ATLAS Muon New Small Wheel Grounding, Power and Interconnect -Guidelines and Policies- 9 Feb 2015 John Oliver for the ATLAS Muon NSW Grounding Working.

Slides:



Advertisements
Similar presentations
Introduction to Semiconductor Devices
Advertisements

Differential Amplifiers and Integrated Circuit (IC) Amplifiers
Physical structure of a n-channel device:
Micro MEsh GASeous Detectors (MicroMegas)
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
FET ( Field Effect Transistor)
D. Peterson, “ILC Detector Work”, Cornell Group Meeting, 4-October ILC Detector Work This project is supported by the US National Science Foundation.
The metal-oxide field-effect transistor (MOSFET)
Week 8b OUTLINE Using pn-diodes to isolate transistors in an IC
© 2012 Pearson Education. Upper Saddle River, NJ, All rights reserved. Electronic Devices, 9th edition Thomas L. Floyd Electronic Devices Ninth.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Storey: Electrical & Electronic Systems © Pearson Education Limited 2004 OHT 20.1 Field-Effect Transistors  Introduction  An Overview of Field-Effect.
Chapter 22 Alternating-Current Circuits and Machines.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
Electromagnetic Compatibility of a DC Power Distribution System for the ATLAS Liquid Argon Calorimeter G. BLANCHOT CERN, CH-1211 Geneva 23, Switzerland.
Various Topics Related to FEB Liang Han, Ge Jin University of Science and Technology of China Dec.21,2013.
Short study of a very simple LVDS shift The Barcelone VFE chip output is CMOS, -1.65/+1.65 volt. This output is then convert into serial LVDS format. Without.
DC-DC Buck Converter in Inner Detector Environment
09/16/2010© 2010 NTUST Today Course overview and information.
CHAPTER 7 Junction Field-Effect Transistors. OBJECTIVES Describe and Analyze: JFET theory JFETS vs. Bipolars JFET Characteristics JFET Biasing JFET Circuits.
Semiconductor detectors
ATLAS Tracker Upgrade Stave Collaboration Workshop Oxford 6-9 February 2012 ABC 130 Hybrid.
18-Jan-021W. Karpinski System Test Design verification of petals and interconnect boards and control links without detectors a)mechanics b)electrical.
Readout of DC coupled double sided sensors with CBMXYTER: Some first thoughts Peter Fischer, Heidelberg University.
Field Effect Transistors Next to the bipolar device that has been studied thus far the Field Effect Transistor is very common in electronic circuitry,
Field Effect Transistors By Er. S.GHOSH
CVD PCB, first steps. 15 mm 25 mm Chip area. No ground plane underneath the chip. Bulk isolated => only one ground line Power lines Connector: 11,1mm*2,1mm:
EGRE 427 Advanced Digital Design Figures from Application-Specific Integrated Circuits, Michael John Sebastian Smith, Addison Wesley, 1997 Chapter 4 Programmable.
Electronic Troubleshooting Chapter 8 Operational Amplifiers.
S. Lusin, T1 ESR, CERN 17 Sep 101 Totem T1 ESR 17 Sep 10 S. Lusin Observations from Electrical Inspection of T1.
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
1 Outer Tracker Front-End Layout Distribution of Signals and Bias NIKHEF/HeidelbergOctober 2002.
Overview of the ATLAS Electromagnetic Compatibility Policy G. BLANCHOT CERN, CH-1211 Geneva 23, Switzerland 10th Workshop on Electronics.
STGC Trigger Demonstrator sTGC Trigger Demonstrator ATLAS Israel Annual Meeting 30 December 2012 Lorne Levinson, Julia Narevicius, Alex Roich, Meir Shoa,
Power Distribution Existing Systems Power in the trackers Power in the calorimeters Need for changes.
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
HV-Splitter for RENO Project S. Stepanyan, 김우영 경북대학교 Y.Kim Sejong University May-2008.
07 - Winter 2005 ECE ECE 766 Computer Interfacing and Protocols 1 Grounding Grounds: –Common reference for the circuit –Safety What is the potential problem.
D. Nelson October 7, Serial Power Overview Presented by David Nelson
M. Bianco On behalf of the ATLAS Collaboration
CARDIAC meeting – 30 Sept 05 M3R3-M5R3-M5R4 FEE status.
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
Chapter 4 Bipolar Junction Transistors
24/05/2010Rui De Oliveira1 Resistive protections for Bulk Micromegas Rui de oliveira, Joerg Wotschack Venetios Polychronakos.
BASIC SEMICONDUCTOR ELECTRONIC CIRCUITS Introduction of two basic electronic elements: diode and transistor LEARNING GOALS Diodes structure and four modeling.
Takeshi Matsuda LC TPC Collaboration March 5, 2008 TPC Endcap Materials.
Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage u High.
P. Aspell CERN April 2011 CMS MPGD Upgrade …. Electronics 2 1.
Summer Student Session, 11/08/2015 Sofia Ferreira Teixeira Summer Student at ATLAS-PH-ADE-MU COMSOL simulation of the Micromegas Detector.
Compilation of Dis-/Advantages of DC-DC Conversion Schemes Power Task Force Meeting December 16 th, 2008 Katja Klein 1. Physikalisches Institut B RWTH.
STGC Front end boards sTGC Front end boards NSW Electronics workshop November 2013 L. Levinson Weizmann Institute NSW Electronics workshop, November 20131L.
Grounding.
SP & DC-DC Considering the benefits of combining serial powering and DC-DC conversion technologies in powering ATLAS SCT upgrade modules & staves Richard.
1 Fulvio TESSAROTTO CERN, 13/11/ COMPASS THGEM meeting Construction of the large size Hybrid Prototype The bulk Micromegas technology Examples of.
CERN – 7 Oct 04 1 LHCb Muon Grounding Anatoli Katchouk CERN Alessandro Balla, Paolo Ciambrone, Maurizio Carletti, Giovanni Corradi, Giulietto Felici, Rosario.
Single Phase Induction Motor Speed Control. Introduction Single Phase Induction Motor Speed Control  Induction motors are.
AC Machines. BOOSTER Basic Function:- -Sometimes when we use electrical power we need different voltage level to main supply. It is provided by Booster.
Serial powering for pixels F. Hügging, D. Arutinov, M. Barbero, A. Eyring, L. Gonella, M. Karagounis, H. Krüger, N. Wermes SLHC-PP Annual Meeting, CIEMAT,
Chapter 21 Magnetic Induction and Chapter 22.9: Transformers.
Noise & Grounding Andrei Nomerotski (U.Oxford) 17 July 2007.
Power Distribution Copyright F. Canavero, R. Fantino Licensed to HDT - High Design Technology.
Grounding.
Introduction to Semiconductor Devices
MOSFET The MOSFET (Metal Oxide Semiconductor Field Effect Transistor) transistor is a semiconductor device which is widely used for switching and amplifying.
Calorimeter Mu2e Development electronics Front-end Review
A few ideas about detector grounding and shielding D. Breton
Meeting on Services and Power Supplies
GLAST Large Area Telescope:
Presentation transcript:

ATLAS Muon New Small Wheel Grounding, Power and Interconnect -Guidelines and Policies- 9 Feb 2015 John Oliver for the ATLAS Muon NSW Grounding Working Group: Theo Alexopoulis, Jon Ameel, Dan Amidei, Ryan Edgar, John Huth, Mauro Iodice, Ken Johns, Agostino Lanza, Lorne Levinson, Nachman Lupu, Giora Mikenberg, John Oliver, Vinnie Polychronakos, Patrick Ponsot, Givi Sekhniaidze [Ref 1] Standard grounding practices NSW specific issues “Gounding Doc”  NSW Grounding Signaling pdf (on EDMS) Specifies all “Guidelines” and “Policies” for grounding and signal transmission in NSW detectors and electronics [Ref 1] Many useful discussions with Veljko Radeka and Gianluigi De Geronimo are gratefully acknowledged

ATLAS Muon NSW Grounding2 Standard practices General principles Detector, electronics, and power supplies completely contain their own currents. None leaks out to, or in from, the environment. No ground loops. Each sector will be attached to its mechanical frame via insulated attachments. This insures that the mechanical mounts do not constitute signal or power supply paths or allow unintended ground currents. Each Sector of the NSW will be connected to a common grounding point by means of a low inductance, low resistance ground strap. The outer Faraday enclosure of each sector will be connected to this strap. The ground strap must carry zero current (by design, not accident)  Ground strap is only point of entry/exit for current to detector All DCS sensors (temperature, B field, etc) must be insulated from detector faraday enclosure (Ground)

ATLAS Muon NSW Grounding3 Frontend electronics issues – Hybrid vs ASIC (VMM) “Traditional” frontend amplifier Generally hybrid technology N-channel jfet chosen for low-noise, high transconductance Main “gain” junction is gate-source (detector-AGND) Bypassing Vdd is relatively easy. Amplifier has good PSRR Keep gate-source loop small and well shielded ASIC frontend amplifiers (VMM) Generally CMOS ASIC technology P-channel mosfet chosen for lower 1/f noise as compared with n-channel devices in same technology (Exception is MDT-ASD which used n-channel mosfet) Main “gain” junction is gate-source (detector-AVdd) Bypassing Vdd is more difficult. Amplifier has poorer PSRR Special attention to Vdd /AGND/Faraday cage bypassing. Frequently requires special attention to pcb “planes” used under ASIC and detector inputs  AVdd instead of AGND ASIC designers should be consulted on detailed frontend board designs.

ATLAS Muon NSW Grounding4 Micromegas signal model Relatively simple (and small) signal flow loop. Approximately square pulse developed in amplification region  50ns to 100ns wide depending on ion drift velocity. Signal developed between mesh (AGND) and resistive strip Detailed SPICE modeling done of signal flow & timing (G. De Geronimo, J. Oliver). Resistive strip tightly coupled to Readout Strip  ~ 15% signal loss HV biasing of resistive strip must by bypassed, ideally to Avdd, but this is not practical.  Bypass to AGnd High value resistance must be placed between bypass cap and resistive strip to avoid “end effect”, or loss of gain at strip ends. Overlap of resistive strip beyond readout strip end constitutes needed bypass resistor – no discrete resistor necessary

ATLAS Muon NSW Grounding5 sTGC signal model Relatively complex signal loop path involving both boards and the AGND plane Ignoring resistive sheets, signals go from  Avdd  VMM wire  Wires  Strips&Pads  VMM strip & VMM pad  AGND Adequate Vdd/AGND bypassing essential Must have very low inductance, low resistance paths from Frontend Board to sTGC AGND plane

ATLAS Muon NSW Grounding6 LV Distribution Same situation exists for MM and sTGC  MM shown explicitly (Grounding Doc describes both) Supply line lengths vary from a few 10s of cm to ~ 4m Cable resistances vary accordingly (if all the same gauge) All return lines have same voltage drop  current can vary by large factors If average current is 1A, then return currents can vary from 1/4A for the farthest from DP to ~4A for the nearest. Large bulk supply currents would mix across detector Analog Ground planes. Note that DC/DC converters on Frontend Boards are not ground isolated. If they were, we wouldn’t need to worry about equalizing return lines.

ATLAS Muon NSW Grounding7 LV Distribution (cont) Remedy  Equalize return path resistances with discrete “ballast” resistors in Distribution Panel Careful resistor choice  Equalized return currents to ~10% or better Not required in supply lines because frontend board’s DC/DC converters are tolerant to varying line drops Bulk supplies must have floating RETURN connection : NOT Grounded, but “Safety Grounds” may be required by CERN safety standards. Possible fault modes Frontend board failure may result in  Reduced total current  Excess current  Blown fuse (Zero current) [1] In each case, return currents will equalize for all boards, including the fault board Imbalanced current will be redistributed by detector’s Agnd plane Consequences of this situation should be tested. [1] Fused supply lines may be required by CERN safety regs to prevent cable fire or catastrophic failure. This is under investigation.

ATLAS Muon NSW Grounding8 HV Distribution Similar (ground drop) condition does not exist for HV distribution because currents are much lower Safety regulations require that unlike LV, the HV supply must be Grounded at supply Ground loop at point of HV delivery is “broken” by resistor placed in the cable-to-detector ground connection. This is very standard as was done in MDTs and many other detectors Resistor of several 100s of Ohms to 1 kOhm are typical.

ATLAS Muon NSW Grounding9 LVDS Cabling Convention LVDS will be used extensively between on-detector boards in both MM and sTGCs LVDS lines couple “frontend” boards with first level DAQ and/or Trigger data collection boards. Lines go in both directions. Cable shield grounds and drain wires must be AC coupled at one end only to prevent web of ground loops which would otherwise occur. It has no impact on signal integrity. By convention, the ground’s AC coupling is placed at the “Frontend Board” regardless of which is driving or receiving end. Signal lines should be DC coupled as there will be no large common mode ground differences between boards. 8b/10b is not required but would do no harm if used. ART Data (MM trigger) is serial with no 8b/10b or dc balance encoding.

10ATLAS Muon NSW Grounding 1.Shielding and Grounding in Large Detectors – V. RadekaShielding and Grounding in Large Detectors 2.Grounding of the ATLAS Experiment – G. Blanchot et alGrounding of the ATLAS Experiment 3.ATLAS Muon Grounding – J. Huth, et alATLAS Muon Grounding 4.MINOS Far Detector Grounding Proposal – J. OliverMINOS Far Detector Grounding Proposal 5.LVDS Owner’s Manual – National SemiconductorLVDS Owner’s Manual – National Semiconductor References Is a “NSW Grounding document” really necessary? “It prevents a lot of headache and grief later on”- NSW Grounding Working Group “I think it would be a very good idea” - M. Gandhi Conclusion