 2011, 2009, 2005, 2001, 1997 Pearson Education, Inc., Upper Saddle River,
Discover the Dosmatic Difference Trouble Shooting your Dosmatic injector for years of service.
STEP 1 Locate the transmission cooler line connection on the vehicle. Identify the correct adapters to be used by referring to the vehicle application.
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
Procedures.
All Freezer Advance. When the Freezer is first supplied with power or if a power outage occurs, the display will indicate this by flashing the temperature.
S A Griffiths CM42 June 2015 Electrical & Control.
Cleaning Mode Startup Mode Spray Mode Maintenance Mode Standby Mode
How to power down your NAS safely
Book E3 Section 1.4 Air-conditioning
14 Refrigerant Recovery, Recycling, and Recharging.
In-feed and Amine Sweetening 11/4/09
R1 Fundamentals of Refrigeration
Operation of CSC DCS Ryan Carroll Carnegie Mellon 29-Sept-2009.
1.3-GHz Cavity Vacuum Furnace at IB4
Project Manager’s Report + DC/MoM Report
GasTurb 13 – Tutorial 4 Optimizing a Cycle Copyright © GasTurb GmbH.
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
T-6B On-Board Oxygen Generation System (OBOGS)
R1 Fundamentals of Refrigeration
Engine Oil Changes.
Engine Oil Changes.
Mathew C. Wright January 26, 2009
Digital Chart Recorder Operation
Cryogenics – The Basics
CAFS On-Line Orientation
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
Compressor Operating Instructions
T-6B On-Board Oxygen Generation System (OBOGS)
Presentation transcript:

Imago LEAP Recovery Procedure for Cryo-Compressor and Cold Finger The LEAP is equipped with a Uninterrupted Power Supply (UPS). Located in the 19 inch rack. This UPS will keep the entire system running for about 2 hours. The Cyrogenic compressor (shown at the right) requires the most energy and is the biggest drain on the battery. During a brown out/power surge, this compressor will turn off. If there are ever ANY questions about a SYSTEM RECOVERY, call Imago at Failure to PROPERLY recover the system after a shutdown can cause SERIOUS DAMAGE. MARK LEVESQUE, IMAGO FIELD SERVICE ENGINEER AT , Please see section 17 of the LEAP user manual, “LEAP System Shut Down and Recovery” for additional information

Cryogenic Chiller The cryo-pump will automatically shut down for two main reasons: 1.Power outage 2.No water flow The cryo-compressor should be turned off whenever an interruption in the house water is expected or a filter needs to be changed. Depending on the time expected for the pump to be off, a few precautions need to be taken. The cryo-pump, or cold finger, keeps the specimen at cryogenic temperatures. When the cold finger warms up, absorbed gasses will be released from the surface, causing a spike in pressure.

Manual Shut Down of Chiller <10 min If the system will be off for less then 10 minutes, just turn the compressor off. A minimal amount of out-gassing can be expected. Advanced User: In the LCC settings tab, click on cryo- settings, then turn the heater OFF. Do this before turning off the compressor.

Manual Shut Down of Chiller >10 min If the system will be off for more then 10 minutes, a large amount of out-gassing can be expected and the system must be put into a safe mode to preserve the life of the ion pump. 1.Press Cryo Settings and set “HEATER to “OFF: 2.Turn off cryo-compressor (See previous slide) 3.Open Buffer chamber gate valve (in LCC) 4.Close ion pump gate valve (in LCC) These steps will insure that the desorbing gases will be pumped out by the buffer chamber turbo pump, preserving the integrity and life span of the ion pump. IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT RICH MARTENS OR MARK LEVESQUE, IMAGO FIELD SERVICE AT ,

Turning Compressor On 1.Make sure water is flowing to the compressor 2.Check that there is Helium flowing to the cold head 3.Check that the buffer gate valve is open and the ion pump gate valve is closed, (see previous slide) 4.On the compressor unit, press the on button. If the compressor has been off for an extended period, the switch will kick off. Repeat this step up to 3 times, If compressor still has not turned on, then wait 30 seconds. Repeat three times, or as long as needed to start the unit 5.Once the Cryo-pump is running, and the Analysis chamber pressure is >1.0e-9 OR EQUAL to or LOWER THEN the buffer chamber pressure, open ion pump gate valve and close buffer gate valve. System should recover in 2-6 hours, depending how long the compressor was turned off