WisDOT’s Statewide Traffic Operations Center. The mission of the STOC is to manage congestion and improve transportation safety, mobility, and efficiency.

Slides:



Advertisements
Similar presentations
Division of Alcoholic Beverages and Tobacco In-State Manufacturers Monthly Report.
Advertisements

TEAs UserAdministration+ The paperless way to apply for access to TEA SE and its web applications Revised July 2006 [Click mouse to advance from slide.
Utility Sentry | 5245 Old Dowd Road Suite 8 Charlotte, NC | |
Easy to use Ability to attach policies/procedures to call types Ability to schedule calls in advance Officer safety alerts Robust search capabilities.
MIDAS is a complete web based scheduling solution for managing your facility’s bookings and resources. MIDAS is a complete web based scheduling solution.
1 State Records Center Searching and Requesting Inventory  Versatile web address:  Look for any new ‘Special.
GALVESTON COUNTY, TX P-CARD TRAINING GALVESTON COUNTY.
CareCentrix Direct Training.
Employee Self Service August 2010 InSITE Self Service Employee Self Service Presentation This presentation is approximately 15 minutes in length. This.
Medicaid Alternative Benefit Plans (ABP) Processing
OnBase E-Forms and Workflow
SW Region Construction Conference February 19 th 2014 Joe Schneider – Work Zone Engineer Traffic Section – SW Region La Crosse Office.
Biller Direct Getting Started
Next Gen Web Solutions Student Employment Employer Training Template.
Introduction to Online Data Collection (OLDC) Community Based Abstinence Education September, 2009.
LANE CLOSURE CHARTS CHART DEVELOPMENT AND DELAY DAMAGES (District 3) OBJECTIVE To become familiar with the lane closure chart development process.
Allied Health Systems Authorizations Website Tutorial and Walk Thru.
Rick Via Statewide Incident Management Program Manager Office: Leveraging Technology & ITS to Enhance Traffic.
Logging into ITAMS as an Exempt Employee To Login to ITAMS for the first time: Open your web browser. Click File, Open, and type the following address:
June 16, 2004 Dr. Robert Bertini Michael Rose Evaluation of the “COMET” Incident Response Program Oregon Department of Transportation.
Maryland’s Coordinated Highways Action Response Team Richard R. Dye, CHART Systems Administrator “Welcome to the World of.
Provider Human Rights Coordinator Role Accessing HCSIS to Support Human Rights Committee Reviews September 11, 2013.
Phoenix International Raceway (PIR) Presented By: Nicolaas Swart Traffic Engineering & ITS Program Manager Maricopa County DOT April 26, 2006 Presented.
MAINTENANCE & TRAFFIC OPERATION INCIDENT MANAGEMENT.
A Guide to the BIZNET Online Filing System STATE OF CONNECTICUT DEPARTMENT OF CHILDREN & FAMILIES (DCF) DEPARTMENT OF DEVELOPMENTAL SERVICES (DDS) DEPARTMENT.
March 27, 2007 – Hill Farms March 28, 2007 – NE Region Wisconsin LCS Lane Closure Planning System LCS Oversight Group Meeting Steven Parker - TOPS Lab.
System for Administration, Training, and Educational Resources for NASA SATERN Overview for Learners May 2006.
Division of Alcoholic Beverages and Tobacco Beer Manufacturer’s Monthly Report.
Wisconsin Traffic Operations and Safety Laboratory Department of Civil and Environmental Engineering University of Wisconsin-Madison The Wisconsin DOT.
Fast Forward Full Speed Ahead Presented at the Joint ITS Georgia / Tennessee Annual Meeting September 25, 2006 by Carla W. Holmes, P.E., PTOE Georgia Department.
1 State Records Center Entering New Inventory  Versatile web address:  Look for any new ‘Special Updates’ each.
Keeping Wisconsin Moving: An Overview of WisDOT’s DMS Travel Times Kelly Langer, WisDOT, Freeway Operations Supervisor.
July 29, 2009 George Saylor, PE ODOT Senior ITS Engineer.
Enhanced 511: Beyond the Basics Jerry Woods Florida DOT – District 5 iFlorida - Automated Message Generation Based on Travel Times.
Home NEW INNOVATIONS Resident/Fellow Introduction NEW INNOVATIONS Resident/Fellow Introduction This presentation includes the following topics: Login Notifications.
Environment, Health and Safety OARS Online Accident Reporting System A guide to the University of Calgary’s new web- based On-line Accident Reporting System.
Wisconsin Department of Transportation Emergency Transportation Operations (ETO) Plan October 16, 2008.
Submitting Course Outlines for C-ID Designation Training for Articulation Officers Summer 2012.
Rev.04/2015© 2015 PLEASE NOTE: The Application Review Module (ARM) is a system that is designed as a shared service and is maintained by the Grants Centers.
SW Region Construction Conference February 19 th 2015 Jim Romanowski – Work Zone Engineer Traffic Section – SW Region Madison Office.
Early Childhood Outcomes Indicator 7 Data Collection Application Review.
1 Using Intelligent Transportation Systems (ITS) Technologies and Strategies to Better Manage Congestion Jeffrey F. Paniati Associate Administrator of.
Wisconsin Department of Transportation Emergency Transportation Operations (ETO) Plan October 10, 2008.
Registration Solutions for your Event Management.
Ceridian Time Solutions Hourly/Non-Exempt & (Non- Contracted) Per Diems Key Entry.
Steps for posting a training (single event or series) to the regional calendar R&C Regional Calendar.
Mike Wendt & Cara Abts WisDOT Regional Traffic March 10, 2015.
Office of Housing Choice Voucher Program Voucher Management System – VMS Version Released October 2011.
SMART Agency Tipsheet Facility List This document focuses on setting up facilities within an agency. Total Pages: 7 Facility Profile Contacts Operating.
Page 1 of 42 To the ETS – Create Client Account & Maintenance Online Training Course Individual accounts (called a Client Account) are subsets of the Site.
People First System Enhancements Release 1 B Manager and Employee Workshop February 2006.
LCS Objectives Provide a standard interface for lane closure operations, closure tracking, and data retrieval for WisDOT regional offices statewide Provide.
1 A Look at the Application Authorized users can access Communicator! NXT from any Internet-capable computer via the Web.
Welcome to Greenville County’s Introduction of the new online Permitting System!
(Required for DTCs, Recommended for STCs)
Software Application Overview
Nevada Next Generation 511 System 9 months to design, test and deploy
Employee Self Service – HRS Unclassified Leave
ERO Portal Overview & CFR Tool Training
Mount Aloysius College
E-NOTIFY and CAER OnLine Training
Single Event Violations
(Required for DTCs, Recommended for STCs)
Sanitary Sewage Overflow (SSO)
WisTMP 2.0 Update Andy Heidtke, PE Statewide Work Zone Design Engineer
Welcome to Grant Tracker!
CFR Enhancement Session
Using AIM (for Instructors)
Presentation transcript:

WisDOT’s Statewide Traffic Operations Center

The mission of the STOC is to manage congestion and improve transportation safety, mobility, and efficiency on Wisconsin’s state highways Operate traffic management and traveler information systems on WI highways 24 hr / 7 day a week / 365 days a year “Call Center” staffed by STOC Operators WisDOT STOC - Overview

STOC 2009 Org Chart

System detectors are used to collect speed and volume data Data collected is used to create travel times and populate system congestion map Currently piloting probe technology: – Fleet-based solution STOC - Monitor Traffic Conditions

Direct link to the Milwaukee County Sheriff’s Office computer-aided dispatch (CAD) – Incident details populate into STOC database and display on a congestion map Direct link to the State Patrol CAD – Planned for May 2009 Closed Circuit TV (CCTV) Camera images monitored by STOC Operators and used to locate traffic incidents – Milwaukee, Madison, GB, FDL, Wausau – Access to IL Tollway Video

STOC - Manage Traffic Congestion Ramp Meters - Used to regulate traffic entering the freeway

STOC - Traveler Information Provide travel times, congestion, incident and/or special event information via: – Dynamic Message Signs – Portable Changeable Message Signs (JamLogic) – Highway Advisory Radio – WisDOT Web Site – 511

511 - Overview 511 provides real-time traveler information services on the state’s major highways, including the Interstate system Utilizes an interactive voice recognition (IVR) phone system and Web site Provides incident reports, lane closure information, winter road conditions, and travel times – Initially focusing on the Milwaukee area – Expanding to Madison and Wausau over the next year Also provides transfers to transit services, State Patrol, County Sheriff Departments, airports, DMV, and other state’s 511 systems Emergency alert feature allows all users (or only users in a targeted area) to hear a special message – i.e. AMBER alerts or emergency weather closures

WisDOT 24/7 Response Capabilities If a highway dept or law enforcement agency needs to contact WisDOT, they can call: Operators working at the STOC answer the call STOC makes notification for WisDOT response Some examples include: signal knockdowns, bridge hits, flooding, and traffic incidents STOC should be contacted for any incident anticipated to have at least one state highway lane/ramp blocked for greater than 30 minutes NOT for general public use

Lane & Ramp Closure System An overview of the new features and a look at common closures.

Web-based system used to track closures and restrictions on Wisconsin state highways Archive LCS data in the WisTransPortal system for future analysis and integration with other WisDOT / TOPS Lab traffic engineering applications and research Facilitate data sharing with WisDOT applications that require lane closure data, such as 511 Traveler Information, Inconvenience Map production and Oversize/Overweight (OSOW) permitting Improve the completeness, reliability, and timeliness of lane closure data on state highways Integrate historical traffic flow data and capacity information to calculate available closure thresholds LCS Objectives

Coordinates activities to reduce back-ups and potential conflicts – Multiple activities can utilize the same closure – Avoid lane closures during a special event – Avoid conflicting lane closures on same highway Eliminates duplications and inefficiencies by streamlining information into one system Provides link to historical data that can be used to make informed decisions Benefits

What closures should be tracked? – All let projects (information formerly entered into Traffic Impediment Module) – Any planned maintenance or permit / utility work closure or restriction on: IH & USH Major state highways (Corridors 2030, 4-lane +, detoured closures) – Emergency Closures (I.e. closures that are the result of an unexpected incident, such as a bridge hit or flooding, that result in the roadway being closed for an extended period of time) – All major special events When should closures be entered? – 14 days - Project start or full roadway closure – 7 days - System ramp closure – 3 days - Lane and service ramp closure System Use

User Roles LCS User Roles – Administrator – Supervisor – Regional Traffic Engineer (RTE) - Regional Coordinator – Statewide Traffic Operations Center (STOC) – Project Manager (PM) – Permit Coordinator (PC) – Maintenance Coordinator (MC) – Project Leader (PL) – Inspector (INSP) – Requestor (REQ) – Viewer (VIEWER) System can be accessed via the Internet – therefore people outside of WisDOT can log on with a username and password

When entering closures, please remember: – Specific closure information must be used when entering data into the LCS. A two month period indicating a roadway may be closed occasionally is not acceptable – For rolling closures, a specific date and time period should be entered The location should be identified using the anticipated start and end point of the segment where the closure will take place – Full roadway closures must be entered directionally One closure will be made for each direction A note on entering

Closure Complete Request Forward Accept Return / Reschedule Acceptance Process

Acceptance Process Continued When entering closures, please remember: – A WisDOT Regional Traffic Supervisor (RTS) must accept all freeway and expressway closures. If a RTS is unavailable, Regional Operations Managers should make approval Maintenance or project related staff should not be granted acceptance authorization – WISDOT PDS, Traffic, and Maintenance Supervisors should review closure information entered and accepted by staff with proper authorization on a weekly basis – It is important that closures be entered in accordance with the advanced notification guidelines previously outlined to allow adequate time for approval Enhancements have been made to better facilitate the acceptance process – Acceptance authorization will only be allowed by the Traffic Supervisor for all freeway closures.

Data Accuracy & Completing Closures It is critical that all closure information entered in the LCS be accurate – The closure information entered in the LCS is used to: Provide traveler information through WI’s newly established 511 phone system and website ( where data accuracy will have a direct impact on the public’s perception of the value of the system Issue OSOW permits, which has a direct impact on the movement of commerce through WI Any closure entered for more than 14 days must be manually completed – This requires a user to enter the LCS and complete the closure – A closure will continue to be reported until checked complete – Closures less than 14 days will automatically discontinue reporting

Special Events Special event information can be viewed within the LCS – Event information should be checked when scheduling closures to identify conflicts – The regional traffic section is responsible to enter special events that may impact traffic and are of concern when scheduling closures This activity should be coordinated with the Regional Communication Managers At a minimum, events should be entered into the LCS by the 15 th of every month. A report of all the events will be distributed to all PDS and Ops Supervisors

Special Events Continued The Calendar Interface allows users to check for events prior to requesting a closure

Special Events Continued Users can also check on Special Events in the Accept & Modify Interfaces before accepting or editing a closure

Web Address

Request - General Section Disappearance of the duration drop down. Disappearance of the External Comments New naming scheme – Primary and Secondary contacts phone numbers will automatically populate New Old

Request - Facilities Section NewOld The duration drop down is now in the facility section of a closure

Closure Duration Daily/Nightly: closure occurs on a daily or nightly basis as specified by the starting and ending times per each day within the start date and end date range. Continuous: closure is more than 24 hours but less than 2 weeks. Long Term: closure more than 2 weeks.

Duration – Long Term Long Term closures no longer have a timeframe associated with the dates of the closure.

Duration - Weekly New DOW location to make it easier to distinguish between the beginning and end days. Weekly: re- occurs on a weekly basis as specified by the day of week dropdowns

Accept Interface Can now search on a highway, not just a single direction Project ID or Closure ID searches will override other parameters Can search for multiple CID’s at a time – CID’s must be separated by comma or dash for a range and text field must be less than 35 characters New Old

Modify Interface Modify has been changed to “Edit” to avoid confusion with it’s function. Closures longer than 14 days are changed to complete from the Modify Interface.

Searching Changes Formatting changes have been made to the Accept, Modify, and Search interfaces Overall speed of searches improved though all interfaces Printable All makes it easier to print multiple closures CSV (comma separated values) allows users to export data into an Excel file.

Reports Interface Many changes to the Reports Interface Focus on active closures Ability to lookup closures that only have OSOW restrictions Recently modified searches Again can narrow by Project ID or CID New Old

Closure Walk Through General screen filled in with all pertinent data – The more information entered, the easier it is to make contact with closure personnel

Closure Walk Through Type of facility ( mainline, ramp, bridge or system interchange ) Duration type ( daily/nightly, weekly, continuous or long term ) Closure is either a closure or restriction What’s closed ( single lane, left shoulder, left lane, 2 left lanes etc.. ) Closure location If the closure location is not listed, find the closest point and give a direction and distance from OSOW Restrictions ( place any restrictions that OSOW will use when creating routes / issuing permits ) If a full closure is selected, a detour route will need to be entered Other useful information about the closure should be placed in the external facilities box If more than 1 facility will be needed, the add facility button will allow for multiple entries

Closure Walk Through Here a single lane will be closed for one week, from 9 am to 2 pm Be as precise as possible with the start & end time as-well-as with the begin and end locations

Closure Walk Through A Weekly Duration is a closure that will start on Monday at 9am and be picked up on Friday at 2pm, for three weeks in April This Continuous closure duration will be active from Friday the 3 rd at 9pm and be picked up on Monday the 6 th at 6am This long-term closure will take place for the entire month of April When all the information is entered, submit the closure for review/acceptance

Closure Walk Through If work will be done in the opposite direction, the MakeLike link will auto fill the General section of the closure – User will have to change the Hwy Direction

Closure Walk Through The Edit button is where changes can be made to a live closure Used when the new date/time are known Rescheduled requires re- acceptance Used when date/time are unknown

Closure Walk Through This long term closure will need to be “completed” when the work is finished For closures with a single or multiple facilities, use Complete All button A closure that has multiple facilities but only 1 is complete, use the facility- specific complete button All closures lasting longer than 2 weeks need to be completed, regardless of the closure type (daily/nightly, weekly, continuous or long term)

Common Mistakes Closures cannot be entered with a “vague” definition of when a lane closure may happen Must be entered with specific dates & times – Unless the closure is truly long term

Common Mistakes Closures cannot be entered with no begin and end time defined

Forgot Password If a user lost his/her password, the user can follow the “Forgot Password” link to have their password reset

Contacts NEPat O’Connor (920) NCLaurie Miller (715) NWRick Tumaniec (715) SEChris Quesnell (414) SWJoe Schneider (608) – For username/password questions, – For questions about missing construction Project IDs, – For additional questions about WisLCS reporting procedures, contact the WisDOT State Traffic Operations Center: Scott Kozlik Doug Dembowski Lead Operator Supervisor Phone: (414) (414) – WisDOT STOC 24-hour phone number: (414)