NATM NEW AUSTRIAN TUNNELING METHOD.

Slides:



Advertisements
Similar presentations
VERSATILITY The compact size and lightweight of the BIGMAX TC crane makes it useful in many different applications. Especially where space may be limited.
Advertisements

Haivan Pass Tunnel Construction Project
A3 - dual carriageway link between London and Portsmouth 6.5km new road, 1.77km in bored tunnel £371 million Construction started January 2007 Project.
Theoretical solutions for NATM excavation in soft rock with non-hydrostatic in-situ stresses Nagasaki University Z. Guan Y. Jiang Y.Tanabasi 1. Philosophy.
Cairo Metro Line3 / Medinah Car Park II
Indeterminate Structure Session Subject: S1014 / MECHANICS of MATERIALS Year: 2008.
Tunnelling Methods.
ELECTRICAL SAFETY-RELATED WORK PRACTICES Qualified Persons Those people that have training in avoiding electrical hazards while working on or near exposed.
Smart Sensor Technology For Rail Network health Hawk Measurement Systems.
Forecast 10 years - Underground Space Technology - USHIJIMA Kunio (Civil) NOMURA Mitsugu (Civil)
H. MAINAUD DURAND, A. HERTY, A. MARIN, M. ACAR PERMANENT MONITORING OF THE LHC LOW BETA TRIPLETS: LATEST RESULTS AND PERSPECTIVES.
Dick McDonald Risk April 16, LCLS Conventional Facilities Dick McDonald Deputy Systems Manager.
CE 453 Lesson 24 Earthwork and Mass Diagrams
PRE-FABRICATED STRUCTURES
Foundation Engineering CE 483
SLOPE STABILITY IN OPENCAST MINES
Observational Methods and NATM
Management Definition, Nature, Importance And Functions of Management Presented By: Tanu Chadha.
GPS & Total Station Basics
Appendices Subpart R Steel Erection
Increasing the life cycle of existing grids to avoid high replacement costs of new systems By S.R.Sethi Member Delhi Electricity Regulatory Commission.
Homebush Bay Rail Link l 700 lineal metres of precast concrete arch l 9 different profiles.8 x 2.5 to 19 x 8 l 900 units. l Reinforced soil with precast.
Global Design Effort - CFS for Asian Single Tunnel Configuration Design Progress Masanobu Miyahara KEK.
Tunnel Engineering for Indian Railways
Slop Stabilization Pertemuan
General meeting LAGUNA LAGUNA – Fréjus site
LASER AND ADVANCES IN METROLOGY
Work Cell Design and Control
Department of Civil Engineering,
Underground Stations Typical Station Site Plan. Underground Stations Ground Conditions: Key Issues.
Mr.Medicine (A unit of MR Medicine India Pvt. Ltd.) Get Well Soon.
BEPCII Prealignment Installation Survey and Alignment Accelerator Center of IHEP Xiaolong Wang
4.4 SOIL NAILING SOIL NAILING IS A REINFORCEMENT METHOD TO REINFORCE THE GROUND WITH STEEL BARS OR STEEL BARS IN GROUT FILLED HOLES. IT IS MAINLY USED.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
PARISUTHAM INSTITUTE OF TECHNOLOGY AND SCIENCE DEPARTMENT OF AERONAUTICAL WELCOME STUDENTS BY ANBARASAN.T DEPT. OF AERONAUTICAL.
Modern GROUND IMPROVEMENT TECHNIQUES FOR HIGHWAYS
Human Resource Planning
Scope of Engineering Geology. Def. This deals with the application of geological knowledge in the field of civil engineering, for excavation of safe,
Dr. T.N.Singh Professor Rock Mechanics, Natural disaster, Climate change, Mining Research, Surface Mining.
FHI 32: FCC tunnel layout and transferline update Tuesday, 9 February 2016 CE Updates: Comparison of 100km Intersecting and Non-Intersecting options New.
MDI 9 th Meeting - 22 nd January 2016 FCC Experimental Caverns - Feasibility and Excavation C. Cook (GS), J. Osborne (GS),
Infrastructure and Operation meeting 20 th January 2016 Amberg’s Report Summary : Comparison of 100km Intersecting and Non-Intersecting options C. Cook.
Concept Design for LBNF Far detector (LAr single phase)
June Recent Development of DRFS (Fukuda) SCRF-Meeting 1 1 Recent Development of DRFS (Based on Japanese CFS Tunnel Plan) S. Fukuda KEK.
PRESENTED BY- Namrata M. Lolge (09CM16F) M. Tech. 1 st sem NITK.
Candidate: Chhatra B. Basnet Main Supervisor: Dr. Krishna K. Panthi (Department of Geology and Mineral Resources Engineering) Applicability of Unlined/Shotcrete.
Construction Beam Tunnel
SAFE MACHINE OPERATION Safety and Health Officer Certificate Programme
بسم الله الرحمن الرحيم Soil Nailing for slope stability
Soil mechanics and foundation engineering-III (CE-434)
Development and Application of High Strength FRP Pipes as Grouted- Reinforcing Members in Slope and Tunnel KSCE Annual Conference and Civil Expo 2004 Daewon.
LAGUNA-LBNO at Fréjus General Meeting June 2013, Geneva Giovanni Como, Francesco Amberg, Daniele Bronzetti 1.
Concrete Repair presented by: Amirhossein Jodeiri Mapua Institute Of Tecnology.
Therapeutic Exercise Foundations and Techniques Part II Applied Science of Exercise and Techniques Chapter 3 Range of Motion.
TcpTunnel.
Concrete Repair.
RISK ASSESSMENT FCC draft, 2. September 2015.
International workshop on micropiles – Venice, 30 may – 2 June 2002
Introduction to composite construction of buildings
Innovative tunnel waterproofing technology
UNIT-III Operations Management PREPARED BY CH. AVINASH.
Workshop on Tau-Charm at High Luminosity
16th Australasian Tunnelling Conference
Geotechnical Engineering II
IWM 2000 Turku, Finland Pasi Korkeakoski
Rock support & Reinforcement
Reedy River Basin Sewer Tunnel Project Update
ME321 Kinematics and Dynamics of Machines
Distance Measurement.
Distance Measurement.
Presentation transcript:

NATM NEW AUSTRIAN TUNNELING METHOD

HISTORY OF NATM The term New Austrian Tunneling Method Popularly Known as NATM got its name from Salzburg (Austria). It was first used by Mr Rabcewicz in 1962. It got world wise recognition in1964. The first use of NATM in soft ground tunnel in Frankfurt (Europe) metro in 1969. The basic aim of NATM is for getting stable and economic tunnel support systems.

DEFINITION OF NATM The New Austrian Tunnelling Method is a support method to stabilize the tunnel perimeter by means of sprayed concrete ,anchors and other support and uses monitoring too control stability.

BROAD PRINCIPLES OF NATM Mobilization of the strength of rock mass Shotcrete protection Measurements Primary Lining Rock mass classification Dynamic Design

WHY NATM Flexibility to adopt different excavation geometries and very large cross sections. Flexibility to install additional support measures, rock bolts, dowels, steel ribs if required. Easy to install a waterproof membrane. Easy to install primary support, i.e. shotcrete. TBM (Tunnel Boring Machine) is not an effective method as compared to NATM .

SUMMARY OF THE PROCEDURE IN NATM SHOTCRETING AT THE EXCAVATED AREA(PRIMARY LINING) PLACING OF THE WIREMESH ALONG THE FACEOF THE TUNNEL ERECTION OF THE LATTICE GIRDER ALONG THE FACE OF THE TUNNEL PERTICULAR TYPE OF ROCKBOLTING SHOTCRETING THE WHOLE ARRENGEMENT(SECONDARY LINING)

SEQUENCE OF EXECUTION OF NATM

CONCEPT OF 3D MONITORING 3D MONITORING IS NEW TECHNIQUE USING FOR TAKING THE RIGHT ALIGNMENT OF THE TUNNEL OPTICAL TARGETS ARE USED FOR DETRMINIG THE COORDINATES FOR MEASUREMENTS THE COORDINATES SHOULD BE CHECKED DAILY IT IS NECESSARY FOR THE TUNNEL AS BY IT WE KNOW ANY DISPLACEMENT AND WRONG ALIGNMENTS

General Optical Target

General Optical Displacement Monitoring Free Stationing

POINTS TO CARRY OUT A SUCCESSFUL NATM PROCESS Consideration of rock mechanics Selection of a proper profile Design of flexible support and slender lining (in rock) Careful excavation Maintenance of rock strength, avoidance of loosening and over-breaks Direct contact of rock/soil and support Continuous control by geotechnical measurements Installation of support without delay and in correct sequence

WHERE NATM IS USING IN INDIA PRESENTLY IT IS USING WIDLELY IN KASHMIR RAILWAY PROJECT THEY ARE USING IT IN THEIR TUNNELS LIKE IN PIR PANJAL TUNNEL , T-74R, T-48 ETC

THANK YOU FOR YOUR ATTENTION!