Project Management Software Tools Cheryl A. Wilhelmsen Lee Ostrom.

Slides:



Advertisements
Similar presentations
Work Breakdown Structures
Advertisements

Chapter 3 Managing the Information Systems Project
© 2005 by Prentice Hall Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer Joey F.
Advanced Project Management - CPH
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
© 2008 by Prentice Hall 3-1 ITCS311 Systems Analysis and Design Dr. Taher Homeed Feb 2010 Department of Computer Science College of IT University of Bahrain.
Project Time Management
Importance of Project Schedules
1. Henry Laurence Gantt, A.B., M.E. ( November 1919) was a mechanical engineer and management consultant who is most famous for developing the.
Chapter 3 Managing the Information Systems Project
Project Time Management
Project Management and Scheduling
Copyright © Software Process Group 1 Software Process Group Microsoft Project Tutorial Steve Meyers
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
OPSM 639, C. Akkan SAVE your existing MS Project File at the end of PART3 as _PART4 _PART4 WITH BASELINE. Make sure you keep the original file without.
USING MS PROJECT 2010 Project management software programs such as Microsoft Project 2010 can be used for developing the project schedule and budget, and.
Earned Value Analysis by John Cornman. Introduction “Earned Value Analysis” is an industry standard way to measure a project’s progress, forecast its.
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
Project Management Methodology Project monitoring and control.
HIT241 - TIME MANAGEMENT Introduction
© 2006 ITT Educational Services Inc. System Analysis for Software Engineers: Unit 5 Slide 1 Chapter 3 Managing the Information Systems Project.
Chapter 3 : Managing the Information Systems Project.
Abeer Bin Humaid. Project management is “the application of knowledge, skills, tools, and techniques to project activities in order to meet project requirements”
© 2005 by Prentice Hall 3-1 Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition.
Evaluation#3 MS Project Objectived u In this lab you will learn: – how to add the resources into tasks. –How to review resource assignment information.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Appendix A Project Management: Process, Techniques, and Tools.
POST GRADUATE PROGRAM OF INFORMATION TECHNOLOGY
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 4 Project Integration Management.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
MS project Abeer Bin Humaid. What is project management? Project management is “the application of knowledge, skills, tools, and techniques to project.
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
TA. MARAM AL-KHAYYAL NET481 MS Project Overview. Outline Introduction to project management.  Project 2007 can help you manage project time, resources,
Software Project Management Lecture # 7. What are we studying today? Chapter 24 - Project Scheduling  Effort distribution  Defining task set for the.
BIS 360 – Lecture Two Ch. 3: Managing the IS Project.
Lecture 7. Review of Lecture 6 Project Scheduling: The process of defining project activities, determining their sequence, estimating their duration Scheduling.
1 L U N D S U N I V E R S I T E T P rojektledning och Projektmetodik.
Ahmad Al-Ghoul. Learning Objectives Explain what a project is,, list various attributes of projects. Describe project management, discuss Who uses Project.
EARNED VALUE MANAGEMENT (EVM)
10/19/ :26 AM 1 Project Cost Control. 10/19/ :26 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
Project Management Part 6 Project Control. Part 6 - Project Control2 Topic Outline: Project Control Project control steps Measuring and monitoring system.
Chapter 6: Project Time Management Information Technology Project Management,
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
Advanced Project Plan Tracking Lesson 15. Skills Matrix SkillsMatrix Skill Record actual start, finish, and duration values of tasks Enter actual start.
Applied Software Project Management PROJECT SCHEDULES Applied Software Project Management 2:16:07 AM 1.
Office Management Tool - II Institute of Management Sciences Muhammad Shahzad Ali Lec 7: Introduction to MS - PROJECT L E C T U R E 7 INTRODUCTION TO MS.
MS Project 2000 / 2003 Luke E. Reese Biosystems and Agricultural Engineering September 17, 2009.
Microsoft Project Tutorial Jesal Bhuta
Chapter 3 Managing the Information Systems Project
Office Management Tool - II Institute of Management Sciences Muhammad Shahzad Ali Lec 8: Introduction to MS - PROJECT L E C T U R E 8 INTRODUCTION TO MS.
Project Plan Tracking – Fundamentals Lesson 8. Skills Matrix SkillsMatrix Skill Establish a project baseline Track a project as scheduled.
Project Time Management
Microsoft Project Tutorial for CSCI 577 Fall 2006 Jesal Bhuta
Microsoft Project 2010 ® Tutorial 1: Planning a Project.
Introduction To Earned Value November 14, Definition Earned Value is a method for measuring project performance. It compares the amount of work.
Microsoft Project 2010 ® Tutorial 5: Tracking Progress and Closing the Project.
Where Module 04 : Knowing Where the Project Is 1.
© 2008 Prentice HallAppendix A -1 Introduction to Project Management Appendix Microsoft Project Tutorial Information Systems Project Management: A Process.
Agenda ‒ Cost Management ‒ Cost Budgeting ‒ Cost Control Learning Goals 1.Cost Control 2.Earned Value Management.
Project Management – PTM721S
TOPIC-8B- PROJECT COST CONTROL
5. Cost resources & PLAN DURATION
Project Time Management
PROJECT MANAGEMENT Bill Biddle.
5. Cost resources & PLAN DURATION
MGT 605: CH-13 Progress and Performance Measurement and Evaluation
Importance of Project Schedules
Presentation transcript:

Project Management Software Tools Cheryl A. Wilhelmsen Lee Ostrom

Welcome to Project Management Software Tools  Basic Administrative Details  Introductions  Course Syllabus  Projects

Course URL

Does this look familiar?

Look at the difference after taking this class

Terms  Activity – An element of work performed during the course of a project. An activity normally has an expected duration, an expected cost, and expected resource requirements. Activities are often subdivided into tasks.  Actual Cost of Work Performed (ACWP) – Total costs incurred (direct and indirect) in accomplishing work during a given time period.

Terms  Actual Finish Date (AF) – The point in time that work activity ended on an activity.  Actual Start Date (AS) – The point in time that work actually started on an activity.

Terms  Bar Chart – A graphic display of schedule- related information. In the typical bar chart, activities or other project elements are listed down the left side of the chart, dates are shown across the top, and activity durations are shown as date-placed horizontal bars. Also called a Gantt Chart.

Terms  Budgeted Cost of Work Scheduled (BCWS) – The sum of the approved cost estimates (including any overhead allocation) for activities scheduled to be performed during a given period.

Terms  Budget at Completion (BAC) – The estimated total cost of the project when done.  Budgeted Cost of Work Performed (BCWP) – The sum of the approved cost estimates (including any overhead allocation) for activities completed during a given period.

Terms  Control – The process of comparing actual performance with planned performance, analyzing variances, evaluating possible alternatives, and taking appropriate corrective action as needed.

Terms  Cost Variance – (1) Any difference between the estimated cost of an activity and the actual cost of that activity. (2) In earned value, BCWP less ACWP.

Terms  Critical Path – In a project network diagram, the series of activities which determines the earliest completion of the project. The critical path will generally change from time to time as activities are completed ahead or behind schedule.

Terms  Current Finish Date – The current estimate of the point in time when an activity will be completed.  Current Start Date – The current estimate of the point in time when an activity will begin.

Terms  Earned Value (EV) – A method for measuring project performance. It compares the amount of work that was planned with what was actually accomplished to determine if cost and schedule performance is as planned.

Terms  Estimate At Completion (EAC) – The expected total cost of an activity, a group of activities, or of the project when the defined scope of work has been completed.

Terms  Estimate To Complete (ETC) – The expected additional cost needed to complete an activity, a group of activities, or the project.  Float – The amount of time that an activity may be delayed from its early start without delaying the project finish date.

Terms  Program Evaluation and Review Technique (PERT) – An event-oriented network analysis technique used to estimate project duration when there is a high degree of uncertainty with the individual activity duration estimates.  Resource Leveling – Any form of network analysis in which scheduling decisions (start and finish dates) are driven by resource management concerns.

Terms  Resource Planning – Determining what resources (people, equipment, materials) are needed in what quantities to perform project activities.  Scheduled Variance (SV) – Any difference between the scheduled completion of an activity and the actual completion of that activity.

Terms  Work Breakdown Structure (WBS) – A deliverable-oriented grouping of project elements which organizes and defines the total scope of the project. Each descending level represents an increasingly detailed definition of a project component.

What is Project Management  Project management is the process of planning, organizing, and managing tasks and resources to accomplish a defined objective, usually within constraints on time, resources, or cost

Project Plan  A project plan can be simple, for example, a list of tasks and their start and finish dates written on a notepad  Or it can be complex, for example, thousands of tasks and resources and a project budget of millions of dollars

Project Plan  Most projects share common activities, including breaking the project into easily manageable tasks, scheduling the tasks, communicating with the team, and tracking the tasks as work progresses. And all projects consist of three major phases: 1 Build the plan 2 Track and manage the project 3 Close the project

How Microsoft Project Schedules  It takes into account many factors, including task dependencies, constraints, and interruptions, such as holidays or vacation days  Most importantly, Microsoft Project schedules each task using the formula duration=work/resource effort

Schedule Terms  Duration is the actual amount of time that passes before the task is done  Work is the effort required over a period of time to do the task  Resource effort is the amount of effort resources are assigned to the task and their allocation

Example  For example, if: Three painters work two days on a task, with an effort of 8 hours per day, the work for each resource is 16 hours: (2 days * 8 hours) The total effort of the resources is 24 hours per day: (3 painters * 8 hours) The total work for the task is 48 hours: (2 days * 8 hours * 3 painters)

Example (cont) The duration is 2 days: 48 hours / (3 painters * 8 hours)  Understanding this formula is important to understanding how changes you make to tasks affect the project schedule

Create a Project Plan  When you have defined project goals and thought out the major phases of your project, it's time to begin creating your plan  We will Enter Key Project Information, and Set up the Project Calendar

Create a New Project Step by Step 1) Click New 2) In the Project Information dialog box, type or select a start date or a finish date for your project, and then click OK 3) Click Save 4) In the File name box, type a name for your project, and then click Save

Enter Key Project Information 1) On the File menu, click Properties, and then click the Summary tab 2) Enter any information you’d like about your project, such as the people who will manage it and maintain the project file 3) Click OK

Set Up The Project Calendar 1) On the View menu, click Gantt Chart 2) On the Tools menu, click Change Working Time 3) Select a date on the calendar To change one day of the week for the entire calendar, for example, to have Fridays end at 4:00pm, click the abbreviation for that day at the top of the calendar

Set Up The Project Calendar (cont) To change all working days, for example, to begin working days Tuesday through Friday at 9:00am, click the abbreviation (such as T for Tuesday) for the first working day of the week. Hold down SHIFT, and then click the abbreviation for the last working day of the week (such as F for Friday) 4) Click Nonworking time for days off, or Nondefault working time to change the hours worked

Set Up The Project Calendar (cont) 5) If you clicked Nondefault working time in step 3, type the times you want work to start in the From boxes, and the times you want work to end in the To boxes 6) Click OK

Assignment  Complete lesson 2 in the textbook  Decide on the project each of you will complete by the end of the course, and it to me