Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.

Slides:



Advertisements
Similar presentations
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Advertisements

Simultaneous PSTN and Broadband Provision Process Incorporating Broadband Movers Issue 5.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Q1 Results 2004/05 Welcome. Q1 Results 2004/05 BT Group plc Ben Verwaayen, CEO.
1G MSIL SFOA1 Trial Update Week Ending: 04 April 2008.
Title Consult 21 Mike Reed - Openreach Name 21 st February 2006.
For discussion purposes. No implementation assurances 1 Consult 21 Interconnect & Portfolio Working Group NGN Interconnect - PSTN Emulation Blended Rate.
Unit Slides by UK Versity.  Unit aims:  This unit aims to help the learner with an opportunity to develop their project management and research skills.
Western Financial Group Q Financial Results Conference Call August 18, 2009.
During a mains supply interruption the entire protected network is dependent on the integrity of the UPS battery as a secondary source of energy. A potential.
© Copyright Alvarion Ltd. Proprietary Information: NG-VG: Alvarion’s Networking and Voice Gateway May 2010.
Animated slides – showing jumpering changes and product architecture for WLR, LLU, SLU and GEA.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
MSO Access Network Alerts 17 th December Background  Objective – Update on the success of a pilot to identify Major Service Outages in the access.
Liquidity: statutory consultation on the ‘Secure and Promote’ licence condition Power Trading Forum Martin Bell 12/12/13.
© 2010 Plexent – All rights reserved. 1 Change –The addition, modification or removal of approved, supported or baselined CIs Request for Change –Record.
Change to presentation of financial results Phil Moses – Group Controller & Director of Investor Relations 23 January 2008.
AICT5 – eProject Project Planning for ICT. Process Centre receives Scenario Group Work Scenario on website in October Assessment Window Individual Work.
Shareholder Meeting May 7, 2013 Annual Meeting of Shareholders May 7, 2013.
For discussion purposes. No implementation assurances 1 Consult 21 Interconnect Working Group NGN Interconnect - PSTN Emulation Technical Consultation.
Going faster and staying in control - Building the world’s biggest NGN Tim Hubbard Head of Technology Futures.
Black Box Corporation Overview. Black Box Corporation 2 Forward-Looking Statements - Any forward-looking statements contained in this presentation are.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
© 2006 Avaya Inc. All rights reserved. Avaya Services Michael Dundon Business Development Manager.
How to do business guide. Fixed, Data and Hosted Solutions by Mandy Fazelynia Latest update – 11/11/2013 Operations Director.
Keys to Successful Beta Testing Presented by Ron Dinwiddie, Product Director, Blackboard Commerce Suite™ Jessica Finnefrock, Product Director, Blackboard.
Needham 11 th Annual Growth Conference January 6, 2009 NASDAQ: BBOX.
Title Slide – Option 1. Title Slide – Option 2 Insert Text.
The public information campaign to communicate about the process of migration to BT’s next generation network Version 11 – 24 September 2007 Information.
Anthony Stephens 21CN Customer Engagement 1 21CN High Level Consultation Plan The following plan provides a four month view of key consultation themes.
Consult21 IMWG Pre-Migration Scheduling Consultation Summary & Approach The purpose of this presentation is to share the summary and.
MIGRATION PROPOSAL: CONSULTATION FRAMEWORK Dave D’Arcy This Presentation provides a generic view of feedback received from Communications Providers during.
Equal Access: Space, Power & Common Infrastructure – LLU and 21C Gary Williamson Openreach LLU Business Improvement Manager January 2006 Queries to
Business unit (for internal use only) / url (for external use) Implementation & Migration Programme Plans This presentation covers: Consultation Plan –
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Director Industry Development Jo Upward FORWARD LOOKING STATEMENTS – CAUTION ADVISED Certain statements in this presentation are forward-looking and.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
21CN Legacy Interconnection Working Group 17 th December 2004 Auditorium City Place, Gatwick.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Western Financial Group Q Financial Results Conference Call November 16, 2009.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
BT announce their 21 st CN Plans Alastair Adamson ETUG Telecommunications Coordinator – 15/07/04 Does the Electricity Industry have any reason to be concerned?
Preparing for 21CN Migration Dawn Foley/ Bob Corner Customer Engagement The dates and other information about BT's 21CN programme in this presentation.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Consult 21 - TWG The Pathfinder Programme Keith Fowler 14 January 2005.
Project management Topic 1 Project management principles.
Implementation & Migration Working Group 18 th January 2006 Kevin Young Interconnect & Numbering Services The information in this presentation relates.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Key Performance Area (Optional) Performance Criteria Considerations 1. Major Concerns 2. Minor Concerns 3. Meeting Expectations 4. Exceeding Expectations.
Campus Network upgrade and Wi-Fi Rollout REVIEW AND PHASE 3 PROJECT MANAGER TASKS.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
1 DLE to NGS Migration: Contracts Clinic 24 th February 2006 The information in this presentation relates to plans currently under development and subject.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Pathfinder Working Group BT Centre Showcase, Registration: 9.45 am Start time: am.
Erik Blachford CEO, IAC Travel Pacific Crest Technology Forum August 10, 2004.
FOURTH QUARTER AND YEAR END 2012 RESULTS. The following is a Safe Harbor Statement under the Private Securities Litigation Reform Act of 1995: This press.
Terminal Splitters in a Cabinet December Terminal Splitters in a Cabinet The purpose of this presentation is to share our findings around the.
THIRD QUARTER 2012 RESULTS.  Year-over-year revenue growth of 5.5% to $32.0 million, at the high end range of guidance  Adjusted fully diluted EPS of.
Tim Wright BT’s 21st century network TRIS - TISPAN WG4 workshop on NGN Interconnection and Numbering Copenhagen 18 January CN Principal Consultant.
FOURTH QUARTER AND FULL YEAR 2013 RESULTS March 13, 2014.
BT’s 21st century network
Prepare For Your Next Prelude Upgrade
Sub-Loop Extension Service (SLES)
UK Link Technology Refresh
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
Xoserve IX Refresh Customer Update 12/02/2019.
THE SAFE HARBOR STATEMENT UNDER THE US PRIVATE
TITLE Business Case YOUR LOGO BUSINESS CASE PRESENTATION 00/00/0000
Presentation transcript:

Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject to change. 1 Mass Migration Methodology: Ray Lewis Queries to

Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject to change. 2 Forward Looking Statements – Caution Advised Certain statements in this presentation are forward-looking and are made in reliance on the safe harbour provisions of the US Private Securities Litigation Reform Act of These statements include, without limitation, those concerning: BT's plans for transformation of its networks; benefits to customers of the 21CN programme; key milestones and expected timetable for delivery of 21CN; and the benefits in relation to, for example interconnect, convergence and broadband. Although BT believes that the expectations reflected in these forward-looking statements are reasonable, it can give no assurance that these expectations will prove to have been correct. Because these statements involve risks and uncertainties, actual outcomes may differ materially from those expressed or implied by these forward-looking statements. Factors that could cause differences between actual outcomes and those implied by the forward-looking statements include, but are not limited to: material adverse changes in economic and financial markets conditions in the markets served by BT; supplier arrangements; future regulatory actions and conditions in BT’s operating areas; technological innovations; developments in the convergence of technologies and the anticipated benefits and advantages of new technologies, products and services, including broadband, not being realised.

Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject to change. 3 This presentation should be viewed in conjunction with the PSTNMass Migration Methodology Presentation presented at the IMWG on 15/11/05 by Alan Cameron (ref: SLOT 6 slides16 –23) This presentation is designed to inform Communication Providers of: 1.the migration activities which will be undertaken by BT including:  Pre-Transfer activities (identified as “Configure & Verify phase)  On the night Transfer activities  Post Transfer activities (identified as “Monitor” phase) 2.the impacts on End Customers of mass migration for PSTN VOICE SERVICES

Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject to change. 4 E-side MDF Pre-Transfer Pre-Transfer Activities Install, configure, cable & commission MSAN, 21CN Test Access Matrix (TAM), Test Heads & Comms Cable 21CN TAM to MDF & fit Transfer Connectivity Point (TCP) modules on E-side blocks TCP module installation checks 21CN Call Server & MSAN data build PSTN pre-transfer checks 21CN TAM PSTN CONC Customer lines OVPOVP OVPOVP OVPOVP Test Head POTS MSAN MDF D E 21CN TH PSTN DLE 21CN Voice

Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject to change. 5 Pre-Transfer Activities - Detail TCP installation  Install & Commission phase incorporates a 100% end to end test of all 21CN equipment.  Pre & Post TCP installation checks ( BAU / Non-intrusive)  5 pair module = Target 30 seconds customer outage  5 pair module includes Over Voltage Protection  Trials: 100 pair block = minute TCP installation PSTN Pre-Transfer Tests  Check connection from 21CN TAM to TCP (Existing line) Business as Usual test / Non-intrusive  Check Pre-build MSAN services Non-intrusive test Activity Freeze before Transfer  Aiming for maximum 12 hours

Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject to change. 6 E-side MDF Transfer in progress Transfer Activities Command & Control confirm transfer “Go/No Go” Disconnect PSTN concentrator & Switch 21CN TAM Sync with changeover from DLE to Call Server 21CN TAM PSTN CONC Customer lines OVPOVP OVPOVP OVPOVP MDF D E MSAN 21CN T/TH Test Head POTS PSTN DLE 21CN Voice

Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject to change. 7 Transfer Activities – detail Transfers will happen overnight in periods of low network activity but may be scheduled for any night of the week Transfer Go / No Go Decision  Various defined decision points along Transfer timeline  Final decision approximately 10pm Calls in Progress  Calls in progress will be lost, however, special measures to prevent disruption of 999 calls will be implemented PSTN Disconnection  Number of options under consideration Testing to determine most suitable to minimise service outages 21CN TAM Switching  21CN TAM suite (Max lines) = <10 seconds (Outgoing calls)  PSTN to 21CN re-routing = minutes (Incoming calls)  Alignment of both to minimise total service outage

Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject to change. 8 Transfer Activities - End User Experience Outgoing calls  Short break in dial tone during 21CN TAM switch  No service interruption announcement during switch Incoming Calls  Precise detail of service capability will become known upon completion of transfer engineering end to end trials phase.  Incoming call capability will be dependant upon size of number range and customer position within it. For those at the front of the number range restoration of service capability will be instant, for those further along the range, the duration will be longer.  A range of options are being considered as part of the transfer engineering solution to improve these timings.  Principle is to achieve the shortest service capability interruption possible Dial Tone  There will be no perceptible change in the dial tone heard by the end user once transfer has been completed.

Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject to change. 9 E-side MDF Post Transfer Post Transfer Activities Switch from PSTN Test Access to 21CN TAM Test Access Post transfer checks Monitor network for fallback period Decommission Redundant Equipment Hand-over to Operations 21CN TAM PSTN CONC Customer lines OVPOVP OVPOVP OVPOVP MDF D E MSAN Test Head POTS 21CN T/TH 21CN Voice PSTN DLE

Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject to change. 10 Post Transfer Activities - detail Post Transfer Checks  PSTN disconnection tests (Every Line)  MSAN connection (Non-intrusive) tests Review & Monitoring  Assess network performance against Fallback criteria (eg on the night test results / % faults)  7 day monitoring period Fault Reporting  Special measures will be in place for fault reporting for 7 day period.  Additional resource available to deal with any reports