John Osborne GS/SE March 2013

Slides:



Advertisements
Similar presentations
SCHOOL OF CIVIL ENGINEERING Presented by: Jonathon Simons Sanjo Adeyemo Taiwo Oshodi An Investigation into the Geological Faults and Subsequent Construction.
Advertisements

Chp12- Footings.
Failure Case Study of Construction at a Solid Waste Site K. Madhavan, Ph.D., P.E., Dept. of Civil & Env. Engineering Christian Brothers University Memphis,
Tunnelling Methods.
Chapter 34 Bridge Construction.
John James Audubon Bridge Main Span Materials and Equipment Cement from Thailand Structural Steel from Japan Oscillator from Germany Wind tunnel analysis.
Foundation Systems.
Plasma Wakefield (AWAKE) Project Meeting 18 October 2012 Civil Engineering Feasibility Issues for the West Area EDMS : John Osborne GS-SE.
CFS challenges for a linear collider J.Osborne CERN ILC-GDE Dubna - 4 June 2008 OUTLINE : Introduction Civil Engineering -Geology (water, stability issues.
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
CONSTRUCTION.
Chapter 18 Foundations.
Preliminary studies for Muon shield modification to accommodate LCLS II Alev Ibrahimov December, 2010 BSY.
Foundation Engineering CE 483
Chapter 2b Foundations Shallow & Deep Foundations.
Preparatory Seminar for STL Examination By Dr. James Lau, BBS JP.
Other Construction Projects
Reading Structural Drawings
Underground Stations Typical Station Site Plan. Underground Stations Ground Conditions: Key Issues.
19 February Summary: Updating on the activities completed (Done) since the last meeting List activities on going (Next steps) and related Actions.
Earls Mill Road Retaining Wall Ground Anchors and Strengthening.
FCC Tunnel Civil Engineering and Geology John Osborne (CERN GS-SE) 4 April 2014.
PAVSYS PAVSYS ™ PAVSYS PAVSYS MODULAR ENGINEERED SUSTAINABLE HABITATS.
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
ILC experimental area - How to ‘develop’ CFS details for TDP (cavern size, number of shafts, HVAC, EL spec etc) ? - KEK site specific issues CFS V.Kuchler.
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
Civil Engineering and Services - drawings for CDR - CDR chapter J.Osborne and M.Gastal for CES WG 1.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
The four basic types of structures are :
Foundation Loads Dead Load Live Load Wind Load
1 TT10 Remedial works What is happening. 2 Compression failure in crown (some cases) Tension/Shear failure in shoulders (typical) Compression Tension.
CENF CIVIL ENGINEERING : - DESIGN TENDER AND ESTIMATED COSTS John Osborne GS/SE 19 July 2013.
CENF – Civil Engineering Extension B887 Status – 18 September 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
General Infrastructures Services Department Civil Engineering planning for LSS4 Option, presented at review workshop 30/7/ months Planning and Resources:
March 22, –  Design Concept & Hall Layout  Access Tunnel  Top heading Tunnel  Displacement of detector hall by push-pull operation.
MDI 9 th Meeting - 22 nd January 2016 FCC Experimental Caverns - Feasibility and Excavation C. Cook (GS), J. Osborne (GS),
Infrastructure and Operation meeting 20 th January 2016 Amberg’s Report Summary : Comparison of 100km Intersecting and Non-Intersecting options C. Cook.
Survey Meeting John Osborne, CERN 8 February 2016
CENF CIVIL ENGINEERING UPDATE : - SITE INVESTIGATION - CALL FOR TENDER FOR DESIGN & CONTRACT ADMINISTRATION SERVICES - 3D VISUALS FOR SURFACE STRUCTURES.
CENF CIVIL ENGINEERING UPDATE : - SITE INVESTIGATION - CALL FOR TENDER FOR DESIGN & CONTRACT ADMINISTRATION SERVICES John Osborne GS/SE 16 May 2013.
19 February Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi EHN1 civil engineering project status Summary: Updating.
COFFERDAMS.
SANKALCHAND PATEL COLLEGE OF ENGINEERING,
WP 17.1 Civil Engineering Platform height / vs option Status on M. Manfredi on behalf of WP17.1 team.
SECONDARY BEAM HANDLING AND INFRASTRUCTURE DESIGN STATUS BRUNO FERAL (CERN/EN) DIAMANTO SMARGIANAKI (CERN/EN) Project Leader: I.Efthymiopoulos (Cern/EN)
DESIGN OF AIRPORT TERMINAL AND CONTROL TOWER
1 Building Design Progress Dan Wilcox March 2012.
21 January Summary: Updating of the activities carried out on-site (Done) in DEC + ½JAN List activities on going (Next steps) and scheduled till.
10 December Summary: Updating of the activities carried out on-site (Done) in NOVEMBER List activities on going (Next steps) and scheduled for DECEMBER.
Part 10-2a Micropiles and self drilling rods in soil and rock engineering V-2009 (rev. II-2013) (Part 10-2a, PP 2007, animation+p/r : compr.)
FCC Underground Infrastructure
Civil Engineering for FCC-eh and LHeC
Jeopardy.
CLIC Civil Engineering Update
CLIC Civil Engineering Update
FCC Civil Engineering John Osborne, Jo Stanyard, Matt Stuart(SMB - Site Engineering - FAS Section) Cost & schedule Phase 3 - specification 10th May 2017.
$150K Chicago/ANL seed funding for Braidwood site investigation
Civil Engineering for FCC-eh IR
Arch205 Materials and building construction 1 foundation
4th Annual Construction Law Summit
Arch205 building construction foundation
Minuteman Vocational Technical Regional High School Progress
Building Construction I Sofia Sebastian 1
Building Frame (Column & Beam)
CMS Gantry for Detector Lowering
RDR Baseline Layouts for Interaction Region
Reedy River Basin Sewer Tunnel Project Update
An Introduction to Subway Construction Technology
Neutron guide Shielding Concept
Presentation transcript:

John Osborne GS/SE March 2013 Civil Engineering for CENF TT20/TT26 Junction Cavern John Osborne GS/SE March 2013

TT20 was tunneled, TDC2 was ‘open-cut’

Option 1 : Demolish TT20 / New Junction Cavern John Osborne GS/SE 7 March 2013

Option 2 : New TT26 ‘runs alongside’ TT20 with openings created later John Osborne GS/SE 7 March 2013

Concrete shielding and propping Area where side-wall will be ‘removed’

Option 2 : ARUP UK have developed a methodology to maintain TT20 Stage 1 Excavate surface layers and install piled walls to take out some of the lateral ground loading and to protect the tunnel from excavator/plant loading. Assumed internal column and block wall is installed before commencing

Stage 2 Prop wall as required. Excavate to arch spring line as symmetrically as possible.

Stage 3 Install lateral supports prior to deepening the excavation further

Stage 4 Install further lateral support as excavation is deepend

Stage 5 Construct new section of base slab and box footings. Move lateral support to inside box on one side

Stage 6 Install starter bars through tunnel lining, protected by internal block wall. Starter bars are tied into a steel channel on the inside face of the existing tunnel

Stage 7 Set steel and construct walls and roof slab for new structure. Install waterproofing around new structure. Backfill right side of arch with lightweight foam concrete

Stage 8 Construct the structural hanger wall to pick up the arch

Stage 9 Remove propping

Stage 10 Break out connecting wall and install steel frame to pick up lip of existing lining. Structure can stay like this until rest of project civils work is complete

Stage 13 Backfill around new structure

Option 3 : No works in TT20 during LS1 Section Plan Area of future opening Stage 1 – Piling Install contiguous piles through area of opening, secant piles elsewhere

Section Plan Stage 2 – Excavate open cut Sprayed concrete infill between contiguous piles Stage 2 – Excavate open cut Install temporary propping to limit wall deformation. Spray concrete between contiguous piles during excavation

Section Plan Stage 3 – Structural connection between pile and tunnel, part 1 Break out sprayed concrete between piles and infill between tunnel and pile incrementally

Section Plan Stage 4 – Structural connection between pile and tunnel, part 2 Install shear connectors between old tunnel and pile

Section Plan Stage 5 – Construct new tunnel box Box extent dictated by programme, box tied into pile at future openning

Section Plan Stage 6 – Backfill to just below surface

Approximate extent of ground slab Section Plan Approximate extent of ground slab Stage 7 – Construct ground slab Ground slab will be used to hang loads from new and old tunnel that are transmitted by the pile

Section Plan Stage 8 – Break out connection Incremental break out of box, pile and old tunnel lining to form opening (with perhaps a second opening for transport)

Option 2&3 : Risks Unknown TT20 construction quality Stability of TT20 with 15m long opening Differential Settlements Differential loadings during excavation could lead to severe cracking of existing tunnel Water Ingress Temporary propping inside TT20 required Longer construction time required compared to Option 1 John Osborne GS/SE 7 March 2013

CE Action List Price Enquiry for works issued for Site Investigation Bidders conference this week - 8 March 2103 (fixed co-ordinates needed) Execution of works 25th March - 26th April (with two machines) Geological report mid-May Can we drill far detector cores in this period ? Order placed for Geological follow-up and detailed report An offer received from a very experienced design company for tender design / detailed design / site supervision (for Primary Beam and Near Detector). If order placed immediately, and CERN data available, tender dossier ready September ? Impact on existing services (ventilation chimney, water pumping stn, buried electrical cable on surface etc) to be better understood How much of TT26 needs to be built in first phase Urgent need for final lattice design to advance CE layouts :length of Junction cavern to be defined John Osborne GS/SE 7 March 2013