Transportation Research Board 2004 Annual Meeting Adaptive Signal Control Workshop Session 2: Field Experience January 11, 2004.

Slides:



Advertisements
Similar presentations
Eric Graves, P.E. City Traffic Engineer Alpharetta, Georgia
Advertisements

PARK IT HERE! Real-Time Parking Information in Uptown Charlotte PARK IT HERE! Real-Time Parking Information in Uptown Charlotte Presenters: Cole Dagerhardt.
Development of the JFK Airport ITS Master Plan ITS America Annual Meeting & Expo: Session 24 From Tarmac to Take-off: ITS Deployment in Aviation June 5,
.nowNAZTEC 1. Overview AGENDA Benefits Algorithm Simulation 2 Case Studies Real-time adaptive traffic control system Adjusts signal timing based on current.
1. We can’t promise all green lights… …but we can minimize the number of red lights, stops and delays.
Siemens – Local Controller Software with Adaptive Control
Network+ Guide to Networks, Fourth Edition
1 Charlie Wetzel, PE, PTOE County Traffic Engineer Seminole County Florida 10/18/11.
The Facts are In… updated >. Understand how it works See the results data Compare to other options Understand the investment.
Presented by: SAGE KAMIYA, P.E., PTOE
INNER CITY INVESTMENT SUMMIT TRANSPORT, INTEGRATED PUBLIC TRANSPORT NETWORK AND TRAFFIC MANAGEMENT Presenter: L N Mangcu SED: Transport and Roads Department.
Consolidation Commission - Transportation Sub-Committee City of Orlando Signalization Presentation September 8, 2005.
Understand Virtualized Clients Windows Operating System Fundamentals LESSON 2.4.
Network+ Guide to Networks, Fourth Edition Chapter 1 An Introduction to Networking.
Gainesville Area Traffic Management System. Traffic Management System  In 1984, the original Traffic Signal Master Plan was developed for the Gainesville.
San Jose Traffic Signal Communications and Synchronization Project Presented by Ho Nguyen City of San Jose, Department of Transportation May 12, 2009.
Transit Priority Systems (TPS) Chun Wong, P.E. City of Los Angeles, Department of Transportation T3 Webinar.
Phoenix International Raceway (PIR) Presented By: Nicolaas Swart Traffic Engineering & ITS Program Manager Maricopa County DOT April 26, 2006 Presented.
3rd Street Light Rail Process and Challenges of Developing Transit Signal Priority Javad Mirabdal, Jack Fleck & Britt Thesen Department of Parking and.
Florida Department of Transportation District 4 TSM&O Program Advanced Transportation Management System (ATMS) Installation in South Broward County ATMS.
Signalized Intersection Delay Monitoring for Signal Retiming SafeTrip-21 Safe and Efficient Travel through Innovation and Partnership in the 21 st Century.
RT-TRACS A daptive Control Algorithms VFC-OPAC Farhad Pooran PB Farradyne Inc. TRB A3A18 Mid-Year Meeting and Adaptive Control Workshop July 12-14, 1998.
Applied Transportation Analysis ITS Application SCATS.
Multimodal Corridor Plan BCC Discussion Item Transportation Planning Division August 19, 2014.
Network+ Guide to Networks, Fourth Edition Chapter 1 An Introduction to Networking.
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
Portland State University Autoscope for Dummies What can it do? What is it? The Autoscope consists of a hardware unit and accompanying software. The software.
SCATS Adaptive Traffic System
Transpo 2012 The Future of Traffic Incident Management, October 30, 2012 Javier Rodriguez, P.E., ITS Operations Engineer Joe Snyder, TMC Manager FDOT District.
TSM&O FLORIDA’S STATEWIDE IMPLEMENTATION Elizabeth Birriel, PEElizabeth Birriel, PE Florida Department of TransportationFlorida Department of TransportationTranspo2012.
Jump Starting ITS Deployment in Los Angeles County using Wireless Communications Lessons Learned.
July 29, 2009 George Saylor, PE ODOT Senior ITS Engineer.
Networks. A network is formed when a group of computers are connected together. Computers in a Local Area Network (LAN) are fairly close together, generally.
NETWORKING. OBJECTIVES Identify network topologies Identify hardware components of a network.
U.S. DOT T3 Webinar Mobile Device Technology TCRP Synthesis 91 April 10, 2012 Case Study LeeTran – Lee County, FL Mike Horsting, AICP 1.
TRAFFIC SIGNAL OPTIMIZATION: A Coordinated Effort Tom Dancey, P.E. Signal System Engineer City of Springfield CITY OF SPRINGFIELD & MISSOURI DEPARTMENT.
Implementation Transit Priority System and Mobile Internet Passenger System in the City of Los Angeles Kang Hu and Chun Wong City of Los Angeles Department.
Auto-verification of Hematology Results Using Middleware Integrated with Laboratory Information System Technical Design, Challenges, and Solutions L Dwyer,
Session 2 Equipment Requirements for Adaptive Traffic Control SCOOT Axel Reissnecker, EAGLE Traffic Control Systems, Austin, TX TRB Workshop on Adaptive.
Managing Travel for Planned Special Events: What, Why, & Benefits Walt Dunn, P.E. Dunn Engineering Associates, P.C. Talking Operations Seminar January.
Siemens Traffic Controls Ltd ITSE99/Standards 1 Traffic Management and Control Workshop on Research and Technological Development for Information Society.
ORANGE COUNTY TRAFFIC MANAGEMENT SYSTEM FEBRUARY 13, 2007.
Los Angeles County Metropolitan Transportation Authority Overcoming Multi-Jurisdictional Challenges Lessons Learned Implementing Bus Signal Priority.
Transit Signal Priority (TSP). Problem: Transit vehicles are slow Problem: Transit vehicles are effected even more than cars by traffic lights –The number.
1 Adaptive Control Software – Lite (ACS-Lite) Eddie Curtis, P.E. FHWA Resource Center / HOTM NTOC Webcast March 27, 2008.
Orange County Traffic Signal System Consolidation of Services Study Commission Meeting September 8, 2005.
Success with Miami-Dade County’s ATMS Upgrade Success with EMBEDDED INTEGRATORS Presented at: ITS America Annual Meeting Houston, Texas May 4th, 2010 by.
Traffic Flow Parameters Surface Street Application.
HOME AUTOMATION: WEB BASED CONTROL Anthony Campbell Eric Poynter EKU, Dept. of Technology Computer Electronic Networking.
SIGNAL OPTIMIZATION STUDY COMMUNITY DEVELOPMENT DEPARTMENT.
Bay County’s Intelligent Transportation System (ITS) Keith C. Bryant, P.E., PTOE Public Works Director Bay County, FL 2015 TRANSPORTATION SYMPOSIUM November.
TrainingRegister® Training Management Software Maintain Permanent Training Records for Each Individual Monitor and Track Required Training Know Who Needs.
Smart Information for a Sustainable World True Adaptive Signal Control A Comparison of Alternatives Technical Paper # Presentation to the 18 th World.
Traffic Management System Status Update February, 2008.
Update on the Escambia/Santa Rosa Regional Advanced Traffic Management System (ATMS) Feasibility and Implementation Plan Ben Faust, P.E. Advanced Traffic.
The Indiana Local Technical Assistance Program Local Agency Perspective Neal Carboneau, PE Research Manager.
1 Temporary Construction Staging Area Licensing Agreement for Peabody Hotel April 1, 2008 Orange County Convention Center.
SCATS Congestion Improvement Program. The Scope of the SCATS Congestion Improvement Program.
Active-HDL Server Farm Course 11. All materials updated on: September 30, 2004 Outline 1.Introduction 2.Advantages 3.Requirements 4.Installation 5.Architecture.
Avivim TA’s Mobility management system. Urban Mobility Management Concept Transportation objectives often conflict  Accessibility Vs. Mobility  Efficiency.
ITS Virginia Annual Conference April 20, 2012 Sensys Networks and the Sensys Networks logo are trademarks of Sensys Networks, Inc. Other product and company.
Network Topology and LAN Technologies
Adaptive Signal Control: An Agency Perspective
Constraints Space Load Capacity Costs Operating hours.
2010 Regional Intelligent Transportation Systems Plan: 2017 Progress Report on Implementation The Florida-Alabama, Okaloosa-Walton, and Bay County Transportation.
An ACSLite Case Study Riva Road in Annapolis, MD
Signalized Intersections
Transportation Research Board 2004 Annual Meeting
Presentation transcript:

Transportation Research Board 2004 Annual Meeting Adaptive Signal Control Workshop Session 2: Field Experience January 11, 2004

By: Hazem El-Assar, P.E. Orange County SCOOT System

Presentation Outline Background Challenges Potential Solutions Why SCOOT? Project Description Benefits Achieved Difficulties Faced Lessons Learned

Background Challenge #1 High Traffic Congestion Background Challenge #1 High Traffic Congestion

Background Challenge #2 Convention Center Events

Background Challenge #3 Background Challenge #3 Convention Center Expansion

OCCC Expansion Facts 3 million square foot complex: –2.1 million s.f. of exhibition space –166,050 s.f. of meeting rooms –92,000 s.f. of general assembly space –3,600 parking spaces –Total cost $748 million –Opened November 2003 MULTIPLE EVENTS UP TO 80,000 ATTENDEES EACH

OCCC New Building

Background Challenge #4 Unpredictable Tourist Traffic

Background Challenge #5 Closely Spaced Signals

Potential Solutions Free uncoordinated signals Officer traffic control TOD signal coordination Traffic Responsive Plans Adaptive Signal Control

S O O echnique plit ffset ptimization C T ycle SCOOT Adaptive Signal Control

Why SCOOT? Uses real-time upstream flow to adjust timing Better suited for high volume minor movements Widely used worldwide since 1981 Compatible with County’s existing Eagle signal controllers No need for additional field staff training More cost effective installation under current conditions

Local Controller Vehicle Detector Central Computer How SCOOT Works

Central Computer SCOOT server –DEC Alpha running VMS Operator workstations –PC running Windows –LAN connected via X-Windows emulation –Remote dial-ins via terminal servers –Interface to existing network and workstations using MONARC (now ACTRA)

Communication System Transmission Media –County-owned fiber optic on arterial streets –FDOT fiber optic on I-4 Communications Methodology –Single Mode fiber optic –Multi Mode fiber optic

Local Controllers Existing cabinets New Eagle EPAC 300 controllers with SCOOT module Dedicated communication unit SCOOT detectors

General location: International Drive International Drive Universal Boulevard Universal Boulevard Primarily Serving: Convention Center Convention Center Parking Garages Parking Garages Hotels & Restaurants Hotels & Restaurants Tourist Attractions Tourist Attractions Phase I Phase II Project Location Phase III

Project Schedule Phase I: May 2000 –7 New Signals Phase II: November 2001 –6 New Signals Phase III: October 2003 –4 New Signals –2 Modified Signals

Project Scope Replace existing controllers Install fiber optic communications Install loop detectors Provide central hardware and software Setup and validate the system Design system maps and intersection graphics Provide training to County staff

Project Costs Controller Upgrades$2,500 - $5,000/ intersection Detectors$10,000-15,000/ intersection Communications$2,500-$5,000/ intersection System Configuration,$5,000-$7,500/ Validation, Fine Tuningintersection Central Hardware/Software$50,000

Operational Benefits Achieved Convention Center traffic ingress & egress has been cleared efficientlyConvention Center traffic ingress & egress has been cleared efficiently Overall travel times and delays have been reducedOverall travel times and delays have been reduced Officer control of signals is no longer necessaryOfficer control of signals is no longer necessary Regular development and update of timing plans is not necessaryRegular development and update of timing plans is not necessary Timing adjustment during long or short term lane closures is not necessaryTiming adjustment during long or short term lane closures is not necessary Real-time traffic data are monitored and archivedReal-time traffic data are monitored and archived

Annual Cost Comparison Detectors+$1,000/intersection Support Agreement+$34,000 Central System$0 Controllers $0 Communications$0 Staff$0 Manual Traffic Control-$450,000 Net Annual Savings~$400,000

Difficulties Faced No detectors on short links Long pedestrian phases Non-flexible phasing sequence Low volume traffic conditions Non-optimal signal progression Insufficient staff experience Only remote technical support

Lessons Learned TOD plans may provide better progression for recurring traffic conditions Negative impacts may occur in low volume traffic conditions Pre-determine optimal phasing based on traffic conditions or using other software Place detectors on all lanes, if possible Avoid long pedestrian crossings

Thank You! Hazem El-Assar, P.E. Senior Engineer Orange County Traffic Engineering 4200 S John Young Pkwy Orlando, FL Ph: (407) Fx: (407)