Agnico-Eagle Mines Limited1. 2 Growth Strategy Building Value Through Production and Reserve Growth Produce more gold targeting over 1.2 million ounces.

Slides:



Advertisements
Similar presentations
Olukunle Amoo BestKamco Resources, Toronto, Canada
Advertisements

MDG CAMEX INVESTMENT Present Investment $3,000,000 Proposed Investment $5- 10,000,000 Camex MDG Overview Pre-RTO Copper, Gold and silver mining investment.
Photo Book: The Deer Trail Mine Story Piute County Utah Q
2008 Second Quarter Results TSX: LUN NYSE: LMC OMX: LUMI.
September 15, 2014 TSX: CGG | HKSE: 2099 China Gold International Resources Corp. Ltd. Sustainable Profitability and Growth.
3 February 2005 SYDNEY MINING CLUB. DISCLAIMER The information contained in this presentation has been prepared using the information available to Sino.
SEE Business Forum Istanbul, Turkey November , 2012.
Cleveland Mining Company Limited Management, Strategy & Projects August 2013 David Mendelawitz Managing Director ASX CodeCDG.
HYCROFT RESOURCES & DEVELOPMENT INC. Allied Nevada Gold Corp.
Creating a New Exploration Growth Story March 2009.
May 13, TSX-V:OCO, Frankfurt:OR6, US OTC: ORRCF.
A Growth Company Producing Rare Precious Metals Palladium & Platinum June 7, 2000.
Greencastle Resources Ltd. Gold Exploration Battle Mountain Trend, Nevada Oil Royalty = Cash Flow TSX Venture Exchange symbol “VGN”
district development Tanzania – Lake Victoria Greenstone Belt.
1. Investor Presentation April Disclaimer DISCLAIMER: This presentation contains forward-looking statements including but not limited to comments.
The Rapu Rapu Project Lafayette Mining Limited. Overview People Project - Location - Description - Social and Political - Statistics Prospects - Schedule.
Understanding and Valuating Exploration Companies 24 May 2007 Shane Hunter.
Results & Outlook BVN LISTED NYSE Compañía de Minas Buenaventura S.A.A. September, 2004.
4.7 Billion Rand Investment In South Africa Driefontein 9 Sub-vertical Shaft Depth Extension and Kloof Extension Area Decline Shaft System 7 September.
TSX: SGR OTCQX: SGRCF 1 SAN GOLD CORPORATION CORPORATE PRESENTATION TSX: SGR OTCQX: SGRCF JUNE 2013.
CanAlaska Ventures Ltd This slide show presentation contains certain "Forward-Looking Statements" within the meaning of Section 21E of the United States.
Perlat Project Volcanogenic Massive Sulphide Copper, Gold, Silver, Zinc Mr. Zahir (Zip) Dhanani Chairman, CEO and Director Mr. Robert Naso General Manager.
4/16/2017 SHERRITT INTERNATIONAL Ambatovy Nickel Project: A Progress Report March 2008.
How to Value Gold and Silver Mining Stocks Don Durrett Copyright 11/21/2011.
Investor Presentation
Recommendation: BUY Sandstorm Gold (SNDXF). Industry Overview 2 Gold mining is capital intensive Capital is very expensive for small exploration and production.
TRANS-SIBERIAN GOLD PLC 29 June 2015 Annual General Meeting TRANS-SIBERIAN GOLD.
Sage Gold Inc. Near Term Gold Producer in Ontario Building on the strengths of our people, we will grow Sage Gold into a significant gold producer over.
1 Annual General Meeting November What we’ve done Where we are Barra Resources Ltd The Year in Summary  High Grade Wahloo Shoot discovered at.
TSX.V: PRB Focused on Creating Significant Shareholder Value in 2011.
SMH Capital Houston, TX February 25, Forward Looking Statement The statements made by representatives of Natural Resource Partners L.P. (“NRP”)
Anglo Coal Australia. Group Structure Anglo Coal Australia Australia’s third largest coal producer Investment in Australia totals USD 1.3bn Plans to.
TSX-V: OCO Frankfurt: OR6
Corriente Resources Inc. Copper Growth Story Corriente Resources Inc. Copper Growth Story November 2006.
Forward Looking Statements This presentation contains “forward looking statements”. These forward-looking statements are made as of the date of this presentation.
West Contra Costa USD Presentation to the Facilities Subcommittee January 22, 2013.
1 Presented By: Neil McMillan President & CEO Q1 Financials May 14, 2012.
Presentation to MineAfrica’s Investing In Africa Seminar March 4, 2008 By Don Willoughby, VP Corporate Development All financial.
Wilderness Rim Association Water Rate and Reserve Study Board Meeting April 23, 2014 Presented By: Chris Gonzalez, Project Manager.
Ramping-up to Full Capacity Investor Presentation February 2009.
Agnico-Eagle Mines Limited Business Review 2005 Building from Strength Sean Boyd President and Chief Executive Officer.
Bullabulling Gold Limited the merger of Auzex Resources Limited and GGG Resources plc March 2012.
Natural Resource Partners L.P. Investor Meetings West Coast March 19-20, 2007.
Natural Resource Partners L.P. A Successful Growth Story UBS Investor Meetings Las Vegas, Nevada September 18, 2007.
100% ownership (subject to gov’t 10% carried interest) in 2 contiguous prospecting licenses covering 161 sq km on the Ashanti Shear. Right to acquire.
Issued and Outstanding M Fully Diluted M Options 0.4 M Cash $119 M USD Short-Term Debt $338 M USD Long-Term Debt $571 M USD Share Price $2.07.
1 TELUS investor conference call Announcement of Income Trust conversion September 11, 2006.
SYDNEY MINING CLUB CLUB 5 DECEMBER Outline of Presentation  the answer  the question  the explanation:  How we got here  Coal cash flow leverage.
Mexico & South America Mining Deal Exchange: Mining Financing Opportunities through the TSX Venture CPC Program Mauricio E. Candiani.
Natural Resource Partners L.P. 17 th Annual Wachovia Equity Conference Nantucket June 26, 2007.
St Barbara Mines Limited Tokyo Presentation Eduard Eshuys Managing Director & CEO 26 September 2004.
Preliminary Results Presentation – September 2005 Preliminary Results Presentation Year to 30 th June 2005.
MINERALS CORPORATION The Beginning of Chapter 2… June 2009.
Presentation Disclaimer Forward Looking Statements  This presentation may contain certain forward looking statements and projections regarding:  estimated,
Vp plc The Equipment Rental Specialist Final Results Year ended 31 March 2007 Rental and sale of specialist products and services to construction, civil.
COAL MINE PROJECT OPPORTUNITY NALAIKH MINE POWER GENERATION AND HEATING PROJECT TSAGAAN SHONKOR HOLDING COMPANY NALAIKH DISTRICT, MONGOLIA OVERVIEW OF.
…investing for pure gold profits BMO Capital Markets Feb 2008.
TRANS-SIBERIAN GOLD PLC 30 June 2016 Annual General Meeting TRANS-SIBERIAN GOLD.
Mali Senegal Burkina faso Cote d’ivoire Ghana Tanzania ‘the gold standard for value creation’ ‘the gold standard for value creation’ LSE (RRS) Nasdaq (GOLD)
Exploiting market opportunity or building profitable businesses?
BVL: MIRL March 2017.
TRANS-SIBERIAN GOLD PLC Annual General Meeting
COMPANY SNAPSHOT Listed Dec 2003 ASX: MML, MMLO Strategy
Investor Presentation – SEPTEMBER NGM:TSX-V
Developing a Canadian Gold Deposit
BVL: MIRL October 2017.
Q4 and fiscal 2017 results March 15, 2018.
A U.S. Based GOLD&CRYPTO Trading International CO.
Principal Projects - Mexico
Financing Stages (Mining)
Presentation transcript:

Agnico-Eagle Mines Limited1

2 Growth Strategy Building Value Through Production and Reserve Growth Produce more gold targeting over 1.2 million ounces by 2010 Grow gold reserves in mining friendly regions Now 15.4 million ounces Targeting million ounces within 20 months Acquire small, think big Create value through strategic acquisitions Be a low cost leader Generate strong earnings and cash flows from low costs operations Maintain a solid financial position Approximately $525 million in cash, no long-term debt

Agnico-Eagle Mines Limited3 Corporate Highlights Q1, Another Quarter of Strong Cash Flows and Earnings Strong quarterly earnings of $24.9 million or $0.21 per share Strong quarterly cash flow provided by operating activities of $56.1 million Gold reserves increased 23% to 15.4 million ounces from Dec. 31, 2006 Low total cash costs of minus $332 per ounce Four new gold projects under construction, Pinos Altos Board approval expected mid-2007

Agnico-Eagle Mines Limited4 Current gold reserves of 15.4 million ounces following successful Cumberland offer AEM’s gold reserves are significantly larger than its intermediate gold producing peers Targeting additional reserve conversion at Pinos Altos, Goldex, Kittila and Meadowbank Strong record of growing gold reserves per share Gold Reserves Anticipating Further Strong Growth In Reserves This Year Total Agnico-Eagle Gold Reserves (Millions of Ounces) LaRonde Goldex Lapa Kittila Pinos Altos Meadowbank 12.5 Target:

Agnico-Eagle Mines Limited5 Building Gold Production and Reserves Agnico-Eagle Mines Limited

6 Finland Kittila U.S.A. Nevada Mexico Pinos Altos Canada Toronto, HQ Canada LaRonde, Goldex & Lapa Global Growth Extensive Gold Growth Pipeline Management and skills in place for mine building AEM’s growth projects 100% owned, with low total acquisition costs Located in mining friendly regions of low political risk Each project region has long-term mining camp potential Largest exploration budget in Agnico-Eagle’s history – greater than $40 million Canada Meadowbank

Agnico-Eagle Mines Limited7 Substantial Gold Production Growth Additional Production Growth Anticipated to Come From Mexico Au Ounces LaRondeGoldexLapaKittilaMeadowbankPinos Altos Potential

Agnico-Eagle Mines Limited8 Capital Expenditure Estimates ($000's) Pinos Altos Potential

Agnico-Eagle Mines Limited9 LaRonde Long Life Gold Reserves – Construction on Extension Began May 2006 Proven and probable gold reserves of 35.6 million tonnes at 4.5 g/t, or 5.2 million oz Anticipated average production, post-2011, of 320,000 oz/yr at total cash costs of approximately $230/oz Development of new winze infrastructure ongoing Intriguing new mineralization west of orebody is being drilled

Agnico-Eagle Mines Limited10 Goldex High Tonnage Gold Mine Under Construction – Production Q2, 2008 Proven and probable gold reserves of 1.7 million ounces from 22.9 million tonnes grading 2.3 g/t Estimated average annual production of 170,000 oz/yr with total cash costs expected at $225/oz Shaft sinking underway - at 435 metres, toward planned depth of 857 metres * (see press release of Feb. 21/07 for further detail) Drill intersection of 2.9 g/t gold over 80.0 metres (true thickness)* to the east, and at depth to current resource envelope

Agnico-Eagle Mines Limited11 Lapa New Gold Mine 11 km East of LaRonde – Production Q4, 2008 Probable gold reserves of 1.2 million oz; 3.9 million tonnes at 9.1 g/t Anticipating average production of 125,000 oz/yr at expected total cash costs of $210/oz Shaft sinking and surface construction in progress. Shaft at 1,148 metres, toward planned depth of 1,370 metres Deposit open for expansion

Agnico-Eagle Mines Limited12 Kittila Mine – Finland Six Drills in Operation – Production Q3, 2007 Probable reserves of 2.6 million oz; 16.0 million tonnes at 5.1 g/t – open on strike and at depth Average production expected at 150,000 oz/yr with approximate total cash costs of $250/oz Exploration ongoing to convert resource and extend zones Open pit, surface facility and underground ramp well advanced

Agnico-Eagle Mines Limited13 Pinos Altos – Mexico Growing Gold and Silver Reserve Large land position – approximately 11,000 hectares $26 million exploration program in progress New drill targets in NW sector and at San Eligio Deposit close to major infrastructure Feasibility study complete, Board decision mid-2007 Optimization for new reserve underway Agnico-Eagle Mines Limited13 Contained gold reserve Probable reserve 18.6 million tonnes at 3.1 g/t, or 1.8 million oz Contained silver reserve Probable reserve 18.6 million tons at 92.8 g/t, or 55.5 million oz

Agnico-Eagle Mines Limited14 Meadowbank Agnico-Eagle Preliminary Estimates Mine Life:Eight years Mine Throughput:8,500 tpd Metallurgical Recovery:93% Mining Method:Open pit Initial Capital Cost:C$375 million Sustaining (life of mine):C$65 million Average annual production: Years 1 to 4:400,000 oz Au Life of Mine:350,000 oz Au Est. Total Cash Cost per oz: Years 1 to 4:$230 Life of Mine:$250 Open Pit Mineral Proven and Probable Reserve:2,890,000 oz Au

Agnico-Eagle Mines Limited15 Timeline and Upcoming News Second Quarter 2007 Pinos Altos 3 rd party review complete; Possible production decision Anticipated closing of Cumberland acquisition Exploration update, early May

Agnico-Eagle Mines Limited16 Generating strong earnings and cash flows gold growth projects fully funded Three new gold mines expected to start production next year potential to increase gold production fivefold by 2010 Existing projects provide potential to increase gold reserves to 18 million to 20 million ounces Exploration upside exists at all projects 16 Investment Highlights Early Stages of Growth Story – Potential Increase In Valuation Multiple

Agnico-Eagle Mines Limited17

Agnico-Eagle Mines Limited18 Appendix