2006 Technical Affairs Water Projects Department.

Slides:



Advertisements
Similar presentations
ACCESSING MINING AND MAJOR PROJECTS CONFERENCE 2012.
Advertisements

Visalia WCP Trickling Filter Upgrade Project 1994/1995 Trickling Filters, Pump Station and Flow Control Box Modifications.
Donegal County Council – Presentation to Oireachtas Joint Committee on Environment Transport Culture and Gaeltacht County Donegal - Overview Population.
Presented by: Ronald O. Nichols LADWP General Manager
Tozzi Qatar W . L . L . Presentation.
Appropriate Technologies Conference Simple chemical dosing systems in small water works Cape Peninsula University of Technology G. Mwiinga Cape.
CONTRACTOR OUTREACH PROGRAM September 25, Disaster Recovery Program  $5.08 Billion HUD Funds to Mississippi in form of Community Development Block.
American Recovery Reinvestment Act County and Municipality Awards.
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
The Al Huwailah Link Road Project (P021)
A New Building Data Center Upgrade capacity and technology step 2011 – May the 4 th– Hepix spring meeting Darmstadt (de) Pascal Trouvé (Facility Manager.
No.Name of PackageEstimate CostStatus IProjects approved. a.Remodeling of water supply distribution network Rs croresWorks under.
Your Water System Sources of Water reservoir underground aquifer Energy Sources pumps gravity Distribution Network of Pipes.
PNCWA Operators Conference Eastern Oregon Region AWWA/PNCWA Short School Water Project of the Year City of Arlington Mesa Industrial Park Water System.
IEE/12/064/SI /02/2015. Municipality of Kecskemét - General economic data  Capital of Bács-Kiskun county  Economic, administrative, educational,
Opportunity Day Opportunity Day The 1 st Quarter of 2009 Performance Wednesday 27 May
Water network in Meithalun Prepared by:-- -Khalid Nairat -Ghaith Daraghmeh -Mohammed Daraghmeh Supervisor:-- Dr. Amal Al Hudhud An – Najah National University.
TADIPUDI LIFT IRRIGATION SCHEME
An-Najah National University Faculty of Engineering Civil Engineering Department COST STUDY FOR TWO BEDS TO THE SAME PROJECT (construction main transmission.
Committed to providing safe, high quality water and related business services earning customer trust and confidence. Louisville Water Company Capital Program.
March 9, 2011 Report on Construct & Equip Wells (Moniter, 6400 South, 1330 East)
ALISAGAR LIFT IRRIGATION SCHEME – 2 years period
PUSHKARA LIFT IRRIGATION SCHEME (2 years period)
21 st Sep Election Process July & August
Presented by: Gary Rutledge, CEO Garrut Manufacturing Corporation.
ELCITA Update 25 th August Update – Estate Management E – Toilets 8 e-toilets operational and work order placed for 4 more e-toilets Under Ground.
About Us  We are a group of Mechanical Engineers specialized in Construction & Engineering Services.  Our mission is to provide highest quality of construction.
AUCTION TO SELL REAL PROPERTIES ALONG WITH A LAND PLOT Amur region, Tynda, ul.Radistov 8 (0.8738ha) RUSSIAN HOUSING DEVELOPMENT FOUNDATION.
PHASE – I & PHASE - II.
IARC Milestones completed Sept 2011: End of Tevatron Run, FESS obtains ~full access to infrastructure at CDF, PPD begins D&D in CDF assembly bldg Sept.
David Saenz Readiness for Oct 12, 2006 # Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities.
PACKAGE 22PACKAGE 23 Total Ayacut under this scheme: 50,250 Ac. KOILSAGAR LIFT IRRIGATION SCHEME, MAHABOOBNAGAR DISTRICT (FLOW DIAGRAM) Approach channel.
DISTRIBUTORIES (D19, D22, D25, D37, D39, D40 TO D55) CONSTRUCTION OF WHOLE DISTRIBUTORY SYSTEM, CM & CD WORKS AND MICRO NETWORK (FIELD CHANNELS) The main.
2015 Eastern Oregon Region AWWA/PNCWA Operator’s Conference Water Project of the Year City of Stanfield’s Water System Improvements.
PRESENTATION TITLE Presented by: Name Surname Directorate Date Briefing the Portfolio Committee on Water and Sanitation on Interventions to improve water.
ALMEER TECHNICAL SERVICES CO. W.L.L.
Personal details: ENG.Iqbal AL-tayyar Bachelor in Mechanical Engineering from Kuwait university. Director of Technical Supervision Department. Applied.
EASTERN MUNICIPAL WATER DISTRICT County Water Company Consolidation Project Greg Kowalski, P.E. Senior Civil Engineer April 1, EXHIBIT.
IRAQ’s OIL POLICY (2008 – 2017) Presented by: ENG. AHMED ALSHAMMA Deputy Oil Minister IRAQ.
SMALL BUSINESS OPPORTUNITY FORUM Water Department 2015 Capital Program & 2016 Outlook.
Water and Waste Department 2016 CAPITAL WORKS CONSTRUCTION PROGRAM Presentation to Manitoba Heavy Construction Association April 20,
PILOT PROJECT ON NRW IN SHEETAL PARK AREA OF RAJKOT CITY IN GUJARAT Danish Water Forum AND Rajkot Municipal Corporation.
-1- 游叡研幫工程司 Water Leakage Improvement Ray-Yen, YU Assistant Engineer Taipei Water Department 2013 Seoul Study Workshop.
PORTFOLIO COMMITTEE ON WATER AFFAIRS AND FORESTRY 03 MAY 2007 City of Matlosana 1.
Approve Change Order No. 4 for the Caylor Wholesale Meter Modification Item 4B.
1 Redevelopment Budget Director of Redevelopment Steve Pinkerton Director of Redevelopment Steve Pinkerton.
Data Center Stabilization
27-28 April 2015 Eng. Mubarak Yusuf Al-Kawari Presented by:
DZ01 – Marka D B E C B G A B C.
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
EXERCISES Two water reservoirs are connected by a pipe 610m of 0.3m diameter, f’=0.038 and the flow produced by the difference in water surface elevations.
WEST RAND DISTRICT MUNICIPALITY
Bills of Quantities Introduction to FIDIC - Bills of Quantities -
Perris Water Filtration Plant Membrane Upgrade – Phase I
An-Najah National University Faculty Of Engineering
Municipal Infrastructure
An – Najah National University
January 2016 December 2017 July 2015 June October 2014 Commencement of first contracts and site construction December 2017 Grand openning.
Design Of Water Distribution Network Of Misilyah Village Using EPANET
Qatar General Electricity & Water Corporation
Selat al-daher water distribution network
Geothermal district heating in the city of Kecskemét MLEI GeoKec – City of Kecskemét (HU) 21/03/ /03/2016 IEE/12/064/SI /03/2016.
Graduation project report II Supervisor: Dr. Anan Jayousi
Far Experimental Hall Hutches Civil Construction
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec ITEM 1 ITEM 2 ITEM 3
Water & Environmental Affairs
An - Najah National University Civil Engineering Department
An-Najah National University Civil Engineering Department Graduation project  Hydraulic analysis & Redesign of Al-Masaken & Old Askar Camp Water Supply.
PUBLIC HEARINGS ON CONDITIONAL GRANTS AND CAPITAL EXPENDITURE:
MANGAUNG METROPOLITAN MUNICIPALITY
Presentation transcript:

2006 Technical Affairs Water Projects Department

 Water Projects Department Role  Summary of Running Projects  Recently Awarded Contracts  Under Tendering Projects  Budget

Water Projects Department Role In order to help kahramaa achieve its objectives, WP role is to provide Kahramaa with design engineering and execution of all water related projects and other civil constructions such as :

1. Construction of New and Refurbishment of Water Retaining Structures e.g. 1.1 Reservoirs (RC, steel, GRP, glass fused etc..) 1.2 Tanks (RC, steel, GRP, glass fused etc.. ) 2. Construction of New, Extensions, Refurbishment of Pump Stations. 3. Construction of Primary Mains downstream the Power and Desalination Stations 4. Extensions and Replacement of Primary Mains 5. Extensions and Replacement of Distribution Networks 6. General Buildings (e.g. Warehouses, Administration Buildings Water Laboratories,..etc)

Water projects department currently has a number of running contracts. Some contracts are newly awarded; And some others are being prepared for tendering soon. In addition New projects are frequently received from the end user (WNA) to cover the timely development in QATAR.

Summary of Running Projects

1. Ras Laffan A & B water pipelines and associated reservoirs. Total amount: QR 911,927, Extensions of Mains at Greater Doha, Al khor Ph I & II, Al Nassiriyah, Al Ghuairiyah and Muraikh. Total amount: QR 285,217,742 Total amount: QR 285,217, Replacement and Upgrading of Mains at Doha and Mesaieed. Total amount: QR 270,932,629 Grand Total Amount for Running Projects: QR 1,468,077,435 Ras Laffan Pipeline & Associated Extension of Mains Rep. & Upgrad. Of Mains

Recently Awarded Contracts Water supply Upgrading Works Replacement Works

Project #: Title Description of Works Length of Mains (Kms) Start DateCompl. Date Contract Value in Ml. QR Contractor GTC 60/2005 Upgrading New & Old Salwa Distilate & Rising Mains Supply and lay of DI pipes ranging in size from 400 mm. to 1400 mm. 31 Al Jaber Engineering Co Jan 2006Jan 2007

Project #: Title Description of Works Length of Mains (Kms) start Datecompl. Date GTC 63/2005 Replacement of Dist. Mains at Doha (Package 1) Supply and lay of DI pipes ranging in size from 100 mm. to 900 mm 75.8 Jan 2006 Sep 2007 Contract Value in Ml. QR 99.7 Contractor AL Waha Contracting & Trading Co.

Project #: Title Description of Works Length of Mains (Kms) Start Date Compl. Date Contract Value in Ml. QR Contractor GTC 69/2005 Replacement of Water Dist. Mains at Doha & Messaieed City Supply and lay of DI pipes ranging in size from 100 mm to 600 mm Boom Construction Co. Feb 2006Feb 2008

Project #: Title Description of Works Length of Mains (Kms) start Date Compl. Date Contract Value in Ml. QR Contractor GTC 70/2005 Water Supply to Madinat Alshamal, Aljerian & Um Salal Ali Supply and lay of DI pipes ranging in size from 100 mm to 600 mm HBK Co. Apr 2006 Oct 2008

GTC 71/2005 Upgrading of Pumping Stations at Salwa Industrial Area & Bani Hajer Replacement of 32 old pumps with new VFD pumps at 5 water Stations, Old Salwa, New Salwa, Airport, Salwa Indut. Area and Bani Hajir including replacement of old equipment. May 2006Oct 2007 Project #: Title Description of Works Start Date Compl. Date Contract Value in Ml. QR Contractor Torishima 132

Future Projects Under Tendering Reservoirs & Pump stations Pipelines Works Replacement Works

Title Description of Works Length of Mains (Kms) Doha South Reservoir and Associated Pipeline 4 nos. Reservoirs and 8 pumps each of 450 liter per second at 55 meter head 35 Title Description of Works Madinat Al Shamal RPS & Associated Pipelines One 6 MIG RC reservoir + 4 new pumps each of 125 liter per second at 40 meter head.

Title Description of Works Length of Mains (Kms) Permanent Reservoir & Pumping Station at Shahaniyah to Doha 600mm dia pipeline, in addition to one 6MIGD Reservoir and New pump house including 4 New pumps 11

Title Description of Works Length of Mains (Kms) Ext. of Mains at Doha Suburbs Supply and lay of DI pipes ranging in size from 100 mm to 900 mm. 118 Title Description of Works Length of Mains (Kms) Upgrading of West bay & Gharafa Water Stations Supply and lay of DI pipes ranging in size from 400 mm to 900 mm+ Pump Stations 22.6

Title Description of Works Length of Mains (Kms) Provision of Distribution Networks at Doha &South Area (Phase1) Supply and lay of DI pipes ranging in size from 100 mm to 400 mm. 107 Title Description of Works Length of Mains (Kms) Supply and lay of DI pipes ranging in size from 100 mm dia. to 600 mm dia. at Doha and North Qatar 265 Provision of Distribution Networks at Doha & North Area (Phase1)

Title Description of Works Length of Mains (Kms) Replacement of Old Pipes at Various Locations Supply and lay of DI pipes ranging in size from 100 mm to 400 mm. 121 Title Description of Works Length of Mains (Kms) Replacement of Mains at Doha (Package-3) Supply and lay of DI pipes ranging in size from 100 mm to 900 mm. 100

Title Description of Works Length of Mains (Kms) Replacement of Dist. Mains at Doha Vicinity, Wakrah & Wukair package-2 Supply and lay of DI pipes ranging in size from 100 mm to 600 mm. 138

BUDGET

Thanks Kahramaa web site Presented By: Eng. Mohamad Thani AL-Maadead Head of design Water Projects