Workforce Management System presented by Crystal Woods, Human Resources Division Head Arkansas State Highway and Transportation Department.

Slides:



Advertisements
Similar presentations
Collaborative Initiatives Panel Joyce McCarthy HR Process Improvements.
Advertisements

HR Time Collection System. Time Collection System Overview Types of Time Collection Devices (TCD) Kaba web clockKaba wall clock.
B O W L I N G G R E E N S T A T E U N I V E R S I T Y Self-Service Time & Labor Previews October 17.
1 Wireless Communication Device Allowance Policy – Getting Out of the Cell Phone Business.
DHRS – KRONOS SCREEN USER GUIDE.
Paperless Online Payroll, Integrated HR & Report Generating System.
TOWN OF DARIEN DEPARTMENT OF HUMAN RESOURCES PERFORMANCE MEASURES 2010.
Compass Information System – Information for LSASPA Members
FLSA & KRONOS Leah Metzer, Director, Accounting & Payroll Bridget Bushman, Specialist, HR/Classification.
OfficeTrack Mobile Employees and Fleet Management System.
ODOT Employee Training UPDATED 8/8/2013
COMMAND TRAILER PRESENTATION by Ken Kirschmann Superintendent/Customer Service.
Steve Schwabe Woolpert Project Manager
Kronos Overview Go-Live Date June 17, Why are we implementing Kronos? Current Process: – Sign in / out on paper – Fill out AU-15 turn into supervisor.
 The Kronos application utilizes single sign-on.  You will see a short-cut to Kronos on your desktop.
MDOT’ Maintenance Management System Southeast Regional Maintenance Conference Biloxi MS Ken Hauser - MDOT.
Increase Productivity A monitored employee is a productive employee Operational Efficiency Streamline processes between the office and the field Improve.
Time System What is this all about? The purpose of this project is to automate how Evergreen collects, records and manages employees’ dates and times worked.
1 SYS366 Week 1 - Lecture 2 How Businesses Work. 2 Today How Businesses Work What is a System Types of Systems The Role of the Systems Analyst The Programmer/Analyst.
Winter Operations GPS Truck Tracking and Material Usage Tom Clay Washington State Department of Transportation Western States Equipment Conference
SDReaderCE An Overview on Use and Functionality. Using SDReaderCE After loading the route to the handheld from SDReader6, select the route folder from.
ODOT Employee Intouch device training
AMG Attendance System Product Description Copyright © 2009 AMG Employee Management, Inc.AMG Employee Management, Inc.
Badger TraCS – A Coordinated Effort
Xora GPS TimeTrack™ Take charge of your mobile workforce.
HELPFUL HINTS FOR MAINTAINING PAYROLL DATA Session 9A 2014 Spring KASBO Conference Sheila Miller, Business Analyst Office of KIDS Kentucky Department of.
1 Xora Sales Presentation. >About Xora >Demo Examples >Appendix Agenda 2.
Chapter 8 Support Functions
ECERT Electronic Certification of Effort and Reporting Tool Presented by Donna Smith and OPAFS.
Fiscal Compliance for Title III Keisha Davis Monitoring & Compliance Section School Business Division
ShopKeeper was designed from the ground up to manage your entire fleet maintenance operations … from 1 user to 100, including full security features that.
UAA Fiscal and Administrative Resources blackboard site Available resources and links to fiscal websites How To Instructions.
Time and Attendance From Superior Data Solutions.
This presentation is the property of Paradigm Information Systems It is confidential to the intended recipient for the purpose of evaluating FMS Any other.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
Transportation Services Budget February 4, 2010 Josh Davis, Director 1.
HUMAN RESOURCES TRAINING For SUPERVISORS July 8, 2003.
Enterprise GIS Planning and Framework Jennifer Reek GIS Coordinator City of Brookfield, WI.
GPS TimeTrack™ for Distribution. Proprietary and confidential. All rights reserved. Xora, Inc. 2 Business challenges Limited visibility –It’s difficult.
Nevada Citation & Accident Tracking System
Time Collection with Mobile Devices Session Presented by JP Issock Quality Business Consulting.
43 rd Annual Western States Highway Equipment Managers Association Conference Washington State Department of Transportation Presentation August 29, 2011.
Fiscal Compliance for Title III Keisha Davis Monitoring & Compliance Section School Business Division
_name Kronos Confidential Kronos webTA Federal Time and Attendance System Sample Screens Shots “We specialize in delivering a flexible, integrated,
USDA webTA Configuration Process United States Department of Agriculture Office of the Chief Financial Officer National Finance Center.
DPW Works Automated System to Improve Route Performance andEfficiency and Efficiency District of Columbia Solid Waste Management Administration.
Sierra Computer Solutions, Inc. Michael Christiansen (800) x568 Established in 1987.
TimeClock Plus UPDATES & ENHANCEMENTS. TCP Version 7 Beta version now being tested Compatible with Apple and mobile devices Different look and numerous.
Using GPS To Locate Collisions Lessons Learned Division of Traffic Accident Surveillance Section.
PUBLIC SCHOOLS OF NORTH CAROLINA STATE BOARD OF EDUCATION DEPARTMENT OF PUBLIC INSTRUCTION Fiscal Components of Monitoring Stephanie English, Chief Monitoring.
Workshop: Timekeeping June 13, Project Goals  Implement SAP Plant Maintenance system Provide integration with Finance, HR, and Materials Allow.
Employee Access and True Time Training “Change is not always fun but sometimes it IS necessary”
Automating Work Order Processes for Advanced Metering Infrastructure (AMI) Devices with Collector for ArcGIS and Portal for ArcGIS Subrahmanyam Pendyala.
WHAT WE ARE LEARNING THROUGH IMPLEMENTATION TODD A. SPANGLER, PE BRENTWOOD WATER SERVICES.
ATTENDANCE MANAGEMENT SYSTEM. PRODUCT DESCRIPTION Attendance Management System: is a user-friendly, flexible and full featured employee attendance management.
Florida Department of TRANSPORTATION FLORIDA DEPARTMENT OF TRANSPORTATION Crash Cushion and Guardrail Approach Terminal In-Service Performance Evaluation.
New User Training Screen 200: Time Sheet Entry Electronic Program Management.
1 Intended use of this Presentation This presentation is for the client Executive contact to use with their internal Enterprise eTIME Project Team. The.
Operations Update Report
Implementation of Computer Maintenance Management system - CMMS
Integra Telecommunications – Prophix story
Install and Run the Kronos Mobile App
Tracking and Traceability for Pipes, Fittings, and Fusions
Workforce Timekeeper™
Use of handheld electronic devices for data collection in GeoStat
PREVENTIVE MAINTENANCE
Final Design Authorization
Updates and Process Changes
Executive Sponsor: Tom Church, Cabinet Secretary
Presentation transcript:

Workforce Management System presented by Crystal Woods, Human Resources Division Head Arkansas State Highway and Transportation Department

Workforce Management System Prior to 2012, AHTD was utilizing a paper- based, manual-entry payroll system which was created by in-house personnel on the mainframe. The need for greater accuracy and accountability resulted in a feasibility study for an automated workforce management system that would incorporate pay (timesheet) data and cost accounting (activities) data.

 16,464 miles of highway  7,252 bridges  3,600 + employees  1,200 + active construction projects  6,700 + pieces of equipment  Over half a million valid activity combinations for cost accounting purposes AHTD Statistics

Request for Letters of Interest was published in Three vendors were evaluated. Kronos, Incorporated was chosen based on their system’s ability to meet both timekeeping and activities reporting requirements. Workforce Management System

Product design workshops began in Spring 2012 AHTD product design committee included representatives from all major functional areas within the Department Testing began in June 2012 and pilot program was implemented in July 2012 Parallel testing was conducted from July 2012 – October 2012 Full system implementation on October 18, 2012 Workforce Management System

Activities for all employees and equipment are captured within the Workforce Management System application (WMS). Activities are captured in a number of ways based on employee duties, their level of access in the system, and their physical location/access to Department computers, time clocks, etc. Workforce Management System

Highway Police Officers use laptops with cellular air cards for entry of all activities in the field, including data capture for MCSAP job costing and construction zone enforcement for federally funded projects. Central office employees use computers for recording punches and activities. Construction field employees use laptops with job site wireless internet access to capture time and activities. Teletime is also available for those employees working in remote areas with no wireless connectivity. Workforce Management System

District maintenance employees use biometric (scanned fingerprint) time clocks to record punches and activities. Maintenance supervisors use the Passport® handheld rugged mobile devices to capture employee and equipment activities data in the field. – The County/Route/Section data will eventually be captured based on GPS coordinates to further streamline the activities entry process Workforce Management System

We capture multiple pieces of information for various types of activities. For example: – Grant expenditures for various planning, research, MCSAP, and public transportation grants – Traffic stop outcomes for police officers (citation issued, DWI, arrest, etc.) – Task codes for mechanics that define the reason for repair, type of repair, system affected, etc. – Federal Aid Project numbers for construction projects – Maintenance activities by county/route/section, type of work performed, accomplishments (such as number of acres mowed), equipment used to perform the task, etc. Workforce Management System

Activities are captured through the use of various entry forms

Employees have access to self entry activity forms. Supervisors have access to self-entry and supervisor-entry activity forms. Types of forms used depend on job title, District or Division, and supervisory role. Workforce Management System

Activity forms have search features that allow for wild card (*) entries if an employee or supervisor is unsure of the job number or activity code.

Workforce Management System Mechanics capture information for each piece of equipment serviced in increments as small as one quarter hour. The labor information is transferred to our Equipment Management System (EMS) at the end of each pay period. The EMS tracks all labor cost and parts cost information for every piece of equipment maintained by the Department. The EMS is used for management decisions such as service costs, disposal, fleet problems, efficiency, etc. Parts information comes from our Stock Inventory System.

Workforce Management System Maintenance field supervisors capture activities data using the Passport® Motorola rugged handheld devices.

Workforce Management System Supervisors sign into the mobile device at the start of the work day and may assign the device to a specific group of employees who may be working together on any given day.

Workforce Management System Supervisors have access to all the same activity forms on the mobile devices that are available on the PC. As activities are completed in the field, the crew leader (or other lead person) chooses the form for the type of activity the crew is performing and then selects either the whole group or individuals from the group for data entry.

Workforce Management System The available activities are loaded onto the mobile devices and appear in a drop down box in the appropriate form. Supervisors enter the duration of time spent on the activity. If group entry is chosen, the same entry applies to all employees on the list.

Workforce Management System Activities for equipment are also captured on the mobile devices in the field. If a piece of equipment has an odometer or hour meter, the ending reading is entered and the device calculates usage based on equipment’s previous reading. If equipment has no meter then the miles or hours used are directly entered into the device.

All employee and equipment activity data is exported from the system and converted into a data file that is uploaded to our cost accounting and distribution system. Data from the Workforce Management System and several other systems is combined to create our cost accounting reports, and Federal aid billing reports. Workforce Management System

We are within a few weeks of deployment of Phase 2, Workforce Analytics, which will give our managers even more tools for budgeting and planning. The following screen shot is the dashboard from our test analytics data:

Overall we had a very successful implementation! We anticipate cost savings from the elimination of 12 full- time payroll clerk positions (through attrition) and the elimination of a lot of paper. We are seeing significant improvements in the accuracy of our data for both payroll and activities reporting. Obviously, we have decreased our risk of non-compliance with Department of Labor regulations. Our employees and managers are much more accountable for the accurate reporting of their own time and labor. We plan to conduct a full ROI Analysis after a year of data is available. Workforce Management System

Questions? Workforce Management System

Contact Information Crystal Woods Division Head of Human Resources Workforce Management System Alicia Garrett Personnel Officer/Workforce Management System Administrator