2009 26 – 30 OCTOBER NEWS Darim Group of Companies Darim Tomsk R&D Team Copyright © 2009 Darim Vision Ltd. All Rights Reserved.

Slides:



Advertisements
Similar presentations
QUICK GUIDE MANUAL GV-DVR System Organization 2. Specification.
Advertisements

TAPELESS Internet, Intranet TV On Air Automation Solution
8 Channel Analog Network Video Recorder
Medical Video Recorders
A new Network Concept for transporting and storing digital video…………
Test Case Management and Results Tracking System October 2008 D E L I V E R I N G Q U A L I T Y (Short Version)
Introduction of iVMS-4200 v2.0
Media Analysis Technologies TVWebber Overview. What is TVWebber? 12/8/2008 TVWebber is a turnkey solution that enables web video content providers to.
Group 4 Craig Bellamy Jeremy Ruple Frank Swehosky Ryan VanAlstine.
1 Using PowerPoint, Blackboard, & the Internet in the Classroom Prepared for Teaching and Technology Faculty Conference, UMSL, Nov., 2001 Developer: Joe.
Remote Surveillance Vehicle Design Review By: Bill Burgdorf Tom Fisher Eleni Binopolus-Rumayor.
SD Dec Team Members Client / Advisor Acknowledgements Victor Villagomez Cpr E Joe Grady E E Dr. Gary Tuttle Leland Harker Prakalp Sudhakar E E James.
H.264 Remote Surveillance & Streaming Solution Darim 2009 IPSEC.
Modular Network Surveillance & Streaming Solutions Darim 2009 IP-SECURITY.
H.264 Remote Surveillance & Streaming Solution Darim 2010 Darim Vision Co., Ltd.
Enterprise CCTV monitoring Solution
Encode/Capture Products
LKr readout: present and future R. Fantechi 30/8/2012.
Darim Group of Companies Darim Tomsk R&D Team – 30 October News Copyright © 2009 Darim Vision Ltd. All Rights Reserved.
© 2009 GroundWork Open Source, Inc. PROPRIETARY INFORMATION: Information contained herein is not for use or disclosure outside of GroundWork Open Source,
USB host for web camera connection
IO [io] 8000 / 8001.
Prepared by the BSat Group Bsat Brochure. Feature Of BSat Systems: BSAT Group provides a full TV channel system, which has a set of software packages,
…Dedicated Micros has introduced a new Hybrid DVR….
Mark Recoskie November 14, Agenda  Quick review of value proposition  Review of Warp r1v2 hardware and software  What’s new in Warp 3.0 hardware?
#RefreshCache Redmine Learn why RefreshCache is the community developer's new best friend. Daniel Hazelbaker Information Technology Director.
Virtual Studio Technology
Guide Demo Program installation SOP ePAD SW PM. Before you start Check “Guide” version is latest ( or ) * follow next page Latest version.
High Speed Data Converter University
CHEMS ANNUAL TRAINING Topics For Today CHEMS CHEMSPRO.
242/102/49 0/51/59 181/172/166 Primary colors 248/152/29 PMS 172 PMS 137 PMS 546 PMS /206/ /227/ /129/123 Secondary colors 114/181/204.
EGEE is a project funded by the European Union under contract IST Testing processes Leanne Guy Testing activity manager JRA1 All hands meeting,
David Cussans/Scott Mandry, NIKHEF, October 2008 TLU v0.2.
INSTALLATION HANDS-ON. Page 2 About the Hands-On This hands-on section is structured in a way, that it allows you to work independently, but still giving.
BDA UHD Format Study (SPE internal update)
Plan Design Analyze Develop Test Implement Maintain Systems Development Life Cycle MAT Dirtbikes.
1 © 2006 Cisco Systems, Inc. All rights reserved.Cisco ConfidentialPresentation_ID Scientific Atlanta Configuration Module 2.3.
3 rd Party Integration – Paxton Apr, Agenda Solution Partner Introduction Integration Introduction Product Demo Technical Issue Escalation Quick.
Team Project: A Surveillant Robot System Little Red Team Chankyu Park (Michel) Seonah Lee (Sarah) Qingyuan Shi (Lisa) Chengzhou Li JunMei Li Kai Lin SW.
AXIS 250S MPEG-2 Video Server Full resolution live MPEG-2 video over your network.
Developing software and hardware in parallel Vladimir Rubanov ISP RAS.
Software Status Sonja Vrcic Socorro,
CHEMS Training CHEMS 2003 AREV CHEMS CHEMSPRO AdHoc Reporting County Requirements.
Chapter 3 Installing and Learning Software. 2Practical PC 5 th Edition Chapter 3 Getting Started In this Chapter, you will learn: − What is in an application.
ONE LAPTOP PER CHILD This works are licensed under a Creative Commons Attribution 2.5 License. One Laptop per Child Software Roadmap May 20, 2008 One Laptop.
Welcome to the CPS  Assessment System Training! Joe Zito.
Status of NA62 straw electronics Webs Covers Services Readout.
February Testing Campaign Summary. Disclaimer This presentation is based on the reports of the testing campaign and focuses on the problems arisen during.
HD Board Spec HDS Series HDS ch SDI Board Key Features 4 channel high definition input using HD-CCTV Technology Full 120 frames per second compression.
Daniele Spiga PerugiaCMS Italia 14 Feb ’07 Napoli1 CRAB status and next evolution Daniele Spiga University & INFN Perugia On behalf of CRAB Team.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Enabling Grids for E-sciencE INFSO-RI Enabling Grids for E-sciencE Gavin McCance GDB – 6 June 2007 FTS 2.0 deployment and testing.
Part A. Remote Viewing IP Surveillance Camera Application Guide.
John Samuels October, Why Now?  Vista Problems  New Features  >4GB Memory Support  Experience.
T Project Review Sotanorsu I2 Iteration
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
VIVOTEK Technology Roadmap Presenter: Steve Ma / Director of Product Marketing.
Pete LePage Product Manager Internet Explorer Team.
VIVOTEK 2007 Product Roadmap
Chapter 3 Installing and Learning Software
© 2006 Cisco Systems, Inc. All rights reserved.
IP Speed Dome Solution 2006-Feb-22.
Outline What does the OS protect? Authentication for operating systems
SMS MARKETING.
Outline What does the OS protect? Authentication for operating systems
Top 5 Issues of Mozilla Firefox Browser in Problem 1: Firefox Not Responding, Slow  Feb 2018 Firefox is not working properly. It is slow to load,
Developer Patterns to Integrate Silverlight 4.0 with SharePoint 2010
Today’s agenda Hardware architecture and runtime system
Team Project: A Surveillant Robot System
PSS0 Configuration Management,
Presentation transcript:

– 30 OCTOBER NEWS Darim Group of Companies Darim Tomsk R&D Team Copyright © 2009 Darim Vision Ltd. All Rights Reserved

Agenda R&D/Production/Marketing/Sales Products  FS : FS1000-FS1100-FS1400(IP/ASI)-SlowMoReplay  VS: VS4000/2000/1000, VRP-elearning  MV: MV401/410/901  VT: VT70/210/300/400/500/600/800  SP: Spider CMS, iSP, SPT/SPC  Multiview-Series –DBSS Main Sales Item Now : VS/FS Korea DBSS, VS ASIA: FS, Europe: FS/ VS, MV,SM – 30 October News

R&D Results by Products – 30 October News

FS1000: FD300 Embeded SDI I/O Daughterboard Yuri Dorokhov sent final gerber files for production 30 October Maxim Sitdikov said that SDI Embedded Audio channel selection for IO – will be supported (to be full Analog to SL version) Production Shedule – necessary, Web Update – slightly chagne our web – not same as Softlab. Nov Sample ship: 1.December ok Dec 40Set

FS1200/FD210: MV401 ASI Out Sasha’s test in Elcomtech have show acceptable result for ASI Out Fine tuned parameters (feedback from Sasha) were applied to latest firmware upgrade package on ftp.darim.comftp.darim.com Can we make FD210 which can do ASI output – SDI/ASI input and ASI output.. Or FD300-ASI output combination. To make same as Spain – ASI in/Out OnAir/Titling? – Darim UK ( Remote Test – Sasha Managing) - Announcing decision by Matt, FS1200 – analog/SDI-ASI, FS1210 – ASI in ASI out? Production will be prepared – FS1200 kit? Nov Dec : Test Results. 11 월 20 일 Matt, FD210with Daugter board FD210 Shipping : FS1200/1210/Multiview Middle of Dec. – Announce

FS4000: HD DVM / AJA Sasha-Alexei-Vlad work with Softlab to fix NTSC problem Eugene and Stefany( Canada) work together to improve Production Shedule – 85 units Web Update – slightly chagne our web – not same as Softlab. Nov Sample ship: 1.December ok Dec 90Set

MV: MV401 ASI Out Sasha’s test in Elcomtech have show acceptable result for ASI Out Fine tuned parameters (feedback from Sasha) were applied to latest firmware upgrade package on ftp.darim.comftp.darim.com HD Need to check if Eleard one can do - MV401-HD ? They claim very low latency … Even we will have HD MV 901 – 720P first Production will be prepared – Check if Vietnam X-customer still interested. Nov Dec Sample ship HD S/WMV/SP 901 – 300 units- case

MV: MV211 AD Titler with partial decoding Vsoft’s Alexei Doilnitsyn reported in that finally they installed all environment. And, they found current Title ds filter do not support interface for partial decoding (were implemented in SL 3 years ago). Eugene Vinnik is checked and fixed some bugs in SL source code – sent update for Vsofts, received confirm OK Can we use simple titling first ?- for HD, SD, powers of soft titling etc..? ( And I believe it will work for ASI-in-ASI ) Any time schedule planned? Received remote access to Matt’s system for MV211 software setup, but need 2-3 days for completion (software release) : Business Direction- will be made with Matt – need to conference together Nov Dec Sample ship Nov

MV : MV411 OEM MPEG2 to AVC Transcoder Software is 95% ready, issue with Windows Server 2003 web MVManager installation need to solve Software protection implemented Is it for Matt or Norman? MV211 is MPEG2 titling, MV411 is transcoding? ( time to define ) Need to make Sales plan for MV series with development plan Nov Software Sales ? Downloadable? Dec CD, Manual Production

MV401-MV410 for Bloomberg Audio issue Maxim Sitdikov is fixing (not yet) Release expected at the end of this week Chang should support Bloomberg if they can support us – for next product –MV901 etc..after we fix problem – I believe they won’t go with us any more..  But experiences of MV can add on MV901 or next product I believe. Production : Now we have all manual Box, case Marketing : All the new features of MV series, we need to update in our Flyer and Web. Nov Sample ship

MV/Spider: MV901/VT901 /SD/HD Encoder/SPC Initially it was supposed to send to Ambarella – Shanghai for HF Decided not need to send it at all – Shmoo test is working in Canada, Tomsk Preliminary check passed for 720p 30fps using trick with refdesign sensor’s driver and videosensor as i2c responder, but actual video data passed from VT901 – works ok. We received 2 more boards from Korea, now total we have 2 working boards and Yuri Dorokhov said 1 more possible to repair. Looks like can be a one or half month ahead for test working sample at least Production Schedule : time to find component to prepare – 4 weeks Marketing – Should know we are moving H/W encoder based MV, SPC( c-mount Camera), VT( USB) Nov Dec Sample ship

SPT-100 Pan Tilt HD Camera Sample installed, testing show 1-2 hour of working, then need VLC player restart, our ActiveX control crashes within 5-10 min As a solution to above issue, Ilya Smelykh rewrite streaming part, he said much better now, planned to do more testing/improve Production : component ordering - Main Chip a Marketing : All USA / Europe / Asia Sales ( Precontact s –Japan/Asia/Europe/Korea/USA/South America) Nov Dec 10 Sample ship100 Sample ship 600 ship Jan

SPC-100 HD Cam Hardware design almost ready, confirmed by Sergei, so will be sent for production soon (in 1-2 days) Shmoo test for sensor is running on Darim module, so 1-2 days investigation will show results. Now it is possible to receive defective video on SDK 4.2, but this is same way defective video on SPT-100 which works well on SDK 3.0 (means software issue) Production : Sample PCB Marekting /Sales Nov Sample Unit Ship to TOMSK & Dallmeier Dec Case Design Production Sample

SP: PVE400 One wireless sample installed – ready for test and debug with spider software Another sample need to connect camera – don’t have now Expedience WiMax integration with Motorola handled by Ilya Smelykh, and he says everything is OK now from Darim’s side Stability issue??? (firmware data damage in flash) Production PVE Production is moving to Korea factory. Need to finish before new production in November. Trying to set model of Pve. Nov 100 Unit Production Dec Case Board Production

SP: iSP416 H/W and SP s/w Continue Audio issue investigation (fixing bad start interrupted audio issue) 1 st Priority from now is Milestone software compatibility Spider is getting delayed. Time to do iSP anouncement not to loose market. iSP with POV with Spider s/w and SM2000 is the main thing for sales. Controlroom based solution – so we can start marketing. Even I am not sure if we can sell iSP since peoples are moving HD.. New Korea VP of Sales will focus on Korea market first. LeNel Still? Nov Sample Unit POV -10 set Dec POV Case Electronic Production

Highway ActiveX updated for compatibility with Truen stream, but Sasha reported same crash issue again, and now working to fix Admin site updated for DB limitation (protection), plus minor UI changes requested by Sasha Streaming server software updated for double protection of DB channels adding VSNM to RTSP Retransmitter server updated, but not succeded yet to fix ActiveX crash issue. Protection is the most important. Truen already made RT server..so I am not sure why they need ours.. We should concentrate on protection of channel increasement. And we need NDA when we work for 3 rd party development – not make same one for competitors.

SM2000 Multiview Test in Elcomtech have show working status Sasha captured test file 3Gb (10ch AV included), downloaded in Tomsk, will be applied by Eugene Vinnik in Test_Streaming application to be used as ASI generator for SM2000 Multiview and MV211 tests Olga Mager is writing User’s Guide (end of week – target date) ASI Remuxer part is discussing with Elcomtech. I hope they succeed it. Not fully working yet. We are also checking Canada company for remuxer.. If they failed, we need to find a way how we made muxer Nov Dec Case Production ASI remuxer

VT: Videotizer – VT901/800 Audio bar graph non working with VT600 bug fix New feature of AVI File export with independent start/stop of export from encoding/capture (Requested by Sasha) Release planned by Andrei – end of week VT500 stability, VT600 embeded audio, VideoTizer S/W-Option with H.264 capture/Streaming feature – using Etri’s? – marketing point !! VT900 Need Flash Encapsulation – Streaming VT800 – 2ch SDI in and 1ch SDI output – only Nov Dec VT500/600 New Box VT900

PTZ and BMB Alexander Lomovitskiy reported some problem on issue “Bike Channel rotation problem solve” We need to announce Remote PTZ controlled Tracking system. Software part need Eugene + Canada Team to make own Tracking solution by December. Mechanical part will be ready by middle of Nov. by Piezo Tech. We will start full integration. BMB will start simple one axis with Generator model. ( Taiwan company would like to start simple model first and 3 axis next..) So I would like to move first PTZ, the others next. Nov Dec PTZ H/W Production PTZ software Development

Waiting for hardware update of new darim.com server Implemented online support in draft version Reporting system – TBD Content fill – suspended, waiting for Claire’s instructions Nov Dec Finalization of Web

Comments – 30 October News 1.Taiwan Ask HD DVM based OnAir – need to test if it works 2.Taiwan asking SD Onair with live video in Titling window - SD Digital Signage 3.Indonetia asking 6 city remote broadcasting – Remote FS system – controlling from Jakarta. So we need to help. 4. Italy ASI multiview – 16ch ASI inputs, they are expecting many system sales 5. Spider SPC/SPT is high priority to move 6. iSP with Spider SM2000 From R&D plan,, Darim sales team and marketing team should review market And make plan for sales.

Business forcast from FS/FD – 30 October News ProductUnit PriceNext 3 MAnother 6M FD300 – SD :1000 USD3060 FS1000/110010,000 USD15-10( USA)12-50 FD-ASI – FS1200kit 2500USD ( MPEG2?) FS4000 Kit5000 USD1550 Direct OnAir- HD/VGA - Signage 3000 USD30100 FD800 – SDI/DVI 2000 USD100

Business forcast from product Assuming VS1000, and Tracking – 30 October News ProductUnit PriceNext 3 MAnother 6M VS2000/400020,000 USD515 VS1000/T7,000 USD15100 VS2000-T30, Tracking20,000530

Business forcast from product Assuming VRP 100,212 is ready – 30 October News ProductUnit PriceNext 3 MAnother 6M VRP212-T20,000 USD1550 VRP1125, VRP-VRVillage( korea School)20100

Business forcast from MV – 30 October News ProductUnit PriceNext 3 MAnother 6M MV401/ USD1030 MV401 ASI6000 USD1030 MV411 (transcoder) 2500USD MV211 Titler7000 USD520 MV211 Partial15000 USD200 MV901 ( 720P)3000 USD MV901(1080i/30) Fujitsu(?) 7000 USD150

Business forcast from VT – 30 October News ProductUnit PriceNext 3 MAnother 6M VT500500USD30100 VT USD30100 VT USD5020 VT210 ( ASI)1500 USD520 VT800 ( DVI/HDMI ) 700 USD100 VT800-SDI700 USD30 VT901 ( USB)Flash 1000 USD50500

Business forcast from SP – 30 October News ProductUnit PriceNext 3 MAnother 6M SP CMS S/W1000 USD30100 iSP USD SPT1000 USD SPC500 USD SP USD SM USD10100

Components Request – 30 October News

Components for Development Samples Repair PVE ICS1893Y-10LF Ethernet 10/100Mb chip 4pcs 2. MAX3221CPW RS232 interface10pcs 3. TVP5150AM1PBS video encoder 2pcs VT CS MABJ-UT Crystal for videodecoder 2pcs SPT Axis Digital Compass IC HMC5843 2pcs 2. LT3572EUF#PBF-ND - Dual Full-Bridge Piezo Driver with 900mA Boost Converter 2pcs