DNP/UCAIug Joint Meeting 2011 Greetings – Erich Gunther, Enernex – UCAIug Board Chair UCAIug Update – Kay Clinard, UCAIug President CIMug Update – Greg.

Slides:



Advertisements
Similar presentations
Join Us Now at: Enabling Interoperability for the Utility Enterprise And TESTING.
Advertisements

SG-Systems Boot Camp Use Case Process with TOGAF AMI-ENT Example Kay Stefferud Chair, SG-Systems Use Cases For more information visit:
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
UCAIug HAN SRS v2.0 Summary August 12, Scope of HAN SRS in the NIST conceptual model.
May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 03/07/11.
Draft February 2010 OpenHAN TFSlide 1 Submission Title: OpenSG San Francisco Opening Report Date Submitted: February xx, 2010 Source: OpenHAN Task.
September 30, 2011 OASIS Open Smart Grid Reference Model: Standards Landscape Analysis.
Slide 1 UCAIug OpenSG OpenADE Automated Data Exchange Requirements NAESB ESPI Energy Services Provider Interface Standard Specification Overview November.
Submission May 2010 Don Sturek, PG&ESlide 1 Submission Title: [OpenSG Washington DC Opening Report] Date Submitted: [May 4th, 2010] Source: [Don Sturek]
Open Smart Grid Subcommittee Organization and Overview Erich W. Gunther UCAIug Board Member.
© 2010 EnerNex Corporation. All Rights Reserved. CIM Test Development Process EPRI Project January 2011.
# 1 Information Exchange Standards Development Collaboration for AMI and HAN For further information, contact: Wayne Longcore
EPRI Smart Grid Demonstration and CIM Standards Development
UCA International Users Group The Quality Assurance Program prepared by the UCA ® International Users Group Testing Subcommittee UPDATED: 28 July 2008.
Business Technology Solutions B usiness T echnology S olutions Smart Grid Program Consumers Energy’s focus on Using and Enhancing Industry Standards.
1 Accelerating Standards for the Smart Grid David Wollman National Institute of Standards and Technology
Join Us Now at: Enabling Interoperability for the Utility Enterprise And TESTING.
Herbert Falk UCA IOP Group Meeting April 1, 2011 UCA Paris 2011 IOP Results Report ©2011 UCAIug Paris 2011 IOP Results - IEC UCAIug Pv1 1.
IPRM Overview Zahra Makoui SG Conformity Vice Chair March 2011 Source: SGIP SGTCC
B usiness T echnology S olutions AMI – Advanced Metering Infrastructure Consumers Energy Mark Ortiz March 9, 2011.
Working Group Summaries Genval, Belgium May 14, 2009.
SGTCC END TO END TESTING INITIATIVE APEC-ISGAN Smart Grid Test Bed Network Workshop Washington, DC -- January 24, 2012 Rik Drummond, Dean Prochaska, Rudi.
November 9-10, 2009 UCA IUG Testing Subcommittee Report Testing Subcommittee Report UCAI Users Group Meeting Charlotte, Nc, USA November 9-10, 2009 Bruce.
John McDonald 05 November 2013 SGIP Members Meeting.
Interoperability Tests for IEC Scott Neumann November 12, 2009.
McLean VA, May 3, 2010 SG Systems Systems Requirements Specification Approach Overview.
Common Information Model and EPRI Smart Grid Research
EDISON INTERNATIONAL® SM SCE Project Story CIM User Group 10/12/2010 Jim Horstman Southern California Edison.
1 OpenADR Taskforce Chair – Albert Chiu Co-chair – Ed Koch Technical Editors – Bruce Bartell, Gerald Gray.
Open Smart Grid Subcommittee Organization and Overview Erich W. Gunther UCAIug Board Member.
Systems Integration Specialists Company, Inc. The Standards Based Integration Company © Copyright 2010 SISCO, Inc. 1 Introduction to SISCO For CIM Users.
OpenSG Closing Plenary Knoxville February, UCAIug IPR Policy UCAIug Public or Private Documents may or may not contain the information included.
OpenSG Conformity IPRM Overview July 20, ITCA goals under the IPRM at a high level and in outline form these include: Organize the Test and Certification.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All SMART GRID ICT: SECURITY, INTEROPERABILITY & NEXT STEPS John O’Neill, Senior Project Manager CSA.
UCAIug Annual Meeting 2009 November 9 th – 10 th, 2009 EPRI Office Charlotte, NC.
Project CIM Test Development Process Author Name John Simmins Weekly Status and Planning Meeting 1/25/2011.
Use Cases for TC57 and for other TCs… Eric Lambert EDF R&D CIM User group PRAGUES 2011.
OpenSG Status UCAIug Members Meeting Chris Knudsen – Chair Gary Stuebing – Vice-Chair November 9 th, 2009.
Smart Grid Interoperability Panel & ISO / RTO Council Smart Grid Projects David Forfia SGIP Governing Board Member – Stakeholder Category 21 ISO/RTO Sponsor.
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
© 2011 EnerNex. All Rights Reserved. UCAIug Testing Subcommittee Activities.
© 2010 EnerNex Corporation. All Rights Reserved. CIM Test Development Process EPRI Project January 2011.
25 August UCA International Users Group Testing Quality Assurance Program Funding Issues 25 August 2010/ Updated 12 October 2010 Jack Robinson,
Draft Proposal of UCA Iug Presence at CIGRE 2012
TC 57 PSCE09 - CIM Status Update Panel Session Introduction Ed Dobrowolski, NERC.
WG Summaries Austin, TX October 24, Process WG Co-chairs: Terry Saxton & Ed Dobrowolski Scope: Overall management of the CIMug Development and tuning.
IEC TC57 Smart Grid Activities Scott Neumann USNC TA IEC TC57 November 6, 2009.
Boot Camp - Conformity July 19, 2010 Detroit, USA.
Erich W. Gunther UtilityAMI Chairman/Facilitator Chairman/CTO – EnerNex Corporation Jerry Melcher Onsite facilitator for this meeting.
Overview AMI-Enterprise For further information, contact: Wayne Longcore Chair of AMI-Enterprise Task Force, Board Of Directors.
CIM Test Development Process John Simmins Weekly Status and Planning Meeting 3/15/2011.
SG-Systems Working Group Status: Active, meet once at each face-to-face meeting Charter: The SG-Systems Working Group defines requirements, policies, and.
Working Group Summaries Charlotte, NC November 12, 2009.
Open Smart Grid (OpenSG) Technical Committee Plenary October 20, 2009.
OpenSG SG Conformity – Security Conformity July 22, 2010 Bobby Brown.
“SG-Systems” ( Smart Grid – Operational Applications Integration ) Charter & Status Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
© 2010 EnerNex Corporation. All Rights Reserved. SGIP TCC / OSG Cooperation Presented By: Erich Gunther EnerNex Corporation 2010.
Project CIM Test Development Process John Simmins Project Overview 1/27/2011.
May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 11/1/2010.
Open SG and SG-Systems Overview for IEC TC57 Working Groups For further information, contact: Greg Robinson Convener of IEC.
February 2010 OpenHAN TFSlide 1 Submission Title: OpenSG San Francisco Opening Report Date Submitted: February xx, 2010 Source: OpenHAN Task Force Re:
Draft February 2010 OpenHAN TFSlide 1 Submission Title: OpenSG San Francisco Opening Report Date Submitted: February xx, 2010 Source: OpenHAN Task.
Testing Technical Committee Paris, France August 24, 2010
CIM Test Development Process
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Brent Hodges, Chair, SG-Systems Greg Robinson, Co-Chair, SG-Systems.
“SG-Systems” (Smart Grid – Operational Applications Integration) Charter & Status Brent Hodges, Chair, SG-Systems Greg Robinson, Co-Chair, SG-Systems.
Frances Cleveland Convenor WG15
IEC TC57 Smart Grid Activities
Boot Camp - Conformity March 7, 2011 SF Bay Area.
DNP/UCAIug Joint Meeting 2011
Presentation transcript:

DNP/UCAIug Joint Meeting 2011 Greetings – Erich Gunther, Enernex – UCAIug Board Chair UCAIug Update – Kay Clinard, UCAIug President CIMug Update – Greg Robinson, Xtensible IEC61850ug Update – Christoph Brunner, it4power OSGug Update – Erich Gunther, Enernex Testing Update – Bruce Muschlitz, Enernex UCAIug IOP 2011 – Herb Falk, SISCO

Update on Organizational Issues OSGug has just completed elections for two open TC seats…Marty Burns, and John Simmins are the two new members EC has just completed elections for three open seats for OSG representation…Aaron Snyder, Gary Stubbing, Klaus Bender are the three new members Will be seeking nominations for three more EC members.

UCAIug 2011 Plan 2011 we will focus on member recruitment – Being in contact with existing members – Customer Satisfaction Survey – Revising membership structure – Tightening document access – Increasing meeting costs for non-members – Complete IPR and put in place

UCAIug 2011 Plan, cont.. Last year we started acquiring equipment required for meeting support…projectors, phones, room sound systems. For 2011 the goal is to: – Streamline meeting planning process – Minimize charges where possible – Use hotel staff to install and manage UCAIug supplied equipment – Use additional technical support where needed for A/V.

UCAIug 2011 Plan, cont… 2011 Daily Operations – Continuing support of SGIP – Identify tasks that where additional/other resources can be used – Use proceeds from Meetings to pay for additional resources as available – Streamline credit card collections accounting process Now Using PayPal for all cards Automating Data Collection & Reporting – Meeting registration process Now using RegOnLine…evaluate using Cvent

UCAIug Budget

Where the Budget Goes Projected Expense Professional Fees$17,500 Customer Relations$8,000 Web Presence$98,200 Marketing$24,000 Meetings$315,988 Testing Committee$90,000 Expansion Plan to Establish Utiliy Forum$30,000 Daily Operations$235,930 Bank and Credit Card Fees$15,400 Total Projected Proposed Budget Expenditures$835,018 Projected 2009 Income Less Expenditures$30,382 Balance brought forward from 2010 operations-$30,000 Projected Balance at end of 2011 operations$382

CIMUG UPDATE Greg Robinson, Xtensible Solutions

IEC update Christoph Brunner

New parts Domain specific object models – IEC , Ed 2: Basic communication structure – Compatible logical node classes and data object classes – IEC : Hydroelectric power plants – Communication for monitoring and control – IEC : Communications Systems for Distributed Energy Resources (DER)

Documents in preparation IEC – Use of the basic elements of IEC models IEC – Use of logical nodes to model the functions of a substation automation system IEC – Use of logical nodes to model the functions of a hydro power plant

Mappings for gateways IEC – Guideline to exchange information from a CDC based data model using IEC / -104 IEEE – Exchanging Information between networks Implementing IEC and IEEE1815 (DNP3) – Intended to become a IEC dual logo standard (IEC ) DNP Master DNP Outstation IEC Client IEC Device Gateway

How to address new areas? Prepare technical reports "how to use IEC for... " Technical reports describing – The use cases considered – The impact on the communication – The impact on the modeling – The impact on the engineering Results will be used to update the standards (Amendment / new Edition)

WG10 technical reports IEC : Using IEC for communication between substations (published) IEC : Using IEC for communication between substations and control center IEC : Using IEC for condition monitoring IEC : Network engineering guidelines IEC : Using IEC to transmit synchrophasor information according to IEEE C37.118

WG17 technical reports IEC : Using IEC for distribution automation IEC : IEC object models for photovoltaic, storage and other DER inverters IEC : IEC object models for electrical vehicles IEC : IEC object models for battery storage systems  Provide a "fast track" for urgently needed models for SmartGrid applications  Supported by the name space concept of IEC 61850

Other activities Develop methodologies for testing of functions in IEC based systems Define aspects of modeling distributed logic Prepare UML model of IEC Prepare webbased access to IEC models

Status Edition 2 Published: Parts 6, 7-2, 7-3, 7-4 FDIS: Parts 4, 7-1, 8-1, 9-2 CDV: Part 5, 10 CD: Part 3 Circulated as DC – in preparation for DTR: Part 1 Withdrawn: Part 9-1

2010 OpenSG WG Specific Objectives SG Simulation – NEW for 2010! – Establish WG, chairman, charter SG Systems OpenADR Build CIM into OpenADR specifications Harmonize OpenADR with other TFs (OpenHAN, OpenADE, Conformance, etc.) OpenADE OpenADE 1.0 SRS: February 2010 OpenADE 2.0: User Requirements Q OpenADE 2.0: System Requirements / Service Definitions Q OpenHAN OpenHAN 2.0 SRS ratified by OpenSG SG Communications Finalize the PAP 2 Task 1 and 3 OpenSG Interim Report #2 Meet with NIST and IEEE 802 to begin work on PAP 2 Task 4 (mapping of OpenSG application requirements to the inventory of wireless standards) Agree to high level statement on Network Interoperability Scope and Charter and begin work SG Conformance Agree upon (simple) definitions for Conformance and Interoperability and “Abstract Test Cases” and “Concrete Test Cases” Agree upon a language (framework, taxomomy) upon which to build abstract test cases Edge Conformance Complete Certification Process Reference Manual SG Security Establish coordinated support for other OpenSG working groups & task forces Revise the AMI Security Profile Address additional security profiles as produced by ASAP-SG

Next Meeting South San Francisco – Embassy Suites SFO March 7: OpenSG Boot Camp Sessions March 8 – 10: User Group General and Work Group Sessions

UCA TESTING PAST, PRESENT, AND FUTURE UCAI MEETING SAN DIEGO, CA FEBRUARY 1, 2011 Bruce Muschlitz Committee co-chair February 1, 2010UCA IUG Testing Past, Present, and Future

February 1, 2010 UCA IUG Testing Past, Present, and Future 22 Testing Committee Background Group created during UCA IUG creation Began work 2005 Technical Tasks Test Procedures Quality Assurance Program Tester Accreditation Administrative Tasks Maintain Conformance Certificates Maintain testing documents

February 1, 2010 UCA IUG Testing Past, Present, and Future 23 Testing Subcommittee Charter Single point focus for UCA IUG Arbitrates technical issues Coordinates groups within UCA Testing Open Smart Grid Conformity CIM Interoperability Requires utility rep as co-chair Now technically in violation (volunteers?)

February 1, 2010 UCA IUG Testing Past, Present, and Future 24 NIST SmartGrid Developments NIST is an international collaboration Smart Grid Interoperability Panel SG Testing and Certification Committee InterOp Process Reference Manual Best practices InterOp Testing and Certification Authority Mandates CB adhere to ISO/IEC Guide 65 Mandates Tester adhere to ISO/IEC NIST needs organization(s) to pilot IPRM

February 1, 2010 UCA IUG Testing Past, Present, and Future 25 UCA Pilot of NIST IPRM UCA has volunteered to pilot IPRM UCA procedures almost meet IPRM UCA status will be improved Some changes needed: UCAS and testers UCA to become Guide 65 Certification Body UCA must adopt formal quality management sys UCA will issue (sign off on) certificates Testers to become certified/compliant Tester will not have final say on certificate issue UCA will review the “tester file” before cert issued

February 1, 2010 UCA IUG Testing Past, Present, and Future 26 UCA Pilot of NIST IPRM (cont.) 2011 is transition year for IPRM User Group need to declare ITCA intent Lack of progress nullifies that declaration Changes needed Create quality manual for UCA testing Have testers upgrade > Remove tester authority to issue certificates Significant per-test UCA work(review all tests) Testing fees might be considered

February 1, 2010 UCA IUG Testing Past, Present, and Future 27 Questions ?

Systems Integration Specialists Company, Inc. The Standards Based Integration Company © Copyright 2011 SISCO, Inc. 28 Report on UCA User Group IOPs 2011

© Copyright 2011 SISCO, Inc. 29 What’s being tested UCA IEC 61850CIM

© Copyright 2011 SISCO, Inc. 30 Rules of engagement IOPs are closed except to: Participants Witnesses Each IOP team develops their own use cases, test procedures, and expected results. Testing will occur in a distributed or centralized fashion and will be closed to team members only (week of March 28 th ). Test reports will be generated by each team and made available to UCA User Group members.

© Copyright 2011 SISCO, Inc Tests GOOSESV SCL (CID and SCD) Client/Server Infrastructure

© Copyright 2011 SISCO, Inc. 32 Witnesses EDF eRDF KEMA Prosoft Red Electrica de Espanma

© Copyright 2011 SISCO, Inc Infrastructure Test objectives: To test Rapid Spanning Tree Protocol (RSTP) as a recovery mechanism for Ethernet within a substation. Test will include performance as well as interoperability. Test Participants: Hirschmann RuggedCom Siemens Schweitzer Engineering Laboratories ZIV

© Copyright 2011 SISCO, Inc IOP – SV Testing PublishersSubscribers AlstomSELBoth SEL RTDS

© Copyright 2011 SISCO, Inc. 35 IEC Client/Server Tests Purpose: To test Reads, Direct Control, un-buffered reporting, buffered reporting, and COMTRADE file transfer. Participant Matrix: One more participant may be joining.

© Copyright 2011 SISCO, Inc. 36 IEC – GOOSE Testing Test purpose: Interoperability of DataSet member types.

© Copyright 2011 SISCO, Inc. 37 CIM Testing CIM IEC Part 4 and 13 TopologyEquipmentAssetsGIS IEC Part 3Part 9Middleware

© Copyright 2011 SISCO, Inc – Part 4 & Part 13 Test objectives: To test the exchange of full and incremental network models that contain sufficient information to allow a DMS to produce a Power Flow. Test will include interoperability of multiple systems including GIS and DMS systems from several vendors. Test Participants: GE Telvent Siemens EDF EPRI Alstom ABB TIBCO SISCO

© Copyright 2011 SISCO, Inc. 39 Witnesses Oncor SunGard Tenet ERDF

© Copyright 2011 SISCO, Inc – Part 3 Test objectives: To test the exchange of an Outage Notification message between an OMS and other Backoffice Systems. Test will include interoperability of multiple systems including OMS, AMI and MDM systems from several vendors. Test Participants: GE Telvent Grid-Net Siemens Alstom AEP Consumers Energy TIBCO Oracle

© Copyright 2011 SISCO, Inc. 41 Witnesses Oncor SunGard Tenet AEP Consumers Energy

© Copyright 2011 SISCO, Inc – Part 9 Test objectives: To test the exchange of at least 7 Meter Reading and Control messages between metering systems and other Backoffice Systems. Test will include interoperability of multiple systems including AMI, MDM, OMS systems from several vendors. Messages that will be Tested: Meter Readings EndDeviceEvents EndDeviceControls PanDeviceEvents PanDeviceControls PanDeviceAssets MeterAssetConfig CoincidentMeterReadings

© Copyright 2011 SISCO, Inc – Part 9 Test Participants: GE Telvent Grid-Net Ecologic Analytics Landis & Gyr AEP Consumers Energy TIBCO Oracle eMeter Elster Aclara Itron UISOL

© Copyright 2011 SISCO, Inc. 44 Witnesses Oncor SunGard Tenet AEP Consumers Energy Kema EDF

© Copyright 2011 SISCO, Inc. 45 Middleware/Integration Tests Tests will include the use of Web Services and JMS Topics and Queues Integration patterns will include those found in and Middleware Vendors include: TIBCO IBM WebSphere Oracle WebLogic

Questions ?