Organization mid 2011-2016 Initial comments The organization covers the CLIC accelerator activities but also including: ILC-CLIC WGs Detectors for CLIC-ILC.

Slides:



Advertisements
Similar presentations
Project Cycle Management
Advertisements

© Grant Thornton UK LLP. All rights reserved. Review of Partnership Working: Follow Up Review Vale of Glamorgan Council Final Report- November 2009.
Mandate of Parameter and Lay out Committee (PLC) of the HL-LHC project L. Rossi HL-LHC PC.
Systems Analysis and Design 9th Edition
Chapter 2.
Proposal for a Constitution for MICE A Plan for Discussion P Dornan G Gregoire Y Nagashima A Sessler.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Role of Management and Technical Coordination
AICT5 – eProject Project Planning for ICT. Process Centre receives Scenario Group Work Scenario on website in October Assessment Window Individual Work.
1 Framework Programme 7 Guide for Applicants
Atlanta Public Schools Project Management Framework Proposed to the Atlanta Board of Education to Complete AdvancED/SACS “Required Actions” January 24,
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
Mantychore Oct 2010 WP 7 Andrew Mackarel. Agenda 1. Scope of the WP 2. Mm distribution 3. The WP plan 4. Objectives 5. Deliverables 6. Deadlines 7. Partners.
CS 360 Lecture 3.  The software process is a structured set of activities required to develop a software system.  Fundamental Assumption:  Good software.
Certificate IV in Project Management Introduction to Project Management Course Number Qualification Code BSB41507.
1 Welcome to all Outline: CDR status planning information information still needed Goals of meeting and practical information.
Second expert group meeting on Draft fiche on delegated act on the European code of conduct on partnership (ECCP) Cohesion Policy
Ahmad Al-Ghoul. Learning Objectives Explain what a project is,, list various attributes of projects. Describe project management, discuss Who uses Project.
© 2001 Change Function Ltd USER ACCEPTANCE TESTING Is user acceptance testing of technology and / or processes a task within the project? If ‘Yes’: Will.
More on work-packages Reminder: We have and continue to elaborate the WPs (reminder next slide) We have talked about main activities and CASC (reminder.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
1 1 LCC Physics and Detector Hitoshi Yamamoto ECFA LC2013, DESY May 27, 2013.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
Agenda : CLIC Civil Engineering and Services (CES) WG.
“Linear collider studies: This heading includes the total funding for CTF3, the CLIC study and the CLIC/ILC collaboration as well as the CERN’s participation.
CLIC-ILC WG Oxford, Jan 10 Slide 1 CLIC – ILC General Issues WG, Update BackgroundChargeStatusPlans.
1 Tunnel implementations (laser straight) Central Injector complex.
Chapter 3 Strategic Information Systems Planning.
Recent news from CLIC C&S WG and CLIC-ILC WG on General Issues Ph. Lebrun CLIC Project Meeting 1 June 2011.
CLIC main activities and goals for 2018 Design and Implementation studies: CDR status: not optimized except at 3 TeV and not adjusted for Higgs discovery,
General news, future LC organisation, update on CDR Vol3… Lucie Linssen L. Linssen, CLIC physics and detector monthly meeting, May 14th
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
WHO EURO In Country Coordination and Strengthening National Interagency Coordinating Committees.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
Considerations for the CDR and Strategy Update The current CDR planning focuses on 3 TeV and a downscaled not optimised 500 GeV machine, aiming for completion.
Ian Bird GDB CERN, 9 th September Sept 2015
WP3 Harmonization & Integration J. Lauterjung & WP 3 Group.
TSG-S OMA (Open Mobile Alliance) Ad-Hoc Report Richard Robinson Chair - 3GPP2 TSG-S SC B_Eshwar Pittampalli’s (Lucent) comments/concerns embedded.
ILD SiD CALI CE LC- TPC FCAL R&D group (ILC) group (ILC) “collab” (CLIC)  host lab “collab” (LC) “collab” (LC) “collab” (LC) R&D groups involved in “world-wide.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Global Design Effort September 20-22, 2006 MAC Review R&D Programme (Tools) Eckhard Elsen GDE DESY.
Introdcution to Workpackage/Activity Reflection D. Schulte.
Software Development Process CS 360 Lecture 3. Software Process The software process is a structured set of activities required to develop a software.
Costing review Extract from slide of Philippe: The Panel was impressed by the quality of the presentations and degree of detail to which the value.
Americas comments on Linear Collider organization after 2012 P. Grannis, for LCSGA – Aug. 24, 2011 ILCSC GDE.
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
CLIC project 2012 The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Section 4.9 Work Group Members Kris Hafner, Chair, Board Member Rob Kondziolka, MAC Chair Maury Galbraith, WIRAB Shelley Longmuir, Governance Committee.
1 The next steps – focusing points Define the scope, strategy and cost of the project implementation. Main input: The evolution of the physics findings.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
CLIC 23 rd Project Meeting: news and updates Philip Burrows John Adams Institute Oxford University 1.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
1 Impedance-related and others collective effects Impedance-driven collective effects/Instabilities –Single-Bunch (very high priority) –Multiple-bunch.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
CLIC Organogram CLIC Collab. Board L.Rivkin MoU with annexes describing coll. efforts (note: in reality more complicated) CLIC SC (Stapnes) Repr. from.
Croatia: Result orientation within the process of preparation of programming documents V4+ Croatia and Slovenia Expert Level Conference Budapest,
Systems Analysis & Design 7 th Edition Chapter 2.
Memorandum of Cooperation for the CLIC detector and physics study Lucie Linssen Monthly meeting 19/11/
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Mandate Priorities Other tasks Membership Forthcoming reports to CTC
LCC L. Evans, Santander, 2nd June 2016
The European Strategy for Particle Physics
Input to Strategy currently planned
Collaboration New collaborators in 2016:
Presentation transcript:

Organization mid Initial comments The organization covers the CLIC accelerator activities but also including: ILC-CLIC WGs Detectors for CLIC-ILC in the framework of the CDR and later implementation plan – Only very few MoU appendixes or agreements cover detector studies currently, the work is organised in working groups for the CDR, through technology collaborations, and in collaboration with ILC detector concepts Physics – as above (LCD covers detectors/physics) Site studies for CLIC (through ILC-CLIC WG it covers also ILC siting) This talk will have a bias towards the accelerator part. Priority now has been to make plans for the actual work needed (see talk about WPs). Organization will be adapted as needed (also taking into account global LC organisation) and several steps can be foreseen: 1.Adapt this year to new CLIC work-plan and associated working groups (main point today) 2.Adapt collaboration structure next year (will only discuss briefly) 3.Follow development of LC organization, clearer by end 2011? (will impact point 2. in particular) – see agenda point introduced by Tatsuya Nakada 4.Detector/physics organization to be addressed towards the second half of the year and after CDR volume 2 (will only discuss briefly)

Before 2011 CDR (2011), CLIC feasibility established – Project Preparation phase Goal for 2016: Develop a project implementation plan for a Linear Collider (at CERN): addressing the key physics goals as emerging from the LHC data with a well-defined scope (i.e. technical implementation and operation model, energy and luminosity), cost and schedule with a solid technical basis for the key elements of the machine and detector including the necessary preparation for siting the machine at CERN within a project governance structure as defined with international partners After 2016 – Project Implementation phase, including an initial period to lay the grounds for full approval Considering the preparation steps foreseen and the resources situation it is clear that several key tasks will need further effort before the project can move into construction: ― finalization of the CLIC technical design, taking into account: ― results of technical studies done in the previous phase ― final energy staging scenario based on the LHC Physics results, which should be fully available by the time ― possible construction of CLIC Zero as first CLIC phase ― further industrialization and pre-series production of large series components with validation facilities ― further detector and physics studies, with increased emphasis on technical coordination issues and integration ― revision of the project implementation plan of CLIC, following the energy staging strategy and detailed resource discussion with all partners – providing the basis for a staged or full approval, and subsequent construction start up During this initial period we will need to produce the necessary documents to support a proposal for CLIC construction start-up Work-plan for the coming years

The next steps – focusing points Define the scope, strategy and cost of the project implementation. Main input: The evolution of the physics findings at LHC and other relevant data Findings from the CDR and further studies, in particular concerning minimization of the technical risks, cost, power as well as the site implementation. A Governance Model as developed with partners. In order to achieve the overall goal for 2016 the follow four primary objectives for 2011—16 can defined: These are to be addressed by activities (studies, working groups, task forces) or work-packages (technical developments, prototyping and tests of single components or larger systems at various places) Define and keep an up-to-date optimized overall baseline design that can achieve the scope within a reasonable schedule, budget and risk. Beyond beamline design, the energy and luminosity of the machine, key studies will address stability and alignment, timing and phasing, stray fields and dynamic vacuum including collective effects. Other studies will address failure modes and operation issues. Indentify and carry out system tests and programmes to address the key performance and operation goals and mitigate risks associated to the project implementation. The priorities are the measurements in: CTF3+, ATF and related to the CLIC Zero Injector addressing the issues of drivebeam stability, RF power generation and two beam acceleration, as we as the beam delivery system. (other system tests to be specified) (technical work-packages and studies addressing system performance parameters) Develop the technical design basis. i.e. move toward a technical design for crucial items of the machine and detectors, the MD interface, and the site. Priorities are the modulators/klystrons, module/structure development including testing facilities, and site studies. (technical work-packages providing input and interacting with all points above)

“Resource – drivers” Preliminary Work-program (I refer to talk by Roberto Corsini): The work is organized in WPs covering from hardware (very straight-forward WPs) to working-groups (attempt to also describe as WPs) Key reasons: Needed for planning inside and outside CERN, review and progress follow up of objectives, documentation Task-forces as needed (time-limited for very specific goals) WP: Document in APT system, adapted such that external teams can be included Including links to document with WP text Top level agreements: MoU, K-contracts, Collab. Agreements Appendices kept updated by 6 monthly review Keep all in EDMS

Organogram 2009 CLIC/CTF3 Collab. Board K.Peach/JAI CLIC Steering Committee J.P.Delahaye CLIC Advisory Committee T.Raubenheimer/SLAC CLIC Design & Accelerator J.P.Delahaye LCD Physics & Detectors L.Linssen Beam Physics D.Schulte Structure development W.Wuensch Technical design H.Schmickler Conceptual Design Report Editorial Board: H.Schmickler Cost & Schedule P.Lebrun CLIC meeting G.Geschonke CTF3 project G.Geschonke/R.Corsini Technical Design Phase R.Corsini Physics & Detectors meeting

Decision making process (on technical matters) Technical development CASC plus CLIC Project Meeting (and similar for detector/physics): WP follow up, resource matters, technical issues etc Work-package activities Individuals CSC: Collaboration board (might vote, 1 institute = 1 vote): Overall resource matters, Strategic matters, policies, Joint acc, det/physics matters, Controversial matters, …. Decide on policy matters, Baseline matters, Political Matters, … From the actual work to overall decisions -Keep decisions at the right level -Prepare matters bottom up (while some matters might need to be initiated top-down) -Information flow both way

Organogram for the future CLIC/CTF3 Collab. Board K.Peach CLIC SC (Stapnes) Repr. from CASC and DPSC and some extra members CASC (Stapnes) Activity managers (resp. for groups of WPs) below plus some extra members Detector/Physics (Linssen), introduce Det. Phys. SC (DPSC) towards end of the year, also define post.CDR workplan around that time Will need external evaluation committee also in the future Might interact with overall global LC consortium at some stage (CB and CSC) CB: Every 6 months, links to WP update and status to provide active feedback/discussion basis to collaborators; i.e. need WP review structure (internal)

Accelerator part CASC (weekly – shorten meeting if possible) Focus below on links to WPs and the activity managers for these work-packages 2-3 more with major work-package responsibilities (tbd) - asap 1-2 representatives from line management (group level) – from July if possible Tech. Secretary for Proj. meetings when needed (Tecker) - now Augier as secretary for CASC LC implementation issues (Lebrun) – e.g. cost, schedule, power, interface to site and civil engineering (incl. conv. facilities?) WPs in GS, ILC-CLIC common issues and industrial studies Beam physics and machine parameters (Schulte) – work-packages formulated, specific studies urgent, as a staged approach for volume 3 Systemtests (e.g. CFT3+) including preparation of CLIC 0 (Corsini) – work-packages formulated Technical developments and integration (Schmickler) – work-packages formulated RF structure development (Wuensch) – work-packages formulated Comment: The work-packages in these activity areas covers (should cover) the relevant machine activities from sources to dump (i.e. the entire PBS) related to the topic of the WPs: with the exception of the RF structure work which is in reality a Technical Development (a subset of the Technical Developments above). Given its importance and focus in next period it is nevertheless kept as its own activity area. Introduce CLIC Project Meetings: Overall technical discussions every 6-8 weeks (focus on accelerator project) Increase communication between various parts of the project and the project partnes Allow external collaborators to get an overview Keep Friday CLIC meetings/seminars: Will partly be used as follow up, prep. CLIC project meetings when appropriate, will keep the news, skip the minutes

CLIC Steering Committee LC study leader (Stapnes) Activity managers (Lebrun, Schulte, Corsini, Schmickler, Wuensch) Detector/Physics Studies (Linssen) plus two covering physics (theory, phenomenology) and a rep from detector/physics SG at a later stage – to be determined Collaboration Spokesperson (already in) Review Office leader when identified All together 9-10 people*, supported by the CLIC “support office” Additional members ex-officio: CB chair (Peach), ILC representative (Foster), RECFA contact (Fuster) - CERN line management (tbd) Meet every 6-8 weeks, linked to CLIC Project Meetings (one week before?) Implement changes in ex-officio participation as soon as possible Detector/Physics changes in second half of this year – to be discussed in more detail JPD and GG remain invited until end September – without obligations to come !

Some comments about functions CLIC support office: Augier as project assistant covering the project administration, with help from Filippova for WPs documentation and updates, Technical Secretary for Project Meetings (Tecker) – more needed ? FunctionCommentCASC repr.CSC repr. Activity managersWPs definition and follow upMembers SpokespersonR.CorsiniMember Resource CoordinationIncl. being our assigned contact to AT departments for resource planning Schmickler Review office leaderWP reviews and other reviews as deemed necessary - person needed Member ILC-CLIC WG convenersKey posts by Lebrun, Schulte, Peach, Linssen (Suggested by)(Approved by) CDR (later Project Implementation Plan to be started) Currently we have the CDR responsible Schmickler Linssen Safety for final projectsLebrun Schedule holder ( )Stapnes

Reviews Three main types (WP follow up, Critical items, Spending) : 6 monthly review (more or less required) Review of critical areas (as identified) Review before large spending on any item (more or less required) – in most (all?) cases it can be made part of the 6 monthly updates above Review office leader set up with appropriate review team adapted to the purpose of review, reports in CLIC project meeting. In addition to the relevant technical responsible the reviews have to be closely monitored by the resource coordinator This is a time-consuming and demanding task …. can we find someone from the outside that can do it ? This would be a key task where a person from outside could make key contribution. We will also need an external Advisory Body (ACE++) but this is a different matter

Meetings 6 monthly CB board preceded by WPs cycle of updates Overall Project Meetings Wed 1.6, Fri 8.7, Fri 2.9, Fri or 28.10, Fri 9.12 covering: – General news and issues (minutes, action, critical issue list, report on reviews), special reports if applicable (45 min) – Then RF issues, Technical issues, Beam-dynamics, CTF3 etc.. average 45 min per activity (3 hours) – Detector and physics news/key issues (30 min) – Around the areas – i.e. all parts of the machine (30 min) – Wrap up, next meeting and AOB (30 min) – in – can we make it shorter? Keep Friday CLIC meetings for topical presentations/seminars Keep weekly CASC, let CSC meetings follow Proj. Meeting schedule (every 6 to 8 weeks) Activity area meetings (move as much as possible to Project Meetings) – need to revisited WP/working group meetings will adapt (many will continue) in the second half of this year

CSC and CB Assuming we keep two CB meetings per year - some main roles are: – Discuss and make policy decisions concerning strategic issues (e.g. input to LC organization and relations with such organizations, staging scenarios, etc) – here the timing is not so easy – Discuss results of the WPs reviews including status of all FA contributions, agree on actions for follow up as appropriate – consider a major role in the future for the CB – Resource situation, monitoring and follow up as needed – Advisory group reports – Elect Spokesperson and CB chair – maybe other functions – Decide on collaboration issues, new members, policies for publications, etc.. All topics prepared by CSC (and CASC, DPCS) and Review Office so in practice there has to be clear recommendations from “the executive branch” concerning decisions, follow up needed, actions – and only major ones need a CB decision

Collaboration participation Currently planning has focus on WPs and work needed the coming years – how can we make it easier for the collaboration to participate: – Adapt meeting schedule to make it possible for people outside CERN to more easily participate (proj. meetings, CSC, detector SC probably all ok, for CASC still difficult but not impossible to run on WEBEX) – Attempt to use “outside” CERN wherever possible, and also look more into Proj. Associate possibilities in cases where heavy CERN presence is needed – Focus CB more on feedback on WPs to collaboration The “political role” of the CB, and role of Spokesperson versus the CERN Linear Collider Study Leader need to clarified too: – Develop next year taking into account LC general changes and in preparation for next SP election Some possibilities/options that we need to decide on: – Have Coll. Spokesperson external to CERN as a rule – Review leader likewise – Consider how we organise the CLIC input to the overall LC collaboration – Can we develop better regional structure and representation (for example deputies to Spokesperson from other regions) ?

Summary WPs for being worked out addressing key objectives for the period Introduce overall Proj. meeting and two new cycles: 6 month CB with focus on WP follow up, and 6-8 Proj. Meeting (open) per year Change roughly 50% of CSC and CASC – but still CERN dominated beyond what is numerically reasonable Will introduce Detector Physics SC (DPSC) and develop also workplan for detector work towards 2016 after volume 2 Adapt other meetings at work-package and working group level Still too much CERN dominated – need more key external persons (review leader, physics and more in the detectors/physics area) More changes needed for collaboration but move slightly slower (LC general changes clearer by end 2011/early 2012 and current SP period ends Feb 2013) – this has less impact on the execution of the programme