Reinforced Concrete QTO Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Pattern Layout, Pinning & Cutting
OBJECTIVES 1. Characterize the various stages leading to the production of finished blueprints. 2. Differentiate between an architectural schematic.
CONSTRUCTION BLUEPRINT READING
EDT 51-Floor Plan Design1 CHAPTER 12 Legal Descriptions and Site Plan Requirements Sacramento City College EDT 51 Kenneth Fitzpatrick, P.E.
MODULE THREE SCALES AND DIMENSIONS
PowerPoint Presentation
1 Telecom Cabling Ladder safety. 2 OSHA Office of Training & Education ation Telecom Cabling Stairways and Ladders.
Chapter 8 Plot Plans.
Construction Documents COMMUNICATION OF A DESIGN.
Blue Prints.
February 2009 How to Read a Measuring Tape. February 2009 Imperial units / imperial system Imperial units or the imperial system is a system of units,
Architectural Drawings
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Preparing and Using Schematics for Wiring Applications Using Cable
CONSTRUCTION BLUEPRINT READING
Grid references on OS maps
CONSTRUCTION BLUEPRINT READING
 Percentage Bar graphs are similar ways to pie graphs. They are used to show different amounts of related data.  They are construct using a single bar.
MODULE ONE BASIC BLUEPRINT READING PRINCIPLES
1 HVACR116 – Trade Skills Plan Views Elevations Plan Views Elevations.
Construction Drawing Occupational Safety and Fundamentals
Building Plans.
The grid method is an inexpensive, low-tech way to reproduce and/or enlarge an image that you want to paint or draw. The grid method can be a fairly time-intensive.
Chapter 36 Sectioning Basics. Introduction Sections –Drawn to show vertical relationships of structural materials Show methods of construction for framing.
EDT Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300/ENGR 306.
Technical Drawings and their elements Applications of Technology.
HVACR116 – Trade Skills Plan Views Elevations. Plan Views.
EDT Cabin Design Project - Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300 Kenneth Fitzpatrick, P.E.
Space Planning Chapter 7 and 16.
How to Read a Map Maps are the basic tools of geography. They enable us to show what is in an area and how they are related in terms of space on paper.
Interior Design II: Objective 5.02
Par Avion Air Mail A I R M A I L Module 4 Lesson 13 Find areas by decomposing into rectangles or completing composite figures to form rectangles. YOUR.
Property Inspection & Analysis: The Improvements
Objectives : Components of Architectural Drawings.
LOGO Chapter III Excel Functions Date: 1. LOGO Overview  Understanding Functions  Using Reference Operators  Understanding Functions Sum function Average.
Physics 12 Mr. Jean November 17 th, The plan: Video clip of the day Van de Graff Generator Notes on field lines which were missed Electric Circuits.
Lesson Plan For Day Two Power point presentation 30 min Video– AAA- signs, signals, etc. 20 min Quiz- Signs Etc 10 min Correct 10 min H/O- Signs 10 min.
Extracting Information
© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only 1 PowerPoint Presentation Publisher The Goodheart-Willcox Co., Inc.
Grid references on OS maps How to give four figure grid references.
Floor Plans Floor plans are the central or core drawings of any set of CD’s. They not only contain a tremendous amount of information for consultants and.
Drawing Floor plans.
Section 2 Drafting Techniques and Skills
Blueprint Reading and Care
Session 2: Identifying Drawing Elements; Dimensions and Drawing Scales; Using Scales
Unit 6.05 and 6.06-Learning about blueprints
Reading an Architect’s Scale
Principles of a Grid Reference
Objective 6.05: Types of Architectural Drawings
CONSTRUCTION MASTERS BONUS BONUS
Architectural Drafting
Architectural Drafting
Ordnance survey Maps.
Objective 6.05: Types of Architectural Drawings
Here are the outlines of the coasts and other significant topographic features. These mark the outlines of the plates ~ 15 million years ago.
Competency: Draw exterior elevations
Rectangular Coordinates Level control in trenches
Final Lab Exam 4 parts Fossil Correlation Relative Dating Contouring
Wiring the Light and Relay
DofE Gold Preparatory Map Skills
Reading a Tape Measure.
Door and Window Schedules
Investigation 1 – Earth is Rock
4-figure grid references
Objective 6.05: Types of Architectural Drawings
Unit 2: Design Fundamentals
Presentation transcript:

CONSTRUCTION BLUEPRINT READING GRID LINES AND KEY PLANS

CONSTRUCTION BLUEPRINT READING Grid lines are a very important component on blueprints, especially for large construction projects. They will appear on the structural, architectural and electrical drawings. These grid lines are similar to the grid lines used on road maps and serve the same purpose, to locate a specific area on the project.

CONSTRUCTION BLUEPRINT READING On one side of the drawing a series of numbers will be present with connecting lines attached to the perimeter of an object and passing through to the other end. On the top or bottom of the drawing a series of letters will be present. The combination of a letter and a number is used to pin point a specific location on the drawing.

CONSTRUCTION BLUEPRINT READING Foundation plan showing grid lines:

CONSTRUCTION BLUEPRINT READING When looking at the I-beams on a drawing you will notice that there are all typically spaced the same distance apart. Normal spacing between I-beams is 20’ to 25’, knowing that can enable you to do quick length calculations for cable footages and device placements.

CONSTRUCTION BLUEPRINT READING The I-beams along the top are spaced 18’ apart.

CONSTRUCTION BLUEPRINT READING Grid lines typically line up with the I-beams on a project, each I-beam will have either a letter or number designation and they are spray painted onto the I-beams. This method of using lines allows contractors to indicate half way points between grid numbers and letters, i.e.

CONSTRUCTION BLUEPRINT READING In many cases certain letters and numbers are omitted from the grid line system to avoid confusion. 0, 1, I, O, and Q are usually omitted form the grid line system.

CONSTRUCTION BLUEPRINT READING Using the grid lines, where is the center of the TR located? APPROX. M.3 X 2.8

CONSTRUCTION BLUEPRINT READING WHAT IS LOCATED AT L.5 X 2.5? FLOOR MOUNT ELEC./ V&D OUTLET

CONSTRUCTION BLUEPRINT READING By using the prints and looking at the numbers and/or letters on the steel columns you can orient yourself on site. Grid lines along with the north symbol will frequently be used to identify spaces and parts of the building. In the previous slide the electrical room and telecom room are located on the east side of the building.

CONSTRUCTION BLUEPRINT READING On large construction projects it’s necessary to cut a building up in sections so that they will fit on a drawing sheet. To do this architect's use a key plan that will appear in the drawing area of every plan, the purpose of the key plan is to identify that part of the project to which the sheet applies.

CONSTRUCTION BLUEPRINT READING The un-shaded portion of the key plan appears on other drawings, the shaded section of a key plan is the portion of the project represented on the drawing sheet that you’re looking at, in some case the shaded portion may be represented by cross hatched marks instead of shading.

CONSTRUCTION BLUEPRINT READING This project has four different sections; A, B, C and D, this means that there is a full set of blueprints for each section all included in the original roll of blueprints. There will be a match line that separates each section and there is a little overlap from one section to the other.

CONSTRUCTION BLUEPRINT READING The key plan indicates that you’re looking at section D

CONSTRUCTION BLUEPRINT READING As you move from section to section pay close attention to the match line. If you’re counting locations for a material count remember that there is overlap between sections so you could easily double count items. That means you will have to compare two sets of drawings for accuracy.

CONSTRUCTION BLUEPRINT READING H.4 WHERE IS THE MATCH LINE LOCATED?

CONSTRUCTION BLUEPRINT READING WHY IS THE GRID LINE SYSTEM MISSING THE “1” AND THE “I”?

CONSTRUCTION BLUEPRINT READING During the course of a project many changes will be made both small and large, when this occurs an addendum will be generated. An addendum is an official document that describes the changes to take place, this might mean moving a wall 1 foot or turning an office into a storage room.

CONSTRUCTION BLUEPRINT READING Addendums will include a NTS drawing showing the changes to take place and a scope of work to be done. The addendum will indicate the area to change using the grid line system and will be signed off by the architect or general contractor. The addendum becomes an official legally binding document and should be treated as such.

CONSTRUCTION BLUEPRINT READING Conversely, if you notice a discrepancy with a section of the building your working in, or if just need clarification with a section of the drawings you can generate an RFI (request for information). You will need to indicate what part of the building your requesting info for and the best way to do that is using both the key plan and grid line location.

CONSTRUCTION BLUEPRINT READING Based on the information provide which section is the work on this projected been done in? Is it the North, South, East or West wing? SECTION “D” WEST WING