MWM – Martinek Water Management GmbH Mozartstraße 23 A – 6845 Hohenems Austria Tel.:+43 5576 75510 Fax :+43 5576 78170 E – Mail Internet.

Slides:



Advertisements
Similar presentations
Cool new cameras and mini-domes from Baxall.
Advertisements

CLOSED CIRCUIT TELEVISION (CCTV) SURVEILLANCE SYSTEMS
Step 1: Digging a Cellar On land, a majority of wells begin with digging a cellar from three to fifteen feet in depth. The purpose of a cellar is to align.
Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
Using three IR sensors, SensingBot can sense the front obstacles so it can avoid them. Sensing.
The Best Solution for CIPP American Made, American Support Introducing America’s First UV Cured Fiberglass CIPP.
This is how we can help:  Avoid Risk of pollution  Trade effluent management  Generate good publicity  Protect your business and environment  Global.
REMOVE AND INSTALL THERMOSTAT AND TEST OPERATION CS4 A.1 D.6 P-5/6.
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
Finally, a compressed air piping system so simple…it’s EZ!
When the floors are in position they are left a few weeks to dry. Meanwhile various tradesmen can start to put the finishing touches to the building, both.
EMI Systems Limited specializes in CCTV surveillance systems that ranges from stand-alone cameras to fully integrated security control centers and to the.
|0 THE SKINNER COMPANY PRODUCT REVIEW
Fiber Distribution Point for Underground VSOF-CS403A-SD Connector type Fiber Distribution Point.
BOB BROZ UNIVERSITY OF MISSOURI EXTENSION (573) ISE #78 WATER MANAGEMENT STRATEGIES FOR DROUGHT MITIGATION AND SUSTAINABLE AGRICULTURAL PRODUCTION.
Sensitivity of leak recognition by the WLM-SYSTEM Noise development of leak Slight pressure change Flow direction change.
PEUGEOT 206 INSTALLATION 99’— 05’ TU5JP4
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
Introduction Conduits, general Contact to SGB Conduit Plan Grounding Place to mount Pedestal Measurem. A/1 Issue 1.3 SGB LEAK PREVENTION SYSTEM SGB GmbH.
IMMOBILE ACCESS FLOOR SYSTEM  The immobile access floor system is a product which is suitable for different official places. The material.
RECORDING WATER TABLE DYNAMICS T & D Project No. 1E11EM35 USDA FOREST SERVICE Technology & Development Center 444 East Bonita Avenue San Dimas, CA
Problems, and how to solve them. By Alex Gauthier and Daymian Hogue.
By Norman Bartlett Creative Sensor Technology 1. Irrigator’s View of Landscape Irrigation “ We are beautifying the world” Public’s View “You are wasting.
Water Level loggers Vented vs Absolute. Definitions Absolute: Measures total pressure (weight) above the sensor. Atmospheric pressure must be removed.
Page 1 © 2008 IDEAL INDUSTRIES IDEAL Micro OTDR Oktober 2008 Konstantin Hüdepohl.
GST™ Leaching System Installation Manufactured under one or more of the following U.S. Patents; 7,374,670, 7,351,005, 7,309,434, 7,157,011, 6,969,464,
“Fix Tube Sheet” Heat Exchanger
F. 1 Design and Technology
Camera Pieces in Box TV Battery Battery Charger Camera Sun shade.
1 Safety and Database Subsection ADO - PO - SA Safety achievement and future activitiesSafety achievement and future activities Database (see K. Pommes.
Proper Use of Extension Cords
1 B. Braun SpaceStation – Product details Overview Flexibility in use Typical configurations.
PREPARATIONS TOOLS : 1 、 wire stripper 2 、 coating stripper 3 、 fiber length measurement 4 、 cutter QUICK ASSEMBLY CONNECTOR 1.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 12/10/2005 LHCb - Install Meeting 12/10/05 TS/CV/DC Installations STATUS Ongoing works 1.chilled / mixed.
Smart system for water control and remote reading AMR, AMI Spik Insa
Starting in Battery Park, begin to replace necessary subway grates with elevated grates. Seal up grates that prove to be unnecessary. Repeat this process.
Company Confidential CABLOFIL ® New Products 2007 / 2008.
ELECTRICAL FIRES CAN BE PREVENTED! By PowerCheck.
The City of Mesa EFV Program Anthony Cadorin Gas Planning Engineer City of Mesa Natural Gas Division Mesa, Arizona.
ANCIT WORKSHOP Torino, March 1998 Optical Network Construction in Customer Premises by Sadaaki TAKANO NTT Access Network Systems Laboratories.
Strategic Marketing ICU&OR Systems Nov 13, 2003 Chapter Sales Manual B.Braun Space Chapter 5.3  Overview  Flexibility in use  Typical configurations.
1 Safe Rider Personal Tracker and Companion Presented by: Safe Rider Vehicle Technologies (Pty) Ltd 11 Thom Street, Benoni, South Africa Tel
Backflow Preventer Replacement Made Easy BY: Kenny Robbins.
Our goal is to innovate and to push the boundaries of the industry - and now you can reap those rewards! The first ”real” Plug and Play sensor for the.
PILOT PROJECT ON NRW IN SHEETAL PARK AREA OF RAJKOT CITY IN GUJARAT Danish Water Forum AND Rajkot Municipal Corporation.
Connecting to industry. Hose Coupling Safety The cover of a hose is intended to protect the reinforcement members. If the protective cover is compromised,
When all the walls have been coated with Carlite finish and dried the plumbers can return to fit all the necessary pipe work and the radiators. Then a.
Presented BY BEISecurity. Fiber-Optic Perimeter Intrusion Detection System.
Scorpion is a remote tester specifically designed for testing ASD systems. Scorpion is compatible with the FAAST aspirating smoke detector. It is particularly.
Overview Rationale Funding Phased Plan Leak Control Program Other Aspects Next Steps.
Ultramag ultrasonic complex
Tips on how to install irrigation systems
Easy centering and setting system
Extrima ex-certified Hydrogen Leak detector
Service channels between Tracker and PP1
DCS: Temperature Probes
Safety Rules to Consider for Water Well Drillers
Integration issues at IHEP
site: 5 CHAPTER -End cap Kingdom of Saudi Arabia. P.O Box: 62676, Riyadh Tel: Fax:
HIGH PERFORMANCE PRESSURE SYSTEMS.
HBLT-wire Product Introduction September 21, 2018.
THE SKINNER COMPANY Product Review
ADAGIO.
Motorization Site and Troubleshooting Tips
Floating Head Heat Exchanger
Ultrasonic Flowmeter Technology
RECORDING WATER TABLE DYNAMICS T & D Project No. 1E11EM35
After service guide for changing PCB
Productdevelopment TVE / RG22
By: David Mitchem, Matt Moffit
Presentation transcript:

MWM – Martinek Water Management GmbH Mozartstraße 23 A – 6845 Hohenems Austria Tel.: Fax : E – Mail Internet : Reducing water loss sustainable … Network survey and leak zone detection … Detecting leaks immediately... WLM - SYSTEM

Cost effective chamber installation Installation without any interruption Manufactured by HAWLE Armaturen GmbH Easy installation and dismantling No chamber necessary; just a street cap

Installation of a pipe saddle Installation like a house connection Use a 38mm driller

Installation of the covering pipe This part is available in length from 1 to 2,5 m (extra sizes possible) Length can be cut on site adapt to the local situation

Installation of WLM-Sensor Cable will be put through the extension of the sensor and plugged to it. (all connections are IP68 up to 10m) The extension can also be cut on site to the needed length

Top of the extension Everything will be covered to avoid water entrance A clamp ring will be fixed on the extension for the right depth of the sensor in the pipe

Install the sensor under pressure A special tool will be used to install the sensor under pressure Safety has first priority! Installation is finished

Only a small street cap Only a small street cap will be on the top Highly vandalism protected!

WLM-System Connection to a street light Installation in a street cap: 12 V charger, modem battery. Aerial at the top of a street light Up to ca. 15 m