MM mechanical prototype Work progress at CERN MMM Rome, 15/07/20131.

Slides:



Advertisements
Similar presentations
Dubna report. January 28 - Programme Advisory Committee approved JINR participation plan in the ATLAS upgrade, which was presented by A.Cheplakov.
Advertisements

Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Stave Vacuum Tool Tim WP4 Face to Face Liverpool, 13/11/14.
sTGC for ATLAS Small Wheel upgrade
Status of the ATLAS MM project
ATLAS-NSW CERN MMM workshop assembly of the module (quadruplet)
Status Update on Mechanical Prototype in Rome November 6,
Technical Forum Alice week Clemens Adler Transition Radiation Detector Status Participating Institutions: Athens University, NIPNE Bukarest, JINR.
F. Murtas LNF/INFN 9 July 2002 GEM Chamber 20x24 cm 2 Status Report F.Murtas for the GEM group  20x24 Prototype  PSI Test Beam  Module 0 Progress 
MM mechanical prototype Work progress at CERN MicroMegas General Meeting, CERN, 5-6 November
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
CERN PH/DT 12/05/13 Jordan Degrange / Francisco Perez Gomez CERN PH/DT.
CERN PH/DT 30/01/14 Francisco Perez Gomez CERN PH/DT.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
Irfu.cea.fr ATLAS-NSW 4 TH MMM WORKSHOP THERMO-MECHANICAL SIMULATIONS FOR THE MM WEDGES (TDR OPTIONS – SCREWED QUADRUPLETS) of June 2013 Patrick.
Irfu.cea.fr ATLAS-NSW SACLAY MMM WORKSHOP SIMULATIONS OF THE MM WEDGES WITH THE LAYOUT OPTION #3B of April 2013 Patrick PONSOT & Patrick GRAFFIN.
EMDM Monolithic suspension development Activity plan Piero Rapagnani Detector meeting
MM construction organization Some thoughts MMM Saclay, 18/04/2013J. Wotschack1.
Basic concept The NSW chambers are assemblies of Micromegas monolayers, TGC’s and spacer/stiffeners. In order to simplify the assembly procedures we propose.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
T.Schneider/LHCb Muon EDR
G.Sirri – INFN Bologna Videoconf Gluing machine New solution under test: rigid plastic frame instead of lateral tapes and.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
News from the lab Large size Micromegas chambers Saclay, April Givi Sekhniaidze / Joerg Wotschack.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
Silicon /pcb assembly R Thompson, J Freestone LAL 3 June 08.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
MM detector construction One or several modules per sector considerations.
Status of Torino-Dubna Production Aluminum Plates production: Torino: steady production ongoing, 2715 plates cut, 194 chambers=48MB1.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
M. Bianco On behalf of the ATLAS Collaboration
G. PassalevaRoma - July 28, 2004 Status of MWPC production site in Florence G. Passaleva.
Givi Sekhniaidze1 CERN, 25 March Givi Sekhniaidze2 The angles for the chambers are: LM1 – ° LM2 – 7.224° SM1 – ° SM2 – ° Do we.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
David Bailey Gluing. Silicon /pcb assembly Previously Using Sony Robot and precision dispenser Have established acceptable glue dot parameters Dot electrical.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
Experience with 1 x 1m 2 and 2 x 1 m 2 MM assembly CERN/PH/DT Hans Danielsson, Francisco Perez Gomez, Philippe Lenoir, Pierre-Ange Giudici, Francois Garnier,
22/04/20011Wire Chamber Working Group Status on O-ring closed Prototype Foam panels from Frascati (size: 279mm*341mm) No pad structure 4 independent gas.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
Patrick PONSOT for the CEA-Saclay-Irfu group: F.Bauer, P.Daniel-Thomas, E.Ferrer-Ribas, Ch.Flouzat, J.Galan, W.Gamache, A.Giganon, P-F.Giraud, P.Graffin,
Proposal for the construction procedures for the NSW chambers Harry van der Graaf, Nikhef Frascati, Nov
Aristotle University of Thessaloniki QC – QA readiness at AUTh tooling and procedures D. Sampsonidis, P. Charalampous, S. Kompogiannis, and C. Lampoudis.
WP7&8 Progress Report ITS Plenary meeting, 10 June 2014 LG, PK, VM, JR.
Results on a Large Area triple-GEM Detector at LNF 5 th RD51 Collaboration Meeting Freiburg, 25 May 2010 D. Domenici - LNF.
Irfu.cea.fr ATLAS-NSW 4 TH MMM WORKSHOP SELECTION CRITERIA FOR THE DECISION ON THE MM CONSTRUCTION SCHEME of June 2013 Patrick PONSOT for the CEA-Saclay-Irfu.
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
Emulsion Test Beam first results Annarita Buonaura, Valeri Tioukov On behalf of Napoli emulsion group This activity was supported by AIDA2020.
Rui De Oliveira Vienna March 2014 Industrialisation of Micromegas detector for ATLAS Muon spectrometer upgrade 1.
Update on Pavia MM mechanical prototype
Ladder Assembly All tools and jigs produced Glue dispensing works
new straw end plug: D=10.6 mm straws support frame Levan option
RPC built a new plastic (peek doped with CB)
News from Saclay F. Bauer, M. Boyer, D. Desforges, E. Ferrer-Ribas, W. Gamache, A. Giganon, P.F. Giraud, P. Graffin, S. Herlant, S. Hervé, F. Jeanneau,
MicroMegas Mechanical Meeting --- Cern April 2014
Mechanical analysis of Foam and plastic honeycomb panels
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
Presentation transcript:

MM mechanical prototype Work progress at CERN MMM Rome, 15/07/20131

Purpose  Demonstrate feasibility  Setup of basic infrastructure  Gain experience with  Materials  Construction/assembly ideas/schemes  Procedures  Precision (panel planarity, parallelism of skins, …)  Produce objects that can be measured  Establish an Assembly Manual MMM Rome, 15/07/20132

CERN mechanical prototype (1)  Full-wedge small sector quadruplet  Eta and stereo doublet  Drift gap spacers: 5 mm  Total thickness: ~80 mm  Gas distribution  Mesh? MMM Rome, 15/07/20133

4  All panels of equal thickness – 12 mm Frame of standard t=10 mm Al profiles 0.4 mm plastic mesh 9.5 mm foam panels  Skins – 0.5 mm FR4  Glue – Araldite 2011 – Araldite AY HY 991 – Araldite AY HY 951 CERN mechanical prototype (2)

The table  Size: 4 x 2.5 m  Flatness: ≤ 20 µm  Location: Bld. 153 MMM Rome, 15/07/20135

Vacuum Clarinet gas Skin (G10) Precision insert Rohacell honeycomb Vacuum Using Skin suction Tool Vacuum Expansive glue Vacuum Precision shim Stiff-back (1) MMM Rome, 15/07/20136

Stiff-back (2)  Simple stiff-back structure with suction heads (following small test structure) used for 2 x 1 m 2 prototype  CERN-DT group is working on a final system using a perforated honeycomb structure with a perforated lower skin  Work in progress  Small 50 x 50 cm 2 prototype ready for the test  Large, full wedge size, if prototype successful MMM Rome, 15/07/ mm

MMM Rome, 15/07/20138 Gluing (1) Step 1 – FR4 skins were placed and sucked on the table Step 2 – Plastic mesh was wetted with the glue and placed on the FR4 Step 3 – Frame foam panel were placed on the mesh

MMM Rome, 15/07/20139 Gluing (2)  Second skin was placed and sucked on the table  Glue was distributed on the surface  Plastic mesh was wetted by glue and placed on the skin  Prepared “half panel” picked up with the stiff-back structure and placed on the mesh  Calibrated shims were placed under the stiff-back

First experience (1)  Two full-wedge size drift panels were glued  The planarity of the panels seems good – to be measured on the laser interferometer  Araldite AY103 + HY991 seems the optimal  Some problems with the gluing  Some regions where mesh is not glued to the skin  Use other type of glue?  Change the gluing procedure?  Increase the glue gap? MMM Rome, 15/07/201310

MMM Rome, 15/07/ First experience (2) Full panel view Inner structure Problematic regions

Collaborative effort  CERN, Dubna, Lecce …  Drawings and calculations: Lecce and CERN  Infrastructure and tooling: CERN  Technical work: CERN, Dubna, Lecce + 3 summer students (2 physicist + 1 engineer) MMM Rome, 15/07/201312