1 PLANNING YOUR NEW RADIO FACILITY Don Mullally WILL-AM-FM-TV University of Illinois.

Slides:



Advertisements
Similar presentations
Using Ground Source Heat Pump The Avenue Centre.
Advertisements

WiFi Hotspots Internet Wireless Connection for Delegates at the UN
Architecture CAD living sleeping service SPACE PLANNING
HVAC CONTROLS (See section 18.9)
Environmental Controls I/IG Lecture 14 Mechanical System Space Requirements Mechanical System Exchange Loops HVAC Systems Lecture 14 Mechanical System.
Other Types of Cleaning
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
Chapter 10 Sanitary Facilities and Equipment
A GENERIC OFFICE WITHOUT THE WISENET SYSTEM A GENERIC OFFICE WITH THE WISENET SYSTEM.
PE EQUIPMENT AND FACILITIES.  Utilize equipment that is appropriate for the developmental level and skill level and that will provide a safe, non- threatening.
Construction Project Michael J. Bruno Bruno Construction Management.
Extensive culture: low intensity aquaculture providing only small increases over natural productivity. Extensive fish culture systems have low stocking.
Competency: Draw Floor Plans Objective: Demonstrate the rules and standards for electrical fixture placement.
Competency: Draw Electrical Plans
Housing and Equipment At some time in their teaching careers, most music educators will be called upon to offer suggestions and comments on a construction.
Chapter 3: The Central Training Room
Search Teams Training [school’s name here]. Place of the Search in the Plan The search of the school is a crucial part of our bomb threat response plan.
Who Put that Column into the Middle of the Room? Designing Functional, Flexible, and Forgiving Spaces for Library Instruction Paul Glassman Hofstra University.
Impacts of the School Environment on Children’s Health and Wellbeing Schools Capital Design Team Richard Daniels December 2005.
An Information Commons for Graduate Social Science Students Digital Social Science Center: an Information Commons for Graduate Social Science Students.
Room Planning, Service Area
Blue Prints.
EXTREME MAKEOVER OR GENTLE REMODEL Linda Demmers Infopeople 2006.
The Athletic Training Room. ► Multipurpose facility designed to accommodate a variety of athletic training needs ► Accessible to both male and female.
Strength Training and Conditioning Facilities Day 27 Reference: Earle and Baechle - Chapter 24.
Chapter 17 Electrical Plans.
Dirty Tour December 2005 UN Capital Master Plan. 2 Dirty Tour- introduction The UN building was a state-of-the-art, code compliant structure when it was.
NASA Shared Services Center John C. Stennis Space Center The NASA Shared Services Center is an efficient, flexible, multistory LEED™ Gold Class A facility.
NEW COMMUNITY FACILITY Adam Kroll - Lighting / Electrical - Consultant: Dr. Richard Mistrick - Tech 3: Schematic Design.
PERFORMANCE & CODE ANALYSIS TIMBer Inc. ·Brooke Fedder · Marie Rottschaeffer· Izzie Molinuevo· Tena Pettit·
Knocking The Rust Off The Rust Belt Calfee, Halter & Griswold LLP, The Calfee Building, 1405 East Sixth Street, Cleveland, Ohio Cleveland | Columbus.
COLLEGE OF SAN MATEO BUILDING 36 – SCIENCE / PLANETARIUM Design Build and Sustainability Sustainability Conference: Butte Community College August 3 rd.
Guiding Principles: –Neo Georgian Aesthetic – Civic proportions –Beautiful – “Wow factor” – distinguished –Campus Great Lawn with outdoor teaching opportunity.
1 ISE Differences between office and factory layout Product  Offices process information  Factories produce things Physical environment  Offices.
Office Layout Techniques and Space Requirements
Offices May 2nd, 2011.
Planning Back- of-House Support Areas Chapter 4 (c) 2014 by John Wiley & Sons, Inc.
Safety Training Presentation
Ductwork Systems and Supply Arch 432. What You Need To Know Become familiar with the materials sizing ductwork Understand sizing units.
Value of a Well Planned Space. Goals of a well planned space 1.Provides a physically safe environment for children 2.Provides children with areas that.
1 NEW FAIRFIELD FREE PUBLIC LIBRARY Renovation Project
HVACR416 - Design Heat Loss / Heat Gain Part 1. Why? The primary function of Air Conditioning is to maintain conditions that are… o Conductive to human.
DRO Facilities Management Workshop 1. Workshop Purpose  Broaden the knowledge and understanding of the Logistics Facilities Activity by familiarizing.
Blood Facts Mobile Blood Drive Sponsor (Indoor Facility) Below are requirements to sponsor a mobile drive: Minimum of 30’ x 40’ of total usable space (or.
Affordable housing project
Houston TranStar Building Expansion 2009 Status. Aerial of Existing Building.
Electrical Plans.
LIVING AREAS. Living area Part of the house that friends and guest see. It is usually a place of show, recreation and entertainment. It roughly consumes.
7 Planning the Living Area Chapter. Permission granted to reproduce for educational use only.© Goodheart-Willcox Co., Inc. Objectives Identify the three.
TELECOMMUNICATIONS SPACES
Furniture Arrangement & Traffic Patterns
Municipal Center Needs Analysis City of New Carrollton 100% Final Report MCA # /13/2015 Introduction Needs Analysis Existing Facility Analysis Process.
City of Peachtree Corners Facility Options. Assumptions City will need physical space to conduct business Council Meetings Boards and Commissions Daily.
Means of Egress Don Ebert- Risk Manager (509)
Planning Living Areas. What is a Living Area? Living Room Dining Room Family Room Entryways.
Bellringer 3/1 Grab a laptop Grab a laptop Open your PPT presentation to show me your logo and room information. Open your PPT presentation to show me.
ELECTRICAL WIRING WIRING BASICS Written by Bobby Joslin
Making a scale floor plan
Planning The Electrical System
The Data Center Challenge
Lighting Branch Circuit and Small-Appliance Circuits for Kitchen
Generic Site Preparation
Planning The Electrical System
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
ASHRAE, California Title 24, NEC
Managing Office Property
EDUCATION CENTER – SOLEDAD
INDUSTRIAL / COMMERCIAL Facility For Lease
Master Facilities Committee Evaluation and Identification
PE Equipment and facilities
Presentation transcript:

1 PLANNING YOUR NEW RADIO FACILITY Don Mullally WILL-AM-FM-TV University of Illinois

2 Basic Site Issues Adequate site size, including setbacks? Adequate satellite access? Existing structures? Adequate utility access? Adequate parking areas for staff & guests? Suitable public transportation?

3

4

5 BASIC SPACE ISSUES Site determines building footprint. Building footprint and number of floors control total size: “gross square footage.” Gross square footage minus “non-useable” areas = Net Assignable Square Feet. Ratio of NASF to GSF = “Efficiency factor” Maximize efficiency

6 MAXIMIZING EFFICIENCY Use “high density” filing and shelving systems Have as few hallways as possible Use hallways as “rear-door” service areas Modular office systems reduce walls and hallways Modular systems reduce air handling cost Modular systems allow future flexibility

7

8

9 OPTIMIZE USE OF NON-ASSIGNABLE SPACE Hallway wall-space is valuable Determine what equipment must move through hallways. Think of restrooms as “public space.” Think of lobbies and adjacent areas as “public space”

10

11

12

13

14

15

16

17 DECIDE WHAT SPACES (ROOMS) YOU NEED FOR EACH PURPOSE. Number and describe the room List ALL the equipment in the room List any special requirements Estimate the optimum size of the room

18 RS-1 Radio Production Studio Control Board approx 4’ x 3’ on table 6’ x 4’ Video monitor on swing-arm for AudioVault Speakers on each side of control board Swivel chair / anti-static floor mat Computer terminal, keyboard, and monitor * Filtered electrical outlets below control board, 20amps * Non-interruptable power supply to computers * Air temperature degrees, 60% humidity * Direct sight line to Master Control Room (MC1) * 150 sf

19 RO1 MANAGER’S OFFICE Standard office package 8 locking file drawers Routing switcher control High fidelity tuner/receiver Track lighting for wall décor TV receiver * 200 sf

20

21 PUBLIC SPACES Space for receptions / celebrations Adjacent space for overflow Conference facilities for public use Food service / catering facilities Adjacent restrooms for public functions Plan for easy maintenance

22

23

24 DETERMINE ADJACENCIES Which rooms/functions MUST be adjacent to each other? Which rooms/functions should be NEAR each other? Which rooms/functions should NOT be near each other? What are the most frequent traffic patterns? Studios at external walls? Or in inner core?

25

26

27 AIR HANDLING ISSUES Double-size air handling ducts: large volume at low velocity No sharp edges in ductwork At least two 90-degree bends in studio ducts Acoustic insulation inside ducts. No direct connections between audio sources No roof-mounted air conditioning systems

28 ELECTRICAL ISSUES Emergency power supply? How large? Uninterruptible power supply? Total electrical load? Other facilities sharing same feed? Alternate power sources? Automatic? Fluorescent fixture “hum?”

29

30