DuPont Design for Reliability Tactical Approach to Front End Loading

Slides:



Advertisements
Similar presentations
Slide 1 The basic problem Working Age t PDF f(t) Failures do not happen at fixed times. They occur randomly based on a distribution. Probabilty Density.
Advertisements

Training Guide. `
MAINTENANCE PLANNING AND SCHEDULING
DATA CONSIDERATIONS Module 3 UNIT IV ADDITIONAL TOPICS " Copyright 2002, Information Spectrum, Inc. All Rights Reserved."
MARKETING MANAGEMENT 13th edition
Culture and Leadership
1. 2 What Studies Confirm ? 3 What Studies Could Not Ascertain ? Exact impact of Weather Visibility. Wind, Storms, Hail, Snow. Clouds, Fog, Mist. Temperature.
Presented by Matthew J. LaChance Pavement Solutions for State, County, and Municipal Infrastructures.
FAA/JAA 19th Annual FAA/JAA International Conference Safety Safety Management Systems: Challenges and Benefits Captain Paul Woodburn Director Safety, IATA.
Overview Lesson 10,11 - Software Quality Assurance
SE 450 Software Processes & Product Metrics Reliability Engineering.
Properties of the System Elements RELIABILITY (AVAILABILITY) PERFORMANCE COST R R R.
Maintenance and Reliability Ross L. Fink. Maintenance  All activities involved in keeping a system’s equipment in working order.
Implicit Differentiation. Objectives Students will be able to Calculate derivative of function defined implicitly. Determine the slope of the tangent.
© Prentice Hall, 2005: Enterprise Resource Planning, 1 st Edition by Mary Sumner 3-1 Enterprise Resource Planning, 1 st Edition by Mary Sumner Chapter.
Design, Implementation and Maintenance
@ Industrial Engineering by Bopaya Bidanda David I. Cleland.
Presented to: ECHO June 30, 2001 “It’s all in the packaging- Creating Curb Appeal”
LECTURE 1. Course: “Design of Systems: Structural Approach” Dept. “Communication Networks &Systems”, Faculty of Radioengineering & Cybernetics Moscow Inst.
Project & Quality Management Quality Management Reliability.
1 Reliability Analytics Special Interest Group Presentation to Houston SMRP MARS Conference Galveston, TX August 22, 2012 Paul Casto & Mike Raible, Secretary.
Introduction to Interactive Media 02. The Interactive Media Development Process.
The EFNMS Maintenance Concept Date: September 13, 2012 Presenter:Alex Stuber.
From Research Prototype to Production
1. 2 by Ms. Zulekha Soorma (HSE Advisor- Environmental Management Consultants)
Engineering Management From The Top Power Behind the Storage.
IHRIM n International Association for Human Resource Information Management n Professional group - HR, HRIS, IS managers; compensation, computer, and other.
Introduction to Interactive Media The Interactive Media Development Process.
ADVANCED DESIGN APPLICATIONS UNIT 4 - MANUFACTURING © 2015 International Technology and Engineering Educators Association, Learning Cycle Three – Looping.
Designing Goods and Services Chapter 3, Part 1. Operations and Operations Strategy Designing an Operations System Managing an Operations System Done We.
Page 1 Designing for Health; A Methodology for Integrated Diagnostics/Prognostics Raymond Beshears Raytheon 2501 W. University McKinney, TX
Slide 1V&V 10/2002 Software Quality Assurance Dr. Linda H. Rosenberg Assistant Director For Information Sciences Goddard Space Flight Center, NASA
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
Institute of Transportation Systems > OPTIMISATION OF POINT LIFE CYCLE COSTS THROUGH LOAD-DEPENDENT MAINTENANCE > Slide 1 OPTIMISATION OF POINT LIFE CYCLE.
FORUM: Design for Maintainability CII Construction Project Improvement Conference September 11-13, 2005 Austin, Texas George Conner Richard Danks Robert.
Downtime Reduction Ideas for a Symposium Presentation and Training
Working Drawings Introduction To Technology Shenendehowa High School
Assoc. Prof. Dr. Ahmet Turan ÖZCERİT.  System and Software  System Engineering  Software Engineering  Software Engineering Standards  Software Development.
Lecture 2 System Development Lifecycles. Building a house Definition phase Analysis phase Design phase Programming phase System Test phase Acceptance.
Best in Class 15 % 5 % 80 % 100 % Reactive / Deviation work Too little, too late 60 % 20 % 100 % Industry Average Non-value added Too much, too early Base.
SOFTWARE PROCESS IMPROVEMENT SHARATH CHANDAR REDDY ALETI CSC 532 TERM PAPER.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Defence in Depth Safety Culture Lecturer.
Designing Goods and Services Chapter 3, Part 1. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Capacity, Facilities, & Work.
Systems & Business Consultancy Author: Hans Groen.
2006 CMBG Conference Mike Stout Spescom Software, Inc. Configuration Management For The Next Generation.
PRIIA 305 Technical Subcommittee Systems Engineering Processes for Passenger Equipment Acquisition and Life Cycle Support Presented at: NGEC Executive.
Logistics Engineering and Management Hank Okraski 26 October 2013 Refer Unit 11, M&S Curriculum.
Enterprise Resource Planning
Essential Needs of Software Test Automation
CIS 375 Bruce R. Maxim UM-Dearborn
Operations Management Framework
Maintenance Scheduling
How to Pass SMRP (Society of Maintenance
Interactive Factors in Manufacturing
Team-Building Tactics Which C-Executives Should Know.
Automation – “A Critical Component of Agile testing”
MAINTENANCE PLANNING AND SCHEDULING
MED 563 Enthusiastic Studysnaptutorial.com
Authors/Collaborators
Diversity analysis for advanced reactor design
Project Activity #5: Design your product.
التدريب الرياضى إعداد الدكتور طارق صلاح.
APQP PROCESS FLOW Prepare for APQP Plan and Define Program
Business Simulation Seminar
Authors/Collaborators
Today’s Definition of Failure
MANAGING THE DEVELOPMENT AND PURCHASE OF INFORMATION SYSTEMS
When you hear the words balance, what do you think of?
NGEC Executive Board Meeting
Chapter Leadership Meeting January 28, 2017
Presentation transcript:

DuPont Design for Reliability Tactical Approach to Front End Loading Alfred E. Ogden, MSRE, CMRP DuPont Reliability Engineer MARS Conference 2012 – Galveston, TX

Agenda Differentiating between Quality and Reliability Value Proposition “Live” Case Study DF “X”: Front End Loading Tactical Approach

Distinction Between Reliability and Quality Quality assures that the production line will work after assembly and as designed. Reliability provides the probability that the production line will perform its intended function for a designated period of time without failure under specified conditions. Reliability looks at how long the equipment will work as designed, which is a very different objective than that of traditional quality control. Different tools and models apply to reliability that do not necessarily apply to quality and vice versa.

Reliability vs. Initial Cost What is your Experience of what the shape of this curve would look like?

Reliability vs. Initial Cost Here is an example – What elements will effect its shape and slope Elements that would effect the shape and slope: Available technologies – products that would work Complexity of the processes Range of cost of competing equipment Actual cost vs reliability of competing equipment (cheaper equipment could be more reliable) 5

Maintainability vs. Initial Cost What is your Experience or “Gut Feel” of what the shape of this curve

Maintainability vs. Initial Cost Here is an example – What would effect the shape and slope of this curve? Items that would effect the shape and slope of this curve: Competing technologies (range of available equipment that would work What is required to improve maintainability (layout, spacing, equipment size, etc) Design alternatives available 7

Life Cycle Cost vs. Initial Cost What is your Experience or “Gut Feel” of what the shape of this curve

Life Cycle Cost vs. Initial Cost Here is an example – What elements would effect the shape and slope of this curve? Elements that would effect the shape and slope of this curve: Available choices of equipment that would work Maintenance needs of the equipment Energy consumption of the equipment 9

Front End Loading FEL 1 Determine the desired Maintenance Culture and Preliminary Maintenance Strategies Add a Maintenance Team Leader to the Project Team and Assign a Reliability Engineer too Include specific and realistic Reliability Goals in the Project Objectives Model the Preliminary design to determine equipment availability – Reliability Requirements & Possibilities

Front End Loading FEL 2 Add Reliability enhancing design elements into Project Design and Equipment Selection Assure that Maintainability is a significant consideration in the design process Develop the Maintenance Plan for the Equipment Upgrade the Model with the more complete design information – use results to guide refinements to design

Front End Loading FEL 3 Develop a Maintenance Materials Strategy Increase Maintenance Craft Specialist involvement in review and analysis of designs and equipment selection to assure Maintainability and Reliability Determine Maintenance Training needs Start Building the Equipment and Parts Master Data Develop the Bills of Material

Questions