Lightweight 2-kW Diesel-Powered Electric Generator 2005 Joint Service Power Expo May 3, 2005 Tampa, FL Presented by Greg Cole Photo taken by Army CECOM.

Slides:



Advertisements
Similar presentations
Unit C: Agricultural Power Systems
Advertisements

The Physics of Hybrid Vehicles. J. Russell Lemon
Engine Cirrus SR22 12/23/03. General Powered by a Teledyne Continental IO-550-N engine –Six cylinder –Normally aspirated –Fuel injected –310 horsepower.
Small Engine Fundamentals
Siemens Building Technologies Building Technologies Variable Frequency Drives Harmonics Overview.
ADX 150 – Engine Repair ADX 170 – Climate Controls
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
What is a fastener? A device to locate or hold parts
Morgan City Rentals Diesel Jet Pump 6 x 6 Peerless Safe Operating Practices and Procedures.
GENERATOR CHARACTERISTICS AND CAPABILITIES
Variable Frequency Drives VFD Basics
By Vance Bloom. Q. What is the function of a spark plug and why is it a vital engine component? A. The function of the spark plug is to introduce the.
Interest Approach Identify the major systems of an engine.
DEWATERING PUMP.
CCAS 3381 AUTOMOTIVE SKILL I ENGINE SUBSYSTEMS. OBJECTIVES To understand the operational principles and basic mechanisms of engine sub-systems Lecture.
Engine Systems and Components
Internal Combustion Engines. Engines External combustion engine Internal combustion engine Steam engine Gas turbine engine Steam engine Gas turbine engine.
Chapter 33 Charging System Fundamentals.
1 Introducing Energy-saving Hydraulic Units March 2006 Fujikoshi Corporation For publication.
Lightweight 2 kW Diesel-Powered, Electric Generator Tri-Service Power Expo July 16, 2003 Norfolk, VA Presented by Greg Cole.
How Motors Operate Presented by John Freeland
Automotive Wave forms.
Charging System Fundamentals
© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only Publisher The Goodheart-Willcox Co., Inc. Tinley Park, Illinois.
Piston Engine Operations
Battery Principles.
Diodes Analog Electronics UNIT III. Diodes UNIT I Objective The student will use diodes, capacitors, regulators and LEDs through a rectifying system in.
Ian Frank Matt Walter Jesse Steiner Luke Spencer Mike Celentano Nick Balducci Team Lead Chief Engineer Electrical Engineer Industrial Engineer Electrical.
1 Joint Service Power Expo May 2005 Marine Corps On-Board Vehicle Power.
Cost-Effective Hundred-Year Life for Single-Phase Inverters and Rectifiers in Solar and LED Lighting Applications through Port-Based Ripple Management.
D-STAR Engineering Corporation, All Rights Reserved Approved for Public Release, Distribution Unlimited Logistics-Fueled, Man-Portable Generator.
Motor Start Theory ME00107A.
Lesson 9: Electrical Components
General Troubleshooting Tips.
CHAPTER 18 Power Supplies. Objectives Describe and Analyze: Power Supply Systems Regulation Buck & Boost Regulators Flyback Regulators Off-Line Power.
Gas Turbine Theory and Construction
Settings & Adjustments. Settings & Adjustments.
Emergency Backup Motor for Sea Boats Presenred by: Fawwaz Al Shammari Yousef Naqi Khalid Al Shammari Reported to: Prof. Omer Farook May 8 th, 2012.
MonsonPeer Review – 5 December 2014 SPP/FIELDS LNPS PEER REVIEW Steven Monson University of Minnesota 1.
Variable Frequency Drives and Irrigation Pumps Stefanie Aschmann Bozeman, MT 11/30/11 1.
Delivering Innovative Solutions Sun Power Technologies is committed to developing innovative, integrated power electronics solutions for the markets that.
Tempest Blower SECTION: Tools and Equipment ISSUED: REVISED: ##-####
Power Factor Improvement Lecture 9. Normally, the power factor of the whole load on a large generating station is in the region of 0·8 to 0·9. However,
Capacitive transducer. We know that : C=kЄ° (A/d) Where : K=dielectric constant Є° =8.854 *10^-12 D=distance between the plates A=the area over lapping.
1 Agricultural Power Systems Identifying Engine Systems and Their Components.
Aaron’s Engine Anatomy
Automotive Wave forms. Oscilloscope's An oscilloscope can be a priceless price of test equipment used for observation of electrical/electronic wave patterns.
ABL-14d Able Elective Engines Instructors: George Crowl.
Variable Speed Applied to Pumps. Life Cycle Costs - Courtesy of Hydraulic Institute and Europump Initial cost is not the only cost associated with a pump.
Phoenix Convention Center Phoenix, Arizona Integrated Assessment for Smart Power Infrastructure Demonstration for Energy Reliability and Security (SPIDERS)
PRESENTATION ON CAMLESS ENGINE
Electricity Power/Energy Basics: In US household electricity is 120 volts AC – 60 cycles (therefore most appliances and electronic equipment require this.
Power Electronics and Switch Mode Power Supply
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
TYPE “HOS” 6” Stroke Compressor & Ancillary Equipment
Power supply.
ENERGY CONSERVATION IN MOTOR SYSTEMS. Introduction 2.
Three-Phase AC machines
IDENTIFY THE MAJOR SYSTEMS OF AN ENGINE!. NEXT GENERATION SCIENCE/COMMON CORE STANDARDS ADDRESSED! CCSS.ELA Literacy.RST.9‐ 10.3 Follow precisely a complex.
Hybrid Electric Vehicles
Gas Turbine Power Plant
From Lecture1 vi , ii vo , io Power Processor Controller Source Load
Exhaust, Electrical, and Ignition.
Three-Phase AC machines
UNIT INJECTOR SYSTEM.
2005 Joint Service Power Expo Vehicle Export Power (MEP-STD-001)
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
Introduction to Motor Drives
Presentation transcript:

Lightweight 2-kW Diesel-Powered Electric Generator 2005 Joint Service Power Expo May 3, 2005 Tampa, FL Presented by Greg Cole Photo taken by Army CECOM

Mainstream Generator History r Engine Development (1991- ) –Customer: U.S. Army RD&E Center (Natick) –Application: Small, diesel-powered, personal cooling system r Alternator Development ( ) –Customer: U.S. Army Aberdeen / OST –Application: Miniature, multi-fueled generator r Results –Diesel-cycle is better than Rankine, Stirling, Brayton, and converted spark ignition (gasoline) –Mainstream designs and produces integrated, custom machines

2-kW Generator Requirements r Customer: Marine Corps System Command (MCSC) r Application: Team Portable Collection System (TPCS) r Project Philosophy: Commercial hardware, not Mil-Spec hardware r Goals: –Power is expected to exceed 1 28 VDC –Desired weight is less than 50 lbs –Desired fuel is diesel

2-kW, 28-VDC Generator Evolution r Phase I – MCSC –Initial demonstration –1.6-kW Generator: 42-lbs unmounted (14” x 11” x 16”) r Phase II – MCSC –Revised prototypes –2-kW Generator: 48-lbs unmounted –2-kW Generator: 65-lbs backpack mounted (18” x 17” x 20”) r Phase III – ONR –Two test units delivered to Army CECOM –2-kW Generator: 80-lbs roll cage mounted (18” x 18” x 20”) r Phase III – MCSC –Additional test units similar to ONR units –Addresses issues identified during Army CECOM tests

Mainstream’s Generators r Integrated system designed for military applications –Alternator integrated into engine flywheel l resulting in a lighter system l no coupling – eliminates potential failure component l reduces component count and number of wear components –Air-cooling fan integrated into engine flywheel l cools power electronics, engine head, oil sump l runs cooler - increases life and reliability r Mainstream designed and fabricated engine and generator –Sized specifically for application –Not just packaging of commercial components

2003 Power Expo r Technology –Integrated machine –Light-alloy engine r Product –2-kW, 28-VDC Unmounted Generator – 48 lbs (14”x11”x16”) –2-kW, 28-VDC Backpack Generator – 65 lbs (18”x17”x20”) r Test Results –Performance tests at Mainstream (Voltage, Fuel, Noise, etc.) –Life tests at Mainstream (1000+ hrs) –Field tests at Ft. Drum (U.S. Army 10th Mountain Division & U.S. Air Force 20th Air Support Operations Squadron) r Future Work –Magnesium engine block requires further development

MCSC Field Tests at Ft. Huachuca r Achievements –Generator #1 successfully tested from 12/8/03 through 12/12/03 r Issues –Vibration Mounts l Too much or too little stiffness l New mounts have been tested for hours –Decompression Lever l Lever on Generator #2 was over extended, damaged, and repaired l New design includes a stop for lever –Cover Plate Gasket l RTV seal on prototypes broke off internally and clogged fuel pump l Production generators have metal gasket

ONR Phase III Program r Mainstream delivered two 2-kW, 28-VDC generators r Program Goals: –Government tests to characterize equipment –Identify remaining issues that need to be addressed r Mainstream can provide a complete test report to government personnel upon request r Testing: –All tests performed by Army CECOM –All tests performed at Ft. Belvoir (Fall 2004) –All tests performed using JP-8 –Generators were tested as delivered, no voltage or speed adjustments were made

Voltage and Speed Adjustments r Tested Throttle r Loosen knob and rotate r “Voltages are difficult to adjust on this unit, and not something that will likely be attempted in the field by the user” – Army CECOM r Revised Throttle r Friction-plate design r Slide lever left-right r Easier access to oil gauge and plug Both Designs r PM Generator: voltage proportional to speed r Set screw for maximum setting

Army CECOM Laboratory Tests (per MIL-STD-705C) r Physical Characterization r Start and Stop Test (503.1) r Frequency and Voltage Regulation, Stability and, Transient Response (608.1) r Ripple Voltage (650.1) r Voltage Dip and Rise (619.2) r Fuel Consumption (670.1) r Sound Level (661.2) r Endurance (690.1) r Extreme Cold Start (701.1d) r High Temperature (710.1d)

Physical Characterization 2-kW 28-VDC Mainstream Dry Weight80.2 lbs Wet Weight84.4 lbs Size18”x18”x19.8” 2-kW 28-VDC DoD MTG Wet Weight138 lbs Size29.5”x16”x21.8” Data provided by Army CECOM

Frequency and Voltage Regulation, Stability, and Transient Response Test RegulationStability (30 sec.) Voltage (max) 20.90%6.60% FrequencyN/A Failed CECOM Req. 4%2% r Mainstream generator was never designed to provide voltage regulation r MCSC Spec. (20-32 VDC) r CECOM Measured (31-37 VDC) r “Most DC-AC inverters require a voltage range from VDC...” - Army CECOM r Mainstream redesigning alternator to produce same power, lower voltage (unregulated) r Voltage regulated machine with feedback can be designed Data provided by Army CECOM

Ripple Voltage Test r Ripple is amplitude of the alternating component of the DC voltage r Lower ripple is better r “Ripple Voltage leads to EMI, the higher the ripple the worse the EMI” – Army CECOM r “Bad Ripple Voltage can “fatigue” some electronics components (capacitors, transistors)” – Army CECOM r “Some fast acting switches can be damaged by bad ripple voltage.” – Army CECOM Percent Load 100% Ripple Voltage 2.63 Percent Ripple 9.4% Failed CECOM Req. 5.5% Data provided by Army CECOM

Resolution of Ripple Voltage Issue r MCSC did not specify ripple voltage or EMI r MCSC goal was to minimize weight r Mainstream has added a commercial capacitor to reduce ripple voltage –1.4” dia. x 2.8” long –0.16 lbs –fits in existing enclosure –no cost impact –ripple valleys minimized resulting in mean voltage increase and power increase No Capacitor With Capacitor Percent Load 100% Ripple Voltage Percent Ripple 9.4%2.9% FailedPassed CECOM Req. 5.5%

Voltage Dip and Rise Test Volts Dropped Volts Gained DipRiseTransient Recovery Time Results (max) %22.0%0/0 Passed CECOM Requirement30% 3/3 Data provided by Army CECOM

Fuel Consumption Test Load (W)% RatedFuel lbs/hrFuel Gal/hr 00% % % % % Passed 2-kW MTG at 100% Load0.330* * “ The Power Generation Branch has numbers showing some MTGs to use only 0.26 gal/hr of JP8 at full load. The 0.33 is a fleet maximum.” – Army CECOM Data provided by Army CECOM

Sound Level Test r Generator tested by Army CECOM had same muffler as that used on the 2-kW MTG r Mainstream has developed a new muffler. Tests indicate that noise can be reduced by 3 dB Data provided by Army CECOM

Endurance Test r Due to limited time and budget, “conventional” 1000 hr test shortened to 150 hrs r Tested 8 hrs per day r “The unit did not have any critical failures throughout the test. The system was successfully started and operated throughout the entire 150 hours.” - Army CECOM r Passed LoadHours 50%36 0%6 75%36 25%36 100%36 Data provided by Army CECOM

Endurance Test – Human Factors Comments IssueMainstream Remark “The system is very difficult to start at low temperatures.” - Army CECOM Electric starter is being added, see Additional Development Slide “The system can be cumbersome to turn off after long hours of operation.” - Army CECOM Throttle has changed. “The exhaust is located aimed directly at the operator as he/she approaches the control panel.” - Army CECOM Exhaust direction has changed with new muffler. “The location of the oil fill port is very difficult to get to, especially while wearing gloves.” - Army CECOM Throttle plate has changed allowing easier access to oil fill port.

Extreme Cold Test r Every part of system (including fuel and oil) is cold soaked in an environmental chamber to a specified temperature for 24 hours. r The system is prepared for starting by adding lube oil to the engine head. r “Mainstream difficult to start below 37°F.” - Army CECOM r Mainstream generator was designed to start without any external power supply. r Electric starter is currently being developed.

High Temperature Test r Tests consisted of starting and operating the system at a specified temperature and ensuring that the system could stabilize without overheating. r “The system was able to stabilize at rated load for over two hours at 125°F.” - Army CECOM r “The system was not able to provide 110%.” - Army CECOM r Maximum throttle setting was not changed. Mainstream’s generator can provide 110%.

Mainstream’s Life Tests r Number of Generators Tested: 2 r Number of Hours Tested: hours each r Approximate number of starts / stops: 60 each r Load: variable ( W) r Number of Critical Failures: 0 r Number of Hurricanes Survived: 1

Additional Development r Electric Start –Integrated Alternator / Starter –In development with commercial electronics vendor r AC Power –Testing with commercial inverter r Cost Reduction –Scaling-up for production –Completing production fixtures and tooling

Summary r 28-kW 28-VDC diesel- powered electric generator r 80-lbs fully instrumented r 18” x 18” x 20” r 0.22 gph at 2 kW r Improvements –Throttle –Muffler –Vibration Mounts –Voltage Range (24-32 VDC) –Voltage Ripple (3%) –Human Factors

Contact Information r Company Address Mainstream Engineering Corp. 200 Yellow Place Rockledge, FL (321) r Points of Contact –Technical: Greg Cole, –Contracts: Michael Rizzo,