ECE 496 DC Motor Design Group A December 01, 2003Mark Goettsch
Introduction Project Objectives Team Construction Controls Results Web Development Conclusions Questions
Objectives Each group must design, construct, and control a DC homemade motor, commutation system, control system, and a speed measurement device such that the machine assembly rotates at selected speeds. Build a motor capable of turning rpm Control the motor within 10 rpm
Team Structure Mark Goettsch Group Leader Control Group Shawn Peterkin Misty Maddox Brad Peterson Construction Group Mark Goettsch Jason Varner
Construction Armature Shaft and Insulation Windings Stator and Magnets Baseplate, Bearings and Supports Encoder Mounting Problems
Armature Plates 3/16” thick steel plates 2.5” diameter 17 total for approximately 3” 8 slots, ½” diameter
Shaft and Insulation Shaft Steel 5/8” Diameter 20” Long 4” cut down to 3/8” diameter to fit encoder Insulation Polyurethane spray from Lowe’s 4 or 5 coats Insulation Paper
Stator 4” steel pipe 3.625” diameter Adjustable air gap
Magnets 2 Pole ¼” thick Arc shaped long 12 total 60 degrees of separation between magnet pairs
Bearings and Support Steel baseplate and support plates Steel encoder plate Pillow block bearings 5/8” diameter
Commutator Brushes Helwig Carbon Brushes Concave Radius 0.375x0.750x1.000 Copper over PVC 1.5” Long 8 segments
Construction Problems Machining time Adjustable air gap Securing magnets
Controls
Approach Focus on Steady-State Response Simplicity QNIX and QMotor
Encoder US Digital E IHM-PKG3 E IHM-PKG3 Optical Encoder 1000 CPR
Wiring
Control Problems Working Computer Learning QNIX and QMotor Program quitting prematurely
Results Bonus Day Mounted Motor Unable to Spin 6 Points Competition Day rpm range ±2 rpm for 320, 400 and /30 points for steady-state No points awarded for transient
Web Development
Acknowledgements US Digital Corporation NE 34th Circle Vancouver, WA USA Electric Motor and Drives 2417 Hwy.29 N. Anderson, SC Owens Corning 412 W Whitner Street Anderson, SC Oconee Machine and Tool 2319 Sandifer Blvd. Westminster, SC 29693
Conclusions What we learned Questions Mark Goettsch Group A