Proficient Plant Operation by Senergy Consultants (P) Ltd

Slides:



Advertisements
Similar presentations
Company Profile National specialized in steel-House technology exploitation, designing, construction, National has had invested 2 million USD at first.
Advertisements

Senergy Consultants (P) Ltd
Total Utility Management Services, LLC is committed to helping your organization make the best informed energy decisions with decades of cost-proven results.
Process and Procedure Documentation. Agenda Why document processes and procedures? What is process and procedure documentation? Who creates and uses this.
Quality Management Training Quality circles Bench Mark Kaizen.
© AberdeenGroup 2009 Energy Management: Driving Value in the Industrial Environments Mehul Shah Research Analyst Matthew Littlefield Sr. Research Analyst.
Copyright 2010, The World Bank Group. All Rights Reserved. Statistical Project Monitoring Section B 1.
1 By Zenith Energy Services (P) Limited Hyderabad Presentation on Solapur Textile Cluster Solapur, Maharashtra State.
©2006 OLC 1 Process Management: The Foundation for Achieving Organizational Excellence Process Management Implementation Worldwide.
22000 Food Safety Management Systems
INDUSTRIAL & SYSTEMS ENGINEERING
Energy Conservation Topic “Role of Energy Manager” 8/7/20151 Engr. Ahsanullah Soomro.
TRP Chapter Chapter 4.2 Waste minimisation.
Industrial Standards Framework and Energy Management Aimee McKane, Lawrence Berkeley National Laboratory.
Energy Audit- a small introduction A presentation by Pune Power Development Pvt. Ltd.
Area of Study 3: The Operations Management Function
Energy Management Proposed At KTPS. Objectives for Energy Management Generate energy at lowest possible price Manage energy use at highest energy efficiency.
What is Business Analysis Planning & Monitoring?
© 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
ENERGY Conservation Consultancy By Ravindra M Datar Senergy Consultants (P) Ltd
Striving for Excellence INTRODUCTION Saket Projects Limited is a public limited multi- functionary organization established in 1995 with access to Technical.
1 By Zenith Energy Services (P) Limited Hyderabad Presentation on Surat Textile Cluster Surat, Gujarat State.
Managing Operational Energy in Buildings
Implementing ISO 9001 Our project plan Copyright ©2008 The 9000 Store.
Copyright 2010, The World Bank Group. All Rights Reserved. Statistical Work Plan Development Section B 1.
“Development of Dairy Cluster in Gujarat under BEE -SME Program "
CP methodology adapted to UNFCCC Swedish International Development Agency S ESSION 9.A United Nations Environment Program Division of Technology Industry.
A Cleaner Production Project in the South African Paper Industry – Lessons learnt Iain Kerr, MSc (Env. Biotech.) University of KwaZulu Natal, School of.
Copyrights I Global Manager Group | Revision 0.1 Feb 2009 | 1 GMG DEMO OF ISO: ENERGY MANAGEMENT SYSTEM AUDITOR TRAINING PRESENTATION KIT.
What we are today is because of YOU – Our Clients Business Consulting INTRODUCTION What is Business Consulting ??? Potential Maximization Through Growth.
1 Unit 1 Information for management. 2 Introduction Decision-making is the primary role of the management function. The manager’s decision will depend.
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
The Challenge  How can an organization in today’s lean operating environment provide high quality research service for its suppliers that is quantitative.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
Merger Integration, Process Improvement, Increased Collections And Cost Reduction within a Pharmaceutical Firm BackgroundBackground The client is a major.
IRIS - International Railway Industry Standard The Quality Standard for the Railway Industry ACRI Prague, 2nd April 2008 Angela de Heymer Manager Quality.
Proficient Plant Operation by Senergy Consultants (P) Ltd.
Southwold Enterprises Co.,Ltd. An outsourcing partner committed to your company.
UNIDO - Energy Efficiency Creating a Standard Framework for Sustainable Industrial Energy Efficiency Lorence Ansermet UNIDO Regional Office in South Africa.
EXTERNAL AUDIT STAGE - 1 BUREAU OF VERITAS CERTIFICATION (INDIA) PVT. LTD. EXTERNAL AUDITOR NAME Team Leader: Mr. Vinayak L. Sohani Auditor:Mr. Vinod.
Copyright 2010, The World Bank Group. All Rights Reserved. Statistical Project Monitoring Section A 1.
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
1 Are you really in control? 2 A Program-Focused Solution 3 How we help you succeed 4 Who We Are 5 Success Stories.
1 Improvement of Industrial Energy Efficiency in Nigeria Presented by UNIDO.
Gulay Litchfield For CQI-TECH PLC
FACILITIES PLANNING INTRODUCTION Form Follows Function Form and function should be one, joined in a spiritual union.
Info-Tech Research Group1 Manage the IT Portfolio World Class Operations - Impact Workshop.
Industrial and Manufacturing Engineering JACLYN VANGILDER LAURA PAZ VINCENT ISOPI.
Energy Auditing – Energy Conservation and Efficiency Measures PRESENTER Mr. A. Hamukale BENG, Meng,MBA,PEEIZ,REng.
Top lean six sigma consulting strategies for businesses Lean Six Sigma Manufacturing Consulting By: Group50.com.
1 Workshop “Energy Efficiency management in chemical Industry sector" Thessaloniki, Greece Use of CARE +Tools in Bulgaria energy management.
Turning Energy Data into Operations Intelligence Presented to: FMA September 17, 2013.
CORPORATE PARTNER IN DEVELOPING EFFECTIVE HUMAN RESOURCE.
BUSINESS STRATEGY AND PLAN 2010 Emerging Energy Solutions 1.
B U D I L U H U R U N I V E R S I T Y POST GRADUATE PROGRAM MAGISTER ILMU KOMPUTER (M.Kom) IS PROJECT MANAGEMENT.
Proposal and Company Information Document CONTENT About Indagatio Research Our Research Offerings Why Indagatio Research Our Work Process Project Snapshot.
Energetická náročnost budov
Fort Stanwix National Monument Energy Audit Contract
Seminar On Energy Audit Submitted To: Submitted By:
Energy Saving Bureau Industrial energy audits in coherence with Directive on the promotion of end-use efficiency and energy services.
Industrial Assessment Center Database
INTRODUCTION The company has been founded by a group of senior professionals having immense technical knowledge and experience in the respective fields.
PURCHASING AND SUPPLY MANAGEMENT
SYSTEMS INTEGRATED GRID MODELLING SOLUTIONS
OPS/571 Operations Management
Audit Planning & Service Method Geotek Global Certification Pvt. Ltd.
PREVENTIVE MAINTENANCE
Alabama Industrial Assessment Center
Fertilizer Industry Safety Information Analysis and Sharing Program
ENERGY Audit - Industry
Presentation transcript:

Proficient Plant Operation by Senergy Consultants (P) Ltd

Proficient Plant Operations Product needs to be competitive in market. Product needs to be competitive in market. Saving is the simplest & the best way to increase profits. Saving is the simplest & the best way to increase profits. Rejection & Wastages have controlling impact on product cost. Rejection & Wastages have controlling impact on product cost. Small steps lead to substantial improvements. Small steps lead to substantial improvements. Productivity improvement of over 10% is possible in most of the industries. Productivity improvement of over 10% is possible in most of the industries. Streamlining plant operations results in substantial reduction in working capital. Streamlining plant operations results in substantial reduction in working capital.

Senergy Synergybetween Our expertise on conservation of energy & Your experience & knowledge of process, operations, plant engineering, etc. To Save Energy

Senergy Leading Energy Conservation Consultants in India Leading Energy Conservation Consultants in India Conducting Studies for past 20 years. Conducting Studies for past 20 years. One of the first auditor to receive ISO certification. One of the first auditor to receive ISO certification. Team of experts headed by a technocrat from IIT Team of experts headed by a technocrat from IIT Customer driven company with many repeat orders & orders form group companies Customer driven company with many repeat orders & orders form group companies

Senergy Empanelled with Maharashtra & Gujarat Governments (MEDA & GEDA) Empanelled with Maharashtra & Gujarat Governments (MEDA & GEDA) BEE certified auditors BEE certified auditors Customer base of over 450 industries Customer base of over 450 industries Contributing Rs 50 crores/year, towards conservation of energy Contributing Rs 50 crores/year, towards conservation of energy

Senergy Interactive studies. Interactive studies. Practical & Realistic Suggestions. Practical & Realistic Suggestions. Turnkey Consultancy during Implementation. Turnkey Consultancy during Implementation. Long term services for Sustainable Savings & Continuous Improvements. Long term services for Sustainable Savings & Continuous Improvements. Basic & Advanced Training Programs. Basic & Advanced Training Programs.

Few of our clients Sterlite Industries Ltd Sterlite Industries Ltd South Seas Distillery South Seas Distillery Excel Industries Ltd Excel Industries Ltd Century Enka Ltd Century Enka Ltd Century Rayon Century Rayon Asian Heart Hospital Asian Heart Hospital Essel World Essel World EBG India Pvt Ltd EBG India Pvt Ltd Aarti Drugs Ltd Aarti Drugs Ltd Emco Ltd Emco Ltd PepsiCo India Ltd PepsiCo India Ltd ICI Ltd ICI Ltd USV Ltd USV Ltd Allana Industries Ltd Allana Industries Ltd Tata Chemicals Ltd Tata Chemicals Ltd Schenectady Herdillia ltd Schenectady Herdillia ltd Hindustan Lever Ltd Hindustan Lever Ltd Nicolas Piramal India Ltd Nicolas Piramal India Ltd Wyeth Lederle Ltd Wyeth Lederle Ltd DGP Hinoday Ltd DGP Hinoday Ltd GTC Industries Ltd GTC Industries Ltd M S E B M S E B Whirlpool of India Ltd Whirlpool of India Ltd Pidilite Industries Ltd Pidilite Industries Ltd Sachivalay – Gujarat Sachivalay – Gujarat Wochkhardt Ltd Wochkhardt Ltd

Methodology 1. Team formation 2. Identification of saving potential through Optimizing WastagesOptimizing Wastages Minimizing RejectionsMinimizing Rejections Conservation of energyConservation of energy Productivity ImprovementProductivity Improvement Control over Work in Progress InventoryControl over Work in Progress Inventory Monitoring Throughput / Manufacturing Lead TimeMonitoring Throughput / Manufacturing Lead Time 3. Formulate strategy for Implementation 4. Provide assistance during Implementation 5. Compute actual savings 6. Suggest monitoring system for further improvements

TEAM You and only you can save TEAM ensures Participation of all stake-holders Participation of all stake-holders Platform for immediate & correct evaluation of all suggestions (including ours) Platform for immediate & correct evaluation of all suggestions (including ours) Quick & Effective Implementation Quick & Effective Implementation Savings on sustainable basis Savings on sustainable basis Continual improvements Continual improvements Development of knowledge bank Development of knowledge bank

TEAM: Basic Constituents Core Team –Coordinator –Production Manager –Engineering Manager –Industrial/ Mechanical Engineer Task Force (s) - Coordinator - Coordinator - Cross-functional Members - Cross-functional Members

Rejections Identifying major sources of rejection Quantifying contribution of the individual source Estimating losses due to rejections Analyzing reasons for individual rejections Suggesting remedial steps to eliminate the sources / minimizing their impact

Wastages Identifying major sources of wastages Quantifying losses at various stages of operation Analyzing reasons for wastages Suggesting remedial steps to eliminate the sources / minimize their impact

Machine Productivity Computing minimum, average & maximum output from the individual machine / equipment Comparing the data with design data Analyzing reasons for the deviations, if any Estimating gains from productivity improvements Suggesting methods for improvements

Plant Productivity Computing minimum, average and maximum output for the individual production section Comparing established & design data Identifying bottlenecks Suggesting methods for de-bottlenecking Estimating gains from bottleneck removal

Work-in-Progress Estimating contribution of Work in Progress to overall inventory for individual machine / Manual operation Establishing desired level of inventory for the respective machine / Manual activity Estimating gains from reduction in the inventory level

Throughput Time Estimating actual throughput time for all the key products Computing theoretical through put time and manufacturing cycle efficiency for the respective products Establishing optimal through put time / manufacturing lead time Estimating savings in working capital

Energy Conservation Conduct Detailed Energy Audit covering Conduct Detailed Energy Audit covering –Electricity –Fuel –Utilities like air compressors, refrigeration system, blowers, pumps, steam, etc. –Estimating performance of all major equipments –Quantifying losses in the various distribution system like electrical cables, various piping –Analyzing cost of energy & suggest use of alternative source for the same –Provide concrete suggestions for conservation of energy

Schedule First month: Resources data collection / analysis First month: Resources data collection / analysis Wastages / RejectionWastages / Rejection ProductivityProductivity Work-in-ProgressWork-in-Progress Energy ConservationEnergy Conservation Second month: Identification of suggestions & finalization of strategies for implementation. Second month: Identification of suggestions & finalization of strategies for implementation. Subsequent months: Implementation of suggestions & computation of actual saving. Subsequent months: Implementation of suggestions & computation of actual saving. Overall study duration of 6 months Overall study duration of 6 months

Thank You!