Critical Design Review of “Mach Shock Reduction” Phase II January 2008 Statesville, NC.

Slides:



Advertisements
Similar presentations
University of Florida Hybrid Rocket Team’s Mile High Club
Advertisements

UF Hybrid Rocket Teams Mile High Club Brought to you by Chris Leonard, Ty Morton, Sam Darr, and Josh Childs.
University of Florida PDR Presentation. Vehicle Design Diameter: 5.86 Length: 135 Static Stability Margin: 1.4 Total Weight: 23.6 lbs.
Preliminary Design Review. Rocket & Payload Schematic.
Northwestern University Space Technology and Rocketry Society (NUSTARS) NASA Student Launch Flight Readiness Review March 16, 2015.
U NIVERSITY OF F LORIDA T HE M OST I NTERESTING R OCKET IN THE W ORLD.
P RELIMINARY D ESIGN R EVIEW University of North Dakota Frozen Fury Rockety Team.
Student Launch Project Preliminary Design Review January 10, 2014.
Launch Lug – helps to guide the rocket upward until it reaches enough velocity for the fins to engage. Parachute – assists in the safe recovery of the.
Illinois Space Society Tech Team USLI CDR Presentation.
U NIVERSITY OF F LORIDA PDR P RESENTATION. O UTLINE Project Organization Vehicle Design Payload Design Recovery System Simulations Future Work.
Our Mission Statement  Launch a high-power rocket to an altitude of one mile carrying the Operation: Epic Beep payload package. At lift off, the rocket’s.
NASA CDR Presentation Spring Grove Area High School.
St. Vincent – St. Mary FRR Presentation NASA Student Launch Initiative.
UAA Rocketry Critical Design Review Presentation.
NASA SLI 2010 Mulberry Grove High School Flight Readiness Review Measurement of UVB Radiation Absorption by Cloth Material at Different Altitudes and Measurement.
Student Launch Project Critical Design Review February 28, 2014.
Flight Readiness Review. Intimidator 5: 5” diameter, 10’ length, 47 lbs  Motor: Aerotech L1300R 4556 N-Sec of impulse  Predicted altitude 5203’- RockSim.
Critical Design Review. Intimidator 5: 5” diameter, 10’ length, 45 lbs  Motor: Aerotech L1300R 4556 N-Sec of impulse  Predicted altitude RockSim.
November 7,  Length: inches  Diameter: 6.00 inches  Mass: oz. / 17.34lbs.  Span: inches  Center of Gravity: inches.
Flight Readiness Review Atomic Aggies. Final Launch Vehicle Dimensions Diameter 5.5” Overall length: inches Approximate Loaded Weight: lb.
Launch Vehicle  Launch Vehicle Summary  The length of the rocked is inches, and the mass is ounces.  We have a dual Deployment Recovery.
Illinois Space Society Tech Team USLI FRR Presentation.
CDR Clear Lake's Team Rocket 2929 Bay Area Blvd. Houston, TX
Rocket Based Deployable Data Network University of New Hampshire Rocket Cats Collin Huston, Brian Gray, Joe Paulo, Shane Hedlund, Sheldon McKinley, Fred.
Rocket Based Deployable Data Network University of New Hampshire Rocket Cats Collin Huston, Brian Gray, Joe Paulo, Shane Hedlund, Sheldon McKinley, Fred.
Student Launch Project Flight Readiness Review April 21, 2014.
 Vehicle dimensions, materials, and justifications  Static stability margin  Plan for vehicle safety verification and testing  Baseline motor selection.
Safety ► The safety officer for the entire team is Maia Madrid. ► During launch we will follow NAR safety rules and regulations. ► We will follow standard.
Flight Readiness Review Team Hawaii. Vehicle Properties Diameter (in)6 inches Length (in)127 inches Gross Liftoff Weight (lb)50.25 lb Launch Lug/button.
3/19/09. Animal Motor Works (AMW) K475WW High Power Rocket Motor. 54 mm casing, 40.3 cm long, 2.9 seconds burn time, 1394 N-sec total impulse, and
The Rocket Men Project One Giant Leap. Final Launch Vehicle Dimensions Rocket Length in. Rocket Mass- 171 oz. Top Body Tube Length in. Bottom.
STUDENT LAUNCH PRELIMINARY DESIGN REVIEW PROJECT ADVANCE.
The Comparative Analysis of Airflow Around a Rocket.
FRR Presentation IF AT FIRST YOU DON’T SUCCEED, TRY AGAIN… AND AGAIN AND AGAIN AND AGAIN.
Flight Readiness Review Student Launch Initiative SCS Rocket Team Statesville Christian School April 2, 2008.
The Comparative Analysis of Airflow Around a Rocket.
The Efficiency of Flexible Solar Panels and Changes in the Earth’s Magnetic Field at Altitude.
University of Florida Rocket Team Critical Design Review Presentation.
Critical Design Review Presentation Jan. 20, 2011.
Harvard-Westlake Rocketry Club SLI FRR.
Critical Design Review- UCF Jeremy Young Anthony Liauppa Erica Terry, Emily Sachs Kristen Brightwell Gillian Smith 1.
Atomic Aggies CDR. Final Launch Vehicle Dimensions Diameter 5.5” Overall length: inches Approximate Loaded Weight: lb.
Project Ares University of Central Florida NASA Student Launch 1/28/2015.
D EPARTMENT OF M ECHANICAL AND A EROSPACE E NGINEERING HIGH POWERED ROCKETRY CLUB PDR PRESENTATION 1.
Hemodynamics Star Splitters 4-H Club Two Rivers, WI Hemodynamics.
HARDING UNIVERSITY FLYING BISONS A Study of Atmospheric Properties as a Function of Altitude Flight Readiness Review.
University Student Launch Initiative Preliminary Design Review University of Illinois at Urbana-Champaign Team Rocket.
NUSTA RS NASA Student Launch MAV Challenge 2016 Critical Design Review 15 Janurary2015 Northwestern University | 2145 Sheridan Road | Evanston, IL
January 14,  Length: inches  Diameter: 6 inches  Mass: oz. / lbs.  Span: 22 inches  Center of Gravity: inches 
FAMU PDR Presentation. Table of Contents Vehicle dimensions, materials, and justifications Static stability margin Plan for vehicle safety verification.
Critical Design Review Presentation Project Nova.
Flight Readiness Review UNIVERSITY OF SOUTH ALABAMA CONNER DENTON, JOHN FAULK, NGHIA HUYNH, KENT LINO, PHILLIP RUSCHMYER, & ANDREW TINDELL MENTOR : RICHARD.
UCF_USLI Preliminary Design Review David Cousin Freya Ford Md Arif Drew Dieckmann Stephen Hirst Mitra Mossaddad University of Central Florida.
College of Engineering
Critical Design Review Presentation
2018 First Nation Launch - Flight Readiness Review
November 7, 2014.
November 7, 2014.
Sounding Rocket CDR Team Name
Final Readiness Review
Mars Rover CDR Team Name
2019 First Nation Launch – FRR Virtual Review
2019 First Nation Launch – PDR Virtual Review
2019 First Nation Launch – Oral Presentation
2019 First Nation Launch – CDR Virtual Review
Plantation High SL team 1
Target Altitude Safety Document
2019 First Nation Launch – Oral Presentation
Presentation transcript:

Critical Design Review of “Mach Shock Reduction” Phase II January 2008 Statesville, NC

Presentation Outline Rocket specifications and predicted flight data Test Plans –Scale Model Testing –Recovery Tests

Rocket flight stability in Rocksim static margin diagram

Motor selection in flight simulations

Cesaroni K1440 Motor Thrust Curve

Rail Exit Velocity The velocity of the rocket as it leaves the launch rail is predicted to be about 80 mph. At or near this velocity the rocket will be stable as it leaves the launch rail.

Parachute Sizes and Descent Rates At apogee till main parachute deployment our best guess is that the rocket will fall at a rate of 60 to 70 ft/s. This is based on flight data from similar rockets. From RockSim, the descent rate of the rocket after the main parachute ejection occurs is between 19 and 20 ft/s.

Reverse thrust motor will fit onto rocket as a modified fiberglass nosecone. Receiver electronics will fit into rocket as an extra payload section between the main parachute bay and the reverse thrust motor. Small tubing will be run along the length of the rocket to accommodate the wires for the pressure sensors as well as the reverse thrust motor ignition. Payload Integration Feasibility

Test plans and procedures The team plans on conducting various test to ensure that the rocket is stable and safe. Check all cuts and make sure that all cuts are straight to prevent drag separation. Test to make sure that the amount of black powder used is enough to deploy the drogue and main chute. Test altimeters to make sure that they blow the ejection charges.

Scale Model Flight test The scale model has not yet been launched due to weather issues but will hopefully be launched on January 29 and the data recorded by day of the presentation.

Dual Deployment Avionics Test Test altimeters in a variable pressure jar to determine if each can determine launch and apogee. Have electrical meters to main and secondary deployment contacts to determine if the altimeters tried to blow the ejection charges.

Ejection Charge Amount Test Go to online calculators and determine the amount of black powder recommended for our rocket. Ground test the rocket using this amount to determine if deployment of the rocket recovery system occurs. Adjust as necessary if ejection event is too weak or too strong.

Conclusion Presented rocket design, physical data and predicted flight data. Discussed scale model test results if completed. Discussed test plans going forward.