Federal Aviation Administration Data Communications Implementation Team (DCIT) Departure Clearance Trials (DCL) Test Status DCIT Meeting # 22 Washington,

Slides:



Advertisements
Similar presentations
International Civil Aviation Organization
Advertisements

Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 20th MEETING OF WORKING.
A GLOBALink ARINC VDL Mode 2 AOA and ATN Program Status & Deployment Activities November, 2000 AMCPWGM1 WP23.
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
Federal Aviation Administration Data Communications Program DCIT Update MEM ATCT DCL Trials To:DCIT Plenary From: Matt Maki Date:
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
ATN 2002 London September 2002 Presented by Aloke Roy Authors: Christophe Hamel Tom Judd Ketan Nguyen Bryan Rowe Kevin Wohlers ATN AIRBORNE IMPLEMENTATION.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status / Overview DCIT #26 Plenary From: Matt Maki / DCL Trials Lead.
Federal Aviation Administration Data Communications Program DCL Trials DCIT Update MEM ATCT To:DCIT Plenary From: Matt Maki Date:
FAA Controller Pilot Data Link Communications Program ATN ‘99 London, England James H. Williams September 22, 1999.
Federal Aviation Administration Data Communications Implementation Team (DCIT) Trials Activities/DTAP Update Schedule Timelines Matt Maki.
ATN Subnetwork Implementation:
Federal Aviation Administration Data Communications Program DCL Trials DCIT Update MEM ATCT To:DCIT Plenary From: Matt Maki Date:
Federal Aviation Administration Data Communications Integration Team (DCIT) DCL Trials test activities Presented to:DCIT # 15 By:Peter Muraca FAA Date:May.
Presented to: DCIT #12 Plenary By: Andy Fry, Thane Inc. Date: January 12, 2012 Federal Aviation Administration Data Communications DCIT Update Flight Deck.
Data Link Communications
FANS-1/A and ATN Data Link: An Avionics Perspective Bob Kerr
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #25 Agenda 07/17-07/18/2013 Harris Corp – Washington, D.C.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT23 Update To:DCIT23 Plenary From: Matt Maki Date:
Federal Aviation Administration Data Comm 1 Federal Aviation Administration Key Site Timelines Hal Ludwig & Pete Muraca.
FAA Satellite Navigation – Status Briefing 1 Federal Aviation Administration January 5, 2007.
Presented to: DCIT FDWG Breakout Session By: Andy Fry, Thane Inc. Date: July 11, 2012 Federal Aviation Administration Data Communications DCIT #16 Flight.
Federal Aviation Administration Data Communications Program Operational Trials in Domestic Airspace Presented to:Data Comm Implementation Team (DCIT) By:Jerry.
Federal Aviation Administration Data Communications Program Departure Clearance (DCL) Trials DCIT17 To:DCIT Plenary From: Matt Maki, Trials Lead Date:
Federal Aviation Administration Data Comm 1 Federal Aviation Administration Key Site Timelines Hal Ludwig.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT25 Update To:DCIT25 Plenary From: Matt Maki Date:
BOEING is a trademark of Boeing Management Company. Copyright © 2011 Boeing. All rights reserved. OMWG and All Working Groups DCIT-39 report out 11 March.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #33 Agenda 6/4/2014 Harris – Washington, DC.
Presented to: By: Date: Federal Aviation Administration ADS-C CDP Climb/Descend Procedure Implementation Project Update IPACG/39 Keith Dutch, FAA 03 –
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #24 Agenda 06/12-06/13/2013 Boeing – Arlington, VA.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #21 Plenary 02/01/2013 To: DCIT By: Gregg Anderson.
Presented to: By: Date: Federal Aviation Administration DCIT 41 Plenary Mark Patterson, FAA, AFS June 2015 Flight Standards Update.
Presented to: Demonstrations and Prototypes TIM By: Steve Hodges Date: 05/04/2011 Federal Aviation Administration Aircraft Access to SWIM (AAtS) FY11 planned.
Presented to: By: Date: Federal Aviation Administration DCIT 40 Plenary Mark Patterson, FAA, AFS April 2015 Flight Standards Update.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT Meeting 08/24/2011.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #23 Plenary 05/09/2013 To: DCIT By: Gregg Anderson.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT Update To:DCIT Plenary From: Matt Maki Date:
Federal Aviation Administration Data Comm 1 Federal Aviation Administration Key Site Timelines Hal Ludwig.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status / Overview DCIT #27 Plenary From: Matt Maki / DCL Trials Lead.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT 37 Plenary Agenda December 10, 2014 Harris Corp Washington, DC.
GROUND-GROUND STRINGAIR-GROUND STRING AVIONICS CSP AOC DTAP NESG HADDS.
| 1 harris.com Matt Maki DCL Trials Lead DCL Trials Decommissioning Plan 29 Sep 2015.
Federal Aviation Administration Data Communications Program FAA Prototype & Validation Activities Presented to:Data Comm Implementation Team By:Craig Morris.
Federal Aviation Administration Data Communications Implementation Team (DCIT) Data Communications Implementation Team (DCIT) DCIT #31 PLENARY DCL Trials.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status Updates To:DCIT21 Plenary From: Matt Maki Date:
CIE ENGINEERING INC Federal Aviation Administration WJH Technical Center & Rockwell Collins VDL Mode 3 STC Testing 16 & 17 October, 2004 WJH Technical.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #9 Meeting 09/21/2011 To: DCIT By: Gregg Anderson.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCL Trials ”T e s t S t a t u s” Presented to:DCIT, Meeting #18 Presented.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #22 Plenary 03/14/2013 To: DCIT By: Gregg Anderson.
P. Muraca v0.4 Data Comm DCL Trials end to end system test.
P. Muraca v0.2 Data Comm DCL Trials end to end system test.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT24 Update To:DCIT24 Plenary From: Matt Maki Date:
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #25 Agenda 07/17-07/18/2013 Harris Corp – Washington, D.C.
LINK EEC Test Facility - ATN 2003 London 1 LINK Test Facility Overview Located at EEC Bretigny - France In support to LINK EATMP project.
Federal Aviation Administration Data Communications Implementation Team (DCIT) Data Communications Implementation Team (DCIT) DCIT #32 PLENARY DCL Trials.
DCIT Document Hierarchy End-to-End Procedures and operational system features effecting multiple organizations Systems Integration Document Detailed system.
Presented to: DCIT Flight Deck Working Group By: Andy Fry, Thane Inc. Date: October 12, 2011 Federal Aviation Administration Data Communications DCIT #10.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #12 Plenary 01/12/2011 To: DCIT By: Gregg Anderson.
Presented By: Peter Muraca FAA Technical Center Atlantic City, NJ USA
FAA Data Comm Program Status AERONAUTICAL COMMUNICATIONS PANEL (ACP)
International Civil Aviation Organization
Data Communications Implementation Team (DCIT)
Data Communications Implementation Team (DCIT)
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
Data Communications Implementation Team (DCIT)
Data Communications Program
Presentation transcript:

Federal Aviation Administration Data Communications Implementation Team (DCIT) Departure Clearance Trials (DCL) Test Status DCIT Meeting # 22 Washington, DC Presented to:D C I T By:Pete Muraca, FAA Date:March , 2013

2 Agenda Test Activity to Date –Boeing / Airbus Test Sessions –E-E Functional and Operational Testing –Environment –Avionics Assets MEM Schedule Milestones Schedule Highlights DCL Trials – Test Status DCIT #22 (March , 2013)

Federal Aviation Administration Test Activity to Date Latest Build 6 was delivered to WJHTC 3/4/13: Build 6 WJHTC Installation Complete: March 4 -Build 6 WJHTC Functional Testing: March Build 6 MEM Functional/Pre-SAT Testing: March Build 6 MEM Site Acceptance Test (SAT): March DCL Trials – Test Status DCIT #22 (March , 2013) 3

Federal Aviation Administration Boeing / AIRBUS Test Sessions Boeing Test Sessions: -Boeing Test Session dates – 2/27, 3/1, 3/5, 3/6, 3/7, 3/8 -Boeing Test Benches utilized – B737, B , B767, B777 AIRBUS Test Sessions: -Airbus Test Session dates – 2/28, 3/5, 3/7 -Airbus Test Benches utilized – A340, A380 Week of March 11, 2013 MEM pre-SAT testing -MEM DTAP env with Tech Center avionics -MEM DTAP env with UPS / AOC -MEM DTAP env with FedEx / AOC Week of March 11, 2013 MEM pre-SAT testing -MEM DTAP env with Tech Center avionics -MEM DTAP env with UPS / AOC -MEM DTAP env with FedEx / AOC MEM Pre-SAT Test Activities DCL Trials – Test Status DCIT #22 (March , 2013) 4

Federal Aviation Administration End to End Functional Testing DTAP Build 6 -Run system test cases with Tech Center bench avionics -Run system test cases with Boeing and Airbus labs (multiple flight deck configs) -Exercised test scenarios with DCIT aircraft -Conducted Regression testing Documented / Socialized Findings New PTRs Opened -118,120,122,124,125,126,127,128,133 Closed PTRs -88,93,100,101,102,103,104,105,106,118,125,124,126,127 DCL Trials – Test Status DCIT #22 (March , 2013) 5

DCL Trials – Test Status DCIT #22 (March , 2013) Functional and Operational Test Env. Lab Environment End to End Functional Testing End to End Operational Scenarios Testing (includes pilots & controller crew) FANS Avionics Platforms DCIT Aircraft (FedEx, United-Continental, UPS, Delta, AA, UsAir, Southwest) Site Acceptance Testing (Field Environment) Sub_set of Functional End to End Operational end to end scenarios FedEx Aircraft and AOC Participation  HADDS / FDIO connectivity and simulation capability  FNTB (via NESG) connectivity for external FAA communications  Ground/Ground and Air/Ground Communication service via ARINC  Ground/Ground and Air/Ground Communication service via SITA  Utilization of Boeing configurable flight deck  Utilization of Airbus configurable flight deck  Utilization of FAA Technical Center bench avionics  DCIT Aircraft Participation  Plans, Procedures and Personnel in place 6

DCL Trials – Test Status DCIT #22 (March , 2013) Avionics Assets (FANS) In-House CMU based FANS 1/A+ avionics end system – Connected to roof antenna representing a target aircraft Laptop based FANS 1/A+ avionics end system – Can be connected to real avionics hardware (A750 Radio, A739 MCDU, A758 CMU) via A429 card (FANS) External o Boeing Flight Deck (via subnetwork infrastructure and service (ARINC and SITA) o B737-ng o B777 o B o MD-11 o B787 o B767 o Airbus Flight Deck (via subnetwork infrastructure and service (ARINC and SITA) o A320 o A330 o A350 o A380 Note: Planning for Lab FMS integrated avionics solution (ATN Baseline 1 & SC-214 v. H) Rockwell Collins prototype Avionics (Real Hardware) Honeywell Avionics (Real Hardware) Thales Avionics (PC based) 7 (FANS) DCIT Aircraft o FedEx o UPS o Delta o United

Federal Aviation Administration MEM Schedule Milestones The Milestone Schedule Outlook: Build 6 WJHTC Installation Complete: March 4 -Build 6 WJHTC/MEM Functional/Pre-SAT Testing: March Build 6 MEM Functional/Pre-SAT Testing: March Build 6 MEM Site Acceptance Test (SAT): March MEM Limited Full Functionality Trials (3 Ops/day): March 26 – April 26 -MEM Full FANS Fleet 24x7 Trials Start: April 30 -4pm Daily Build 6 Testing/PTR review telcon DCL Trials – Test Status DCIT #22 (March , 2013) 8

Federal Aviation Administration DCL Trials – Test Status DCIT #22 (March , 2013) 9