IB stave assembly A. Di Mauro, C. Gargiulo, J. Van Beelen ITS-MFT mini-week 12.03.2014.

Slides:



Advertisements
Similar presentations
Step-by-step assembly instructions
Advertisements

Status of Al-FPC development for IB A. Di Mauro, A. Junique, P. Riedler ITS-MFT mini-week
Alice ITS L5,6 Integration 1 End wheels and local services design – services layout on the end wheels: patch panels, routing, cooling and qualification.
P. Béné, F. Cadoux, A. Clark, D. Ferrère, C. Husi, M. Weber University of Geneva IBL General Week - 11, 12 February 2010 IBL Stave Loading Status Summary.
Lifter Step-by-step assembly instructions (c) 2010 National Fluid Power Association.
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 Stave.
Status Update on Mechanical Prototype in Rome November 6,
Chapter 27: Workholding Devices for Machine Tools
ATLAS IBL Tool for gluing flex on omega C.Bault/FX Nuiry - IBL Stave Meeting - UniGe August 31st Process description This tool has been designed.
Stave loading with Si-heaters at UniGe with jigs v-1 August 2011 Maarten, Coralie, Franck, Didier.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
Automated HIC assembly A. Di Mauro ITS-MFT mini-week
IBL Mock Up IBL Mock Up MANUFACTURING 2011/04/29 François-Xavier NUIRY Maxence CURDY Andrea CATINACCIO CERN PH/DT/PO 1.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
Tooling and assembly of US stavelet at Berkeley S. Díez Cornell, C. H. Haber, M. Defferrard, R. Witharm Sept 6th, 2012 Berkeley mechanical meeting, 5th-7th.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Hybrid Integrated Circuit
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Update on tendering for HIC automatic assembly system A. Di Mauro ITS Upgrade Plenary,
, T. Tischler, CBM Collaboration Meeting, GSI Status MVD demonstrator: mechanics & integration T.Tischler, S. Amar-Youcef, M. Deveaux, D. Doering,
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
, T. Tischler, CBM Collaboration Meeting, Split Status MVD Demonstrator: System Integration T.Tischler, S. Amar-Youcef, M. Deveaux, D. Doering,
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
Stave Module Status Tony Affolder The University of Liverpool On behalf of cast of thousands… ATLAS Upgrade Week November 10,
Dummy and Pad Chips Needed for various activities (interconnection tests, mass tests, assembly,…) Production of masks, processing, thinning and dicing.
Silicon /pcb assembly R Thompson, J Freestone LAL 3 June 08.
WP6 meeting 30/07/2013. Status of flex prototypes production New laser soldering tests Discussion on mass production schedule.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
MM detector construction One or several modules per sector considerations.
Status of GEM T2 assembly Outline Status of the GEM components Summary Tests TOTEM Collaboration meeting CERN / Risto Orava for Kari Kurvinen.
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 StaveMarco Kraan Paul Kuijer.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
WP6 status report A. Di Mauro (CERN) ITS plenary meeting
Low Mass Rui de Oliveira (CERN) July
Hybrid Mechanical/Thermal Design Ray Thompson / Manchester FP420 meeting Torino 11/12 July 06.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
David Bailey Gluing. Silicon /pcb assembly Previously Using Sony Robot and precision dispenser Have established acceptable glue dot parameters Dot electrical.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
G.Barber/Peter Cooke: Mechanical Design Update Imperial 22 July Mechanical Update for Tracker workshop Contents:- New Station Layout Light Guide.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
The Development of the Fabrication Process of Low Mass circuits Rui de Oliveira TS-DEM.
GEM Foil Development at ECIL
WP3_Bham; 29May 2014; John Wilson1 Heated plate curing Tests with 130nm hybrids and glass ASICs the glue thickness is controllable. i)Room temp curing.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
WP7&8 Progress Report ITS Plenary meeting, 10 June 2014 LG, PK, VM, JR.
SEPT 20, 2006 T. Brown, M. Cole, P. Fogarty, P. Goranson, K. Freudenberg, D. Williamson NCSX STAGE 2 COIL TO COIL ASSY.
VEA’s proposal of automated assembly system WP6 meeting, 16/01/14.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
FP420 Hybrid Mechanical Design Ray Thompson / Manchester Manchester Xmas O7 Ray Thompson Julian Freestone, Andy Elvin.
Sentek Technologies Joining EnviroSCAN Probes. Probe Components 20-way probe cable connector (special order) Cable spacer (Part No 80015) Probe rods Probe.
B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Ladder Assembly - Conceptual design of jigs -
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
New single-chip “box” to test laser soldering in vacuum WP6 meeting, 16/01/14.
Thoughts about PS module assembly Ulrich Heintz, Meenakshi Narain, Bill Patterson, Eric Spencer, Juan Trenado Brown University, Providence 4/16/2015Heintz,
ATLAS pixel module assembly flow
Update on Pavia MM mechanical prototype
Ladder Assembly All tools and jigs produced Glue dispensing works
Ladder Assembly All tools and jigs produced Glue dispensing works
ob-fpc: Flexible printed circuits for the alice tracker
WP9 ITS Mechanics and Cooling
Costruzione dello stave 0 e preparazione per produzione stave OB
F. Ronchetti, INFN-LNF, September
Module/Ladder Assembly
Cryomodule Assembly Plan
Pixel module assembly tooling
Presentation transcript:

IB stave assembly A. Di Mauro, C. Gargiulo, J. Van Beelen ITS-MFT mini-week

TDR procedure 12/03/20142ITS-MFT mini-week - IB stave - A. Di Mauro Main steps: HIC assembly + HIC gluing on C-fibre support

TDR procedure HIC assembly by laser ball soldering – Tooling: vacuum table (A) to hold chips (with x,y,z micrometric adjsutment), vacuum table (B) to hold FPC, soldering macor grid with conical holes ( ), ball pick-up 12/03/20143ITS-MFT mini-week - IB stave - A. Di Mauro A B A B INFN BARI

HIC assembly by laser ball soldering 1.Nine chips are placed above the vacuum table A and precisely aligned with respect to each other 2.The FPC is placed above the vacuum table B and held in a position defined by reference pinholes 3.The FPC is aligned with respect to the subjacent array of chips by matching the holes with the connection pads on the chip surface 4.The soldering grid, aiming to gently press the FPC against the chip, is placed above the stack-up and aligned with respect to the holes in the FPC 5.The loaded ball pick-up tool is aligned above the stack-up corresponding to the first chip and overlapped to the soldering grid; then the balls are released 6.The laser soldering of each connection is performed in sequence 7.The last four steps are repeated to connect all remaining chips and complete the HIC 8.Electrical tests and metrology of chips positions 12/03/2014ITS-MFT mini-week - IB stave - A. Di Mauro4 TDR procedure

HIC gluing on C-fibre support – No details were provided 12/03/2014ITS-MFT mini-week - IB stave - A. Di Mauro5 TDR procedure

Procedure update Optimization of laser soldering – Insulation of chips from aluminium vacuum table (acting as heat sink) using a thin macor plate – Soldering under N 2 /H 2 (95/5) mixture + gas exhaust holes – Soldering under vacuum 12/03/2014ITS-MFT mini-week - IB stave - A. Di Mauro6

Procedure update 12/03/2014ITS-MFT mini-week - IB stave - A. Di Mauro7 gas exhaust hole Solder mask Chip Polyimide Copper Solder mask Ball Ø 200 µm +/- 8 µm Hole Ø 200 µm ± 10 µm FPC pad Ø 400 µm + (10 to 16 µm) FPC antipad Ø 600 µm + (10 to 15 µm) 10 µm 25 µm 50 µm 25 µm 10 µm 50 µm

Procedure update 12/03/2014ITS-MFT mini-week - IB stave - A. Di Mauro8 Soldering under vacuum Advantages wrt to N 2 /H 2 : -No exhaust holes -Environmental conditions for soldering: faster and reproducible

Further considerations (apparently not inter- correlated): Al sputtering done in batches of 50x150 cm: try to maximize no. of FPCs fitting in such a surface Safe handling of HIC during all phases Ensure repeatability of chips alignment FPC holes’ position accurate “enough”, spread compensated by larger chip pads (to be verified) 12/03/20149ITS-MFT mini-week - IB stave - A. Di Mauro Procedure update

Al-FPC layout under study 12/03/2014ITS-MFT mini-week - IB stave - A. Di Mauro10 -Double no. of FPCs in each foil -Easier cutting of extra material (wings) at the end of stave assembly

FPC/HIC frame 12/03/ Frame holding FPC from soldering until stave assembly: easier handling possible protection with additional lids The frame (FPC) has pinholes (targets) to be used as reference for placement/alignment during the various phases The same pinholes (or additional ones) match pinhole in the C-fibre connectors

Reviewed procedure 1)Mount FPC on frame using reference pinholes 2)Place chips on vacuum table and align with respect to reference pinholes (on table) matching those of the frame 3)Overlap soldering grid to FPC 4)Release soldering balls inside the grid using the pick-up tool (for all chips) 5)Fix lid and start vacuum 6)Laser soldering of 9 chips 7)Electrical test + metrology of HIC (final position of chips wrt to frame pinholes) 8)Glue HIC on C-fibre support using jig with pinholes in connectors 9)Final metrology to transfer chips position to external target (details to be worked out) 12/03/2014ITS-MFT mini-week - IB stave - A. Di Mauro12