Instruction Manual for inserting the CMS ZDCs using the crane.

Slides:



Advertisements
Similar presentations
F&T Inc. OVERHEAD CRANE SAFETY.
Advertisements

Zebra® 105SL™ * Removing and Installing Printhead
1 Stripe 400/600 Removing and Installing Printhead Printhead Resistance Calibration Toggle Position Adjustment.
Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
MINE CLEARING BLADE (MCB) DEADLINING COMPONENTS
Servicing Welch DRYFAST ULTRA Pump Models 2032
Optical Manufacturing Solutions 1 Probe Assembly.
Sand Sampler User’s Manual Introduction Things to Know Before Starting your Sampler Starting and Operating Troubleshooting Maintenance.
Stanley DS11 Diamond Saw.
Click on this image to open the full PDF document.
GLOBAL LIFT CORP COMMERCIAL SERIES PORTABLE KIT Portable Kit -
1 Copyright  2005 All Rights Reserved A-dec 511 Dental Chair.
Digital StarLab Set-Up, Operation, Maintenance, and Teacher Manual for the Digital StarLab are in the links below or on the training tab in the BlackBoard.
Presented by: Ginnette Clark Terri Hall Robert Ishmael Michael Petry.
MyLock 644D Service Seminar.
ES1000C/1500C Battery Replacement Procedure. 1.Pull off the front panel.
1. Disconnect the saw from the power source.
CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
SGI Confidential Copan 400 Installation. SGI Confidential Installation Overview The approximate minimum time to complete this procedure is.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
1 ZDC Status, 9th December ‘07 Fitting in the TAN slot Getting in and out of the TAN Schedule Trigger Yasar Onel (Michael Murray) for ZDC group.
Mu2e Production Target Remote Handling By: Michael R. Campbell, Fermi National Accelerator Laboratory, , System Layout Basic.
L.C. Technology ROBOT ASSEMBLY. Base Assembly BASE File off raised tabs on each side of Servo. Place Servo in vice between Fibre Clamps. Raised Tabs Repeat.
Handy Store Fixtures Gondola Dolly Assembly Instructions
PXL insertion 1.PXL Insertion Steps after PXL installation system is aligned 2.PXL removal steps 3.Some design details 2/3/20131 Table of contents:
Marubot Football League Service Manual.
Service Seminar Memory Craft Table of Contents MC10001 Top Cover Removal…………………………………………………………………..…………1 Belt Cover Removal……………………………………………………………..……………2-4.
NUMI NuMI Hot Handling Jim Hylen (FNAL) NBI02 March 13, 2002 Page 1 NuMI Target Hall Radioactive Component Handling NuMI Target Hall Utilizes Three Basic.
Engineer Training Mechanical Overview. Engineer Training Confidential 2 XL1500 is both Roll-to-Roll and Roll-to-Sheet Printer MachineXL1500-2mXL1500-3mXL1500-5m.
ZDC Remote Handling System March 10, 2011 Project Status and Forward Planning Technical Implementation Group Meeting Paul Debbins University of Iowa.
Bachelor of Technology Mechanical
Servo ServoBot is a robot that cleans a thing using Servo Motor.
MC11000 Kit Replacement 1 1. Open the face plate and remove the 2 screws. Remove and discard the original face plate. 3. Remove the 2 white caps on the.
Addendum to EDMS document “Instruction Manual for inserting the CMS ZDCs using the HXTC crane” In addition to the ZDC detectors in the TAN instrument.
ZDC/Dummy Absorber Exchange Crane Proposal Paul Debbins Ianos Schmidt Univ. of Iowa - Nov. 5, 2007.
SOL-GEL COATING FACILITY CONCEPTUAL DESIGN REVIEW October 19, 2005.
CMS ZDC Remote Exchange Crane Paul Debbins University of Iowa June 26, 2008.
NuMI NBI2006 September 9, 2006 NuMI Repairs for Hot Components Jim Hylen / FNAL Page 1 NuMI Repairs for Hot Components (1 sievert = 100 rem) Problem On.
CMS ZDC Remote Handling Status LTEX Meeting - Sept. 13, 2012 The Crane Testing and Development has moved from SX5 to ISR: Crane #2 has been fully assembled,
ZDC Remote Handling Tool Structure and Force Analysis P. Debbins University of Iowa December 10, 2009.
XYZ 1330 Basic Operation Manual
P:\ISO \Work Instructions\Assembly\Options\ARMADILLO SWEEPER OPTIONS\10X ARMADILLO SWEEPER OPTIONS MODEL: KIT-MFG-ENG SHDN DSL M&FS SWA.
Drum brake components • The brake drum
SLHC Engineering Upgrade FCAL Remove-Install step by step procedure. Mircea Cadabeschi-University of Toronto March 01,
PS2200B/3000B Battery Replacement Procedure. 1.Disconnect the wire connecting the UPS and the battery pack. 2.Pull off the battery pack front panel.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
ZDC inside TAN – Crane position over TAN slot – lifting beam lowered to ZDC ZDC Sarco TAN.
Spring Hill Assembly1 InnoSys Park Brake Tool Master Control Panel Screens 1 3-Mar-2008.
IOPtiMate™ OT-135P2 Technical Training – Part I System Description, Installation & Operation IOP (07)
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
WP F/L Dom production. KM3Net meeting 2012 Erlangen - Edward Berbee - Nikhef22/06/20121.
Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd Sentek Sensor Technologies Installation of EasyAG 50 and EasyAG 80.
Computer Bunker Training Most classrooms contain a bunker equipped with a computer with an integrated DVD player and an ELMO for your use.
Planning for Proto-DUNE PD Installation and Cabling at CERN
X-Spot Lamp Socket Replacement Procedure
FlowArm PLTW Motions Computer Integrated Manufacturing
Easy Reach 7.0 Honda Element 2003
Easy Reach 7.0 Honda Element 2003
Maintenance masterdrive siemens
Garage Door Repair - Some Useful Tips
F&T Inc. OVERHEAD CRANE SAFETY.
Recap the basics Lesson 1.
1.11: Robot Controller.
Pre-Deploying Your SPYDERCRANE's Outriggers​
Recap the basics Lesson 1.
Task 1 You are going to use the Makey Makey arrow inputs to create a joystick / games controller. Step 1: Connect Makey.
CLEAR FLOOR TWO POST LIFT Operation instruction
BRAN: LS2-plans TREX M. Palm, E. Bravin, BE-BI-PM.
Presentation transcript:

Instruction Manual for inserting the CMS ZDCs using the crane

Summary Table ZDC REMOVAL PROCEDURE STEP 1: Set up 1.Test control system above ground 3 2.Moving Materials 4 3.Cables connections Laying of Cables. 7 5.Test crane movement without payload 8 6.Bring sarcophagus to TAN 9 7.Install rotation servo motor Control System Activation Crane rotation (to SARCO) Install elevator servo motor 18 STEP 2: Extraction of ZDC 1.Rotate crane to TAN and lower elevator to ZDC 19 2.Aline elevator to ZDC 20 3.Fasten vertical elevator to ZDC 21 4.Extract the ZDC 22 5.Rotate crane and insert ZDC in SARCO 23 6.Unfasten ZDC 24 7.Store ZDC in bunker 25 Continued on next page 1

Summary Table ZDC REMOVAL PROCEDURE STEP 3 : Insertion of steel bars 1.Raise crane to make space for steel bars 26 2.Bring steel bars to TAN using transpallet 27 3.Lower elevator to steel bars 28 4.Fasten elevator to steel bars 29 5.Extraction of bars and rotation over TAN 30 6.Insertion of bars in TAN 31 7.Disconnect elevator from bars 32 STEP 4: Clean up 1.Move empty crane over sacro 33 2.Disconnect servo motor from vertical elevator 34 3.Move empty crane back over TAN 35 4.Take empty sarco back to bunker 36 5.Remove rotation servo motor 37 6.Pull up control cables 38 7.Disconnect Cables from control system Connections Bring materials back 41 2

STEP 1 Op. 1: Test control system above ground. 1. B90 power cable 2. B90_RES cable 3. B63 power cable 4. B63_RES cable 5. Fake switch cable, shown in insert. 6. SPARE 7. Handset cable v 15A ___________________ Time : 5 min Operators : A and B

STEP 1 Op. 2: Moving Materials Bring downstairs control cabinet, remote control, motors, cables Reference List : 1.Control Cabinet 2.Remote Command Handset 3.Baldor BSM90 Servo motor (Rotation) 4.Baldor BSM63 Servo motor(vertical axis) 5.Cables ____________________ Time : 15 min Operators : A and B

STEP 1 Op.3: Cable Connections (A) Control System Installation (with cables connections) ____________________ Time : 10 min Operators : A and B 5

STEP 1 Op.3: Cable Connections (B) Control System Installation (cables connections) Reference List : 1. B90_PWR cable 2. B90_RES cable 3. B63_PWR cable 4. B63_RES cable 5. Limit_Switch cable 6. SPARE 7. Handset cable v 15A ____________________ Time : 5 min Operators : A and B

STEP 1 Op.4: Laying of Cables From the Control System to the ZDC Crane. ____________________ Time : 5 min Operators : A and B 20meters 15meters 7

STEP 1 Op.5: Test crane movement without payload Run the crane forward and backward through its entire range of motion without a payload. ____________________ Time : 10 min Operators : A and B One near TAN the other at the staging area 8

STEP 1 Op.6: Bring sarcophagus to TAN. Using the transpallet bring and empty Sarcophagus to the TAN. ____________________ Time : 5 min Operators : A 9

STEP 1 Op.7: Install rotation servo motor (A) 1) Connect the Baldor BSM90 Servo motor to crane 2) Connect cables to motor ____________________ Time : 10 min Operators : A and B

STEP 1 Op.7: Install rotation servo motor (B) Baldor BSM90 Servo motor (Rotation) : Assembly to the crane ____________________ 11

STEP 1 Op.7: Install rotation servo motor (C) Baldor BSM90 Servo motor (Rotation) : Fastening ________________ 12

STEP 1 Op.9: Control System Activation(A) 1.Power-ON(LV) 2.Emergency Stop&Key enabling system for HV 3. Switch control of HV motor power ____________________ Time : 2 min Operators : B 1 13

STEP 1 Op.9: Control System Activation(B) 1.Power-ON(LV) 2.Emergency Stop&Key enabling system for HV 3. Switch control of HV motor power ____________________ 2 14

STEP 1 Op.9: Control System Activation(C) 1.Power-ON (LV) 2.Emergency Stop&Key enabling system for HV 3. Switch control of HV motor power ____________________ 3 15

command button (rotate to TAN) command button (rotate to SARCO) command button (move UP) command button (move DOWN) Indicator light (move UP) Indicator light (move DOWN) Indicator light (rotate to TAN) Indicator light (rotate to SARCO) STEP 1 Op.10: Crane rotation to SARCO (A) Push the command button and keep it pushed to rotate the crane to SARCO ____________________ Time : 5 min Operators : B 16

STEP 1 Op.10: Crane rotation to SARCO (B) Wait until the crane is completely extended over the SARCO ____________________ 17

STEP 1 Op.8: Install elevator servo motor 1) Connect cables to Baldor BSM63 servo motor 2) Connect motor to the crane. ____________________ Time : 4 min Operators : A and B 18

STEP 2 Op.1: Rotate crane to TAN and lower elevator to ZDC 1.Bring back the crane in the starting position over the TAN. 2.Then lower the Overhead Beam of the Vertical Elevator close to the ZDC Module ____________________ Time : 5 min Operators : B b a 19

A View « A » STEP 2 Op.2: Aline elevator to ZDC Lower the Overhead Beam of the Vertical Elevator until the holes on Lifting Bridge shoe (1) are Alined with the holes on the ZDC supports (2) ____________________ Time : 2 min Operators : A and B

STEP 2 Op.3: Fasten vertical elevator to ZDC Fastening of the Lifting Bridge shoe to the ZDC supports with screws and nuts Reference List : 1. M12 screw (4) 2. M12 Nut (4) ____________________ Time : 3 min Operators : A and B

STEP 2 Op.4: Extract the ZDC Lift the ZDC calorimeter out of the TAN ____________________ Time : 2 min Operators : B 22

STEP 2 Op.5: Rotate crane and insert ZDC in SARCO 1.Rotate the crane until completely extended over the SARCO 2.Insert the ZDC calorimeter into the SARCO ____________________ Time : 4 min Operators : B 23

STEP 2 Op.6: Unfasten ZDC Remove the 4 screws and the 4 nuts from the ZDC supports ____________________ Time : 1 min Operators : A 24

STEP 2 Op.7: Store ZDC in bunker Bring the sarcophagus containing the ZDC to the bunker ____________________ Time : 4 minutes Operators : A 25

STEP 3 Op.1: Raise crane to make space for steel bars. Raise the Overhead Beam of the Vertical Elevator 10cm ____________________ Time : 2 min Operators : B a 26

27 STEP 3 Op.2: Bring steel bars to TAN using transpallet ____________________ Time : 5 minutes Operators : A

A View « A » STEP 3 Op.3: Lower elevator to steel bars Lower the Overhead Beam of the Vertical Elevator until the holes on Lifting Bridge shoe (1) are Alined with the holes on the supports of the steel bars (2) ____________________ Time : 1 min Operators : B

STEP 3 Op.4: Fasten elevator to steel bars Fastening of the Lifting Bridge shoe to the steel bar supports with screws and nuts Reference List : 1. M12 screw (4) 2. M12 Nut (4) ____________________ Time : 4’ Operators : A and B

STEP 3 Op.5: Extraction of bars and rotation over TAN a)Extract the bars from the SARCO b)Rotate the crane until the bars are over the TAN. ____________________ Time : 5 min Operators : B 30

STEP 3 Op.6: Insertion of bars in TAN Lower the steel bars into the TAN ____________________ Time : 3 min Operators : B 31

STEP 3 Op.7: Disconnect elevator from bars Unscrew nuts that link bridge shoe to the bars and then remove screws. Reference List : 1. M12 screw (4) 2. M12 Nut (4) ____________________ Time : 1 min Operators : A and B

STEP 4 Op.1: Move empty crane over sarco Lift the elevator bar and rotate crane over empty sarco ____________________ Time : 4 min Operators : B 33

STEP 4 Op.2: Disconnect servo motor from vertical elevator 1)Unbolt Baldor BSM63 Servo motor 2)2 disconnect cables ____________________ Time : 2 min Operators : A and B

STEP 4 Op.3: Move empty crane back over TAN Rotate crane over empty sarco ____________________ Time : 3 min Operators : B 35

STEP 4 Op.4: Take empty sarco back to bunker ____________________ Time : 4 minutes Operators : A 36

STEP 4 Op.5: Remove rotation servo motor 1)Uncable Baldor BSM90 servo motor 2)Loosen and remove bolts 3)Take off motor ________________ Time : 4 min Operators : A and B

STEP 4 Op.6: Pull up contol cables Gather up the cables from the Control System to the Crane. ____________________ Time : 2 Operators : A and B 20meters 38

STEP 4 Op.7: Disconnect Cables from control system Connections (A) ____________________ Time : 4 Operators : A and B 39

STEP 1 Op.7: Disconnect cable from contorl system (B) Reference List : 1. B90_PWR cable 2. B90_RES cable 3. B63_PWR cable 4. B63_RES cable 5. Limit_Switch cable 6. SPARE 7. Handset cable v 15A ____________________ Time : 3 min Operators : A and B

STEP 4 Op. 8: Bring materials back Bring control cabinet, remote control, motors, and cables upstairs. Reference List : 1.Control Cabinet 2.Remote Command Handset 3.Baldor BSM90 Servo motor (Rotation) 4.Baldor BSM63 Servo motor(vertical axis) 5.Cables ____________________ Time : 15 min Operators : A and B