Www.goviex.com Uranium exploration and development in the heart of Niger’s uranium-producing district  Niger is a major uranium producer since the 1970’s,

Slides:



Advertisements
Similar presentations
Gold Rock May 2013 Drill-Ready Gold Property Adjacent to Manitou Gold.
Advertisements

Photo Book: The Deer Trail Mine Story Piute County Utah Q
MALAWI COAL TO POWER MALAWI GROWTH Malawi Trade & Investment Forum March 2013.
1CPEAC/EHC CONFERENCE – 8 March 2009 Alberta & Oil: Where it has been and where it is heading for? Peter Yang, M.Sc., P.Eng. Manager, SAGD Specialist Group.
2008 Second Quarter Results TSX: LUN NYSE: LMC OMX: LUMI.
版权所有: CMC 1 Sonda-Jherrukh Coal Mine& Power Plant Project.
Mining in Latin America Ralph Lutes, Vice President, Asia, Executive Director & General Manager, Teck China October 22, 2014.
World’s largest undeveloped tin deposit in Kazakhstan.
Creating a New Exploration Growth Story March 2009.
GoviEx Uranium September Disclaimers & Cautionary Statements This presentation is confidential and proprietary to GoviEx Uranium Inc., and may not.
1 NYSE MKT: REE & TSX: RES Bear Lodge Critical Rare Earth Project Technology Metals Summit – March 2013 A Year of Dramatic Change.
RBC Capital Markets MLP Conference Dallas, TX November 20-21, 2008.
Standard Register Fourth Quarter and Full Year 2007 Conference Call February 22, 2008.
1. Investor Presentation April Disclaimer DISCLAIMER: This presentation contains forward-looking statements including but not limited to comments.
1 Mineral Enterprise Corporation Investor Presentation MINENCO.
Understanding and Valuating Exploration Companies 24 May 2007 Shane Hunter.
4.7 Billion Rand Investment In South Africa Driefontein 9 Sub-vertical Shaft Depth Extension and Kloof Extension Area Decline Shaft System 7 September.
CanAlaska Ventures Ltd This slide show presentation contains certain "Forward-Looking Statements" within the meaning of Section 21E of the United States.
NEVADO RESOURCES CORPORATION (TSX-V:VDO) Strategic Metals in Northern Quebec August 2013.
Wesizwe Platinum – Building a Resilient Organisation Jacob Mothomogolo Projects Executive, Wesizwe Platinum Limited 30 October 2013.
4/16/2017 SHERRITT INTERNATIONAL Ambatovy Nickel Project: A Progress Report March 2008.
Red Rock Energy Inc. (TSX-V: RRK) May 9, This presentation may contain forward-looking information including expectations of future production,
Platina Resources Limited Rob Mosig, Managing Director Greenland Sustainable Mineral & Petroleum Development Conference 2010.
State-of-the-art Greenhouses GROWCO, INC. – A MAJORITY OWNED SUBSIDIARY OF TWO RIVERS WATER & FARMING DENVER, CO – – – OTCQB:
Western Financial Group Q Financial Results Conference Call August 18, 2009.
Agnico-Eagle Mines Limited1. 2 Growth Strategy Building Value Through Production and Reserve Growth Produce more gold targeting over 1.2 million ounces.
SMH Capital Houston, TX February 25, Forward Looking Statement The statements made by representatives of Natural Resource Partners L.P. (“NRP”)
AN INTRODUCTION TO ANGLO AMERICAN. 2 ANGLO AMERICAN Anglo American is a global diversified miner with a market capitalisation of more than $70bn and interests.
Doing Business in Central Asia – Kyrgyz Republic and Mongolia John Pearson, Vice President Investor Relations.
Todd Creek (25% Interest) May 2013 An Advanced Exploration Project in B.C.’s Golden Triangle.
Project Planning and Capital Budgeting
TSX-V: OCO Frankfurt: OR6
1 Dutch Gold Resource, Inc. Company Update April 5, 2012 DGRI: OTCQB.
Forward Looking Statements This presentation contains “forward looking statements”. These forward-looking statements are made as of the date of this presentation.
Commodity Hedging Overview May 10, 2012 The following information is current as of May 10, Memorial Production Partners LP (MEMP) intends to provide.
Investor Presentation. 2 Cautionary Statement This presentation contains “forward-looking information” which may include, but is not limited to, statements.
1 Presented By: Neil McMillan President & CEO Q1 Financials May 14, 2012.
Black Box Corporation Overview. Black Box Corporation 2 Forward-Looking Statements - Any forward-looking statements contained in this presentation are.
NIUMINCO GROUP LIMITED. Important Information This presentation is not a prospectus nor an offer of securities for subscription or sale in any jurisdiction.
August DISCLAIMER The following information contains, or may be deemed to contain, “forward-looking statements” (as defined in the U.S. Private.
SAFE HARBOR Certain statements contained in this presentation regarding Rick's Cabaret future operating results or performance or business plans or prospects.
Wowo Gap Nickel Laterite Project PNG Niugini Nickel Limited 100% Subsidiary of Resource Mining Corporation 1.
Project preparation and appraisal. Preparation of project report and appraisal are intimately tied up.
Natural Resource Partners L.P. A Successful Growth Story UBS Investor Meetings Las Vegas, Nevada September 18, 2007.
BROKER PRESENTATION December Disclaimer & Confidentiality Notice  The information contained in this Presentation or subsequently provided to the.
Natural Resource Partners L.P. SMH Capital Investor Growth Conference New York, NY November 8-9, 2007.
2012 NORTHEAST BRITISH COLOMBIA COMMUNITY COAL AND ENERGY FORUM Ann Marie Hann President, Coal Association of Canada OCTOBER 11, 2012.
March Slide 1 Opportunities Exist The Region Is Vast, Under Explored And Undeveloped –Remote –Historical Lack Of Funds For Exploration Exploration.
Western Financial Group Q Financial Results Conference Call November 16, 2009.
Annual Results Presentation 27 August 2009 Jacob Maroga – Chief Executive Empowering the South African dream.
Wachovia Capital Markets Seventh Annual Pipeline and MLP Conference New York, NY December 9, 2008.
Health Net, Inc Annual Meeting of Stockholders Jay M. Gellert President and Chief Executive Officer May 3, 2001.
TELUS forward looking statements This session and answers to questions contains forward-looking statements that require assumptions about expected future.
Vogtle Nuclear Plant Update Moderator: Honorable Greg White, Michigan Panelists: Honorable Lauren “Bubba” McDonald, Georgia Public Service Commission Buzz.
Presentation Disclaimer Forward Looking Statements  This presentation may contain certain forward looking statements and projections regarding:  estimated,
Overview November Safe Harbor Statement ♦Some of the statements included herein may include forward-looking statements which reflect our current.
FOURTH QUARTER AND YEAR END 2012 RESULTS. The following is a Safe Harbor Statement under the Private Securities Litigation Reform Act of 1995: This press.
First Quarter 2013 Earnings Conference Call April 18, 2013.
Oppenheimer Industrial Growth Conference May 14, 2014.
Fourth Quarter / Full Year Earnings 2008 Kimberly Ross Chief Financial Officer March 2, 2009.
Endurance Insurance Operations Michael P. Fujii President & CEO Worldwide Insurance Operations Bermuda in Boston Conference September 18, 2007.
THIRD QUARTER 2012 RESULTS.  Year-over-year revenue growth of 5.5% to $32.0 million, at the high end range of guidance  Adjusted fully diluted EPS of.
FOURTH QUARTER AND FULL YEAR 2013 RESULTS March 13, 2014.
TRANS-SIBERIAN GOLD PLC 30 June 2016 Annual General Meeting TRANS-SIBERIAN GOLD.
Integrity. Commitment. Performance.™ PMA Financial Planning Program Howard Crouse, Vice President PMA Financial Network, Inc. March 17, 2014 El Paso-Gridley.
Western Financial Group Q Financial Results Conference Call November 13, 2006.
Developing a Canadian Gold Deposit
Q Earnings Call.
Blueberry.
Manaila Polymetallic Mine
Presentation transcript:

Uranium exploration and development in the heart of Niger’s uranium-producing district  Niger is a major uranium producer since the 1970’s, currently 8% global supply  Established NI uranium resources, 122 million pounds and growing  Experienced, professional team, based on 100% local workforce with internationally-based uranium and mining industry experts  Madaouela Project economic viability confirmed by IDP  Considerable exploration upside on 1,596 km 2 of licenses within Niger’s uranium producing district This document includes certain “forward-looking statements”. All statements other than statements of historical facts, are forward looking statements that involve various risks and uncertainties. Statements relating to “resources” are deemed to be forward-looking statements, as they involve the implied assessment, based on certain estimates and assumptions, that the resources described can be profitably produced in the future. There can be no assurances that such statements will prove accurate and actual results and future events could differ materially from those anticipated in such statements. Such information contained herein represents management’s best judgment as of the date hereof based on information currently available. The company can not guarantee future results, levels of activity, performance, or achievements. The company does not assume the obligation to update any forward-looking statement. Govind Friedland Executive Chairman Pierre Massé Chief Financial Officer Daniel Major Chief Executive Officer Aminou Boukary Country Manager, Niger AREVA’s Somair Mine, 15 kilometres from Madaouela The Republic of Niger Uranium Country  +40 years of continuous uranium production >110,000 tonnes  World’s 6 th largest uranium-producing nation, accounting for 8% of total production  Uranium sales account for majority of Niger’s export revenue  2006 Mining Law encouraging foreign direct investment  Transparent permitting processes  Existing mining infrastructure available for the development of new mines, lowering capital costs GoviEx is a private uranium-focused exploration and development company with 7 tenements covering approximately 1,596 square kilometres of exploration ground in Niger. Building on exploration work performed in the 1960's by the French, Japanese and Nigerien governments and utilizing the skills and experience that developed Areva's mines nearby, GoviEx is conducting one of the world’s largest ongoing uranium exploration programs, focused on the Madaouela and Anou Mellé tenements, located in the world-class uranium-producing Arlit District. To date GoviEx’s technical team has completed one of the worlds largest exploration programs on the Madaouela Projects’ seven deposits. GoviEx has maintained strong environmental and social standards. This includes support for local communities and a strong commitment to employee Nigerien staff in all roles and Nigerien contractors where ever possible. New GoviEx permanent camp at Madaouela New GEFCO drills at GoviEx warehouse in Niger Field reconnaissance Currently utilizing 100% Niger local labor

In March 2011 GoviEx presented a Preliminary Economic Assessment that indicated that the Madaoeula Project could be developed economically. GoviEx completed an Integrated Development Plan (IDP) in September 2013, and results to date from the study have underscored the economic potential of the Project. The IDP examined additional metallurgical testing, processing options, conceptual mine design, including geotechnical and hydrological studies. Capital and operating costs estimates in the study have been based predominantly on quotation to improve the integrity of the resulting economics. The IDP considers the development of the Marianne-Marilyn, MSNE and Maryvonne deposits by underground room and pillar mining, and the Miriam deposit as an open pit. Ore processing will include radiometric ore sorting and ablation to upgrade plant feed grades prior to two stage tank acid leaching and solvent extraction. Tailings material will be dry stacked to ensure international environmental standards are achieved. Environmental impact studies are well advanced. The proposed base case envisions an average 2.53Mlb per year U 3 O 8 yellowcake production rate, and an 83.0% ultimate recovery; generating a twenty one year mine life producing 45.6Mlb of U 3 O 8. Based on a long term uranium price of US$70/lb U3O8 the project generates an after-tax NPV of US$251m at an 8% discount rate, with an IRR of 21.9%. Initial capital costs are estimated at US$339m, and cash operating costs of US$26.39/lb U3O8, excluding royalty payments. Madaouela Project Resources March 2013 Integrated Development Plan confirms project viability Classification NI compliant Tonnage (Mt) Grade (kg/t eU 3 O 8 ) eU 3 O 8 (t) eU 3 O 8 (Mlb) Total Measured , Total Indicated , Total Inferred , Immediately adjacent to the Madaouela Uranium Project are the Somair open pit mine and Cominak underground mine, both Areva subsidiaries, and have operated uninterrupted since the 1970s. Arlit mining district has well developed infrastructure. Arlit and Akokan have over 100,000 people supporting local mining operations with airport, drilling, transport companies, electricity, potable water and a hospital. Arlit is connected to the Southern part of Niger via the so- called “uranium-highway.” A power line connects the mine towns to the Sonichar coal- fired power station located North of Agadez. GoviEx’ seven exploration licenses cover approximately 1596km 2. Since 2008 GoviEx has completed over 550,000m of exploration drilling, predominately on Mad 1, resulting in definition of 122Mlb of total resources. Deposits for underground mining include Marianne-Marilyn, MSNE and Maryvonne. These 100m deep near flat sandstone hosted tabular deposits span several kilometres in plan, and average deposit thickness about 1m. Miriam open pit deposit, is approximately 1km in strike and average deposit thickness of 20m. GoviEx’s exploration program is focusing on high-priority targets within the remaining 70% of the exploration licenses held by GoviEx further south and on trend with existing discoveries and other producing U mines in the Arlit district. Proposed Process Plant Layout