Revisions To Heavy Duty Validation Report General Numerous clarifications to text as requested at December meeting Partial flow systems referred to consistently.

Slides:



Advertisements
Similar presentations
PMP Progress Since GRPE 55 GRPE 54 agreed a Roadmap of work to address concerns with ECE/TRANS/WP.29/GRPE/2007/8 ( adding particle number measurement to.
Advertisements

EPA Methods 3A, 6C, 7E, 10 & 20 Corrections to May 15, 2006 Final Rule That Updated the Methods That Updated the Methods Foston Curtis US EPA.
Worldwide Harmonized Heavy Duty Emissions Certification Procedure UNITED NATIONS 24th WHDC, Geneva, 03 June 2008 Informal document No. GRPE (56th.
PMP: SUB 23 NM MEASUREMENT RECOMMENDATIONS B. Giechaskiel, G. Martini Institute for Energy and Transport Joint Research Centre 3 April 2014.
Institute for Energy and Transport B. Giechaskiel, G. Martini
Summary 1 l The Analytical Problem l Data Handling.
EPA Clean Diesel Engine Implementation Workshop Shirish Shimpi Cummins Inc. August 6-7, 2003.
Particle Measurement Programme (PMP) Progress update
Validation of Analytical Method
Determination of System Equivalency – Starting note for WLTP IWG Meeting #8 in Pune, India Audi, EA-52, V2.0 WLTP-08-09e.
GRPE 70th session PMP INFORMAL GROUP progress report TO GRPE
WLTP DTP PM-PN Subgroup Activities, Progress & Future Plans 4 th DTP Meeting Geneva 12 th January 2011 Chris Parkin.
1 The Result of Japan’s Round Robin Engine Test: Measurement of PM and PN 3/30/2009 PMP Informal Meeting National Traffic Safety and Environmental Laboratory.
Repeatability and Reproducibility Analysis of the Round Robin Results.
PMPN Report to WLTP DTP 16 Jan 2013 Prepared by Caro Hosier Post 14 and 15th WLTP PMPN Meetings audio / web conferences.
REGENERATION ISSUES Institute for Energy and Transport Joint Research Centre B. Giechaskiel, J. Andersson, G. Martini 3 April 2014.
” Particulates „ Characterisation of Exhaust Particulate Emissions from Road Vehicles Key Action KA2:Sustainable Mobility and Intermodality Task 2.2:Infrastructures.
WLTP DTP PM-PN Subgroup Activities, Progress & Future Plans 7 th DTP Meeting Bern 12 th – 14 th September 2011 Chris Parkin.
1 Saxony-Anhalt State Environmental Protection Agency Wolfgang Garche Bukarest EU-Twinning Project RO 2006 IB EN 09 Wolfgang Garche Saxony-Anhalt.
PMP Progress Report Activities since GRPE 58 Heavy Duty Validation testing Exercise completed in October Draft report and draft proposal to insert PN measurement.
PM2.5 Model Performance Evaluation- Purpose and Goals PM Model Evaluation Workshop February 10, 2004 Chapel Hill, NC Brian Timin EPA/OAQPS.
WLTP DTP PM-PN Subgroup Activities, Progress & Future Plans 5 th DTP Meeting Dubendorf 12 th – 14 th April 2011 Chris Parkin.
WLTP - 5h DTP Meeting Zuerich DTP Subgroup LabProcICE slide 1 LabProcICE issues on DTP level Zuerich, April 2011.
Jan Gåsste, AVL MTC Hua Lu-Karlsson, Scania London, PMP Heavy-Duty Inter ‑ Laboratory Exercise Validation Exercise at AVL MTC.
WLTP Test Procedures for Chassis Dynamometer Testing Chris Laroo - U.S. EPA April 14, 2010 WLTP-DTP
Quality Assurance How do you know your results are correct? How confident are you?
Summary of the latest PMP related activities Giorgio Martini, Athanasios Mamakos* Institute for Energy and Transport Joint Research Centre * Southwest.
Assessment Criteria for the Acceptability of Cycle and Testing Procedure Informal working document DTP Subgroup LabProcICE slide 1 Assessment Criteria.
PMP: SUB 23 NM REVIEW B. Giechaskiel, G. Martini Institute for Energy and Transport Joint Research Centre 8 January 2014 GRPE-PMP
Worldwide Harmonized Heavy Duty Emissions Certification Procedure UNITED NATIONS 22nd WHDC, Geneva, 16 January 2008 GRPE/WHDC/FE08 Informal document No.
1 Commissioned by PAMSA and German Technical Co-Operation National Certificate in Paper & Pulp Manufacturing NQF Level 4 Perform physical and chemical.
GRPE 71 ST SESSION PMP INFORMAL GROUP PROGRESS REPORT TO GRPE 8 Jan 2015 Informal document GRPE st GRPE, 8-12 June 2015,
Worldwide Harmonized Heavy Duty Emissions Certification Procedure UNITED NATIONS 57th GRPE, Geneva, 15 January 2009 Informal document No. GRPE (57th.
ACEA PM-3 programme Caroline Hosier, Pilot, ACEA Task-Force Particulates (TF-PM) Ford Motor Company Draft presentation to GRPE Informal document No. GRPE-52-9.
AEGPL amendments proposals to Regulations n. 83 and 115 Bi-fuel vehicles – New definition and provisions GFV - Brussels, 15 th December 2011.
OICA presentation of ACEA PM-3 programme Caroline Hosier, Pilot, ACEA Task-Force Particulates (TF-PM) Ford Motor Company Preliminary results PMP: 1 st.
37 TH PMP MEETING Institute for Energy and Transport Joint Research Centre B. Giechaskiel, G. Martini 7 Oct 2015.
Emission source sampling and monitoring Topic 6 Ms Sherina Kamal May
PM and PN Emissions from Two Scania Euro V Engines Hua Lu Karlsson
EPA’s 2001-Published Heavy-Duty Diesel PM Test Procedure Changes Matthew Spears EPA’s Office of Transportation & Air Quality.
Joint Research Centre the European Commission's in-house science service JRC Science Hub: ec.europa.eu/jrc 38th UNECE IWG PMP MEETING Exhaust emissions.
JRC 30 March Particle Measurement Programme Exploratory work & Validation Exercise (JRC) First Validation Exercise comparisons B. Giechaskiel, G.
29/02/2016 Reproduction permitted with due acknowledgement DG TREN – WP500 CONCAWE LD Vehicle Testing.
Lab Report & Rubric Exercise. Title Title is descriptive and appropriate for the study conducted Interpret and analyze scientific information.
RDE PN-PEMS programme Progress Update F. Riccobono, B. Giechaskiel, P. Bonnel STU, IET, JRC, European Commission.
PN-Calibration Issues
India’s Comments on EPPR (Part-B2)
PMP IWG Progress Report
PMP Heavy Duty Validation Exercise
Presented by Harry C. Elinsky, Jr. Filtech, Inc.
Particle Measurement Programme - Report
Institute for Energy and Transport B. Giechaskiel, G. Martini
Preliminary results of the OEMs HDV PN-PEMS validation study
76th UNECE GRPE session PMP IWG Progress Report
HD ENGINE RAW PN MEASUREMENT
HD ENGINE RAW PN MEASUREMENT
WLTP DTP PM-PN Subgroup Activities, Progress & Future Plans
LDV Real Driving Emissions: - Drafting of physical PEMS protocol –
Inter-Laboratory Comparison Exercise CPC CALIBRATION
PMP – PN sub 23nm Route to transfer from ‘in case of urgent need’ into planned delivery into regulations PMP-48 Presentation from Technical Secretary.
COP statistic proposal for UN-WLTP
Francesco Riccobono, Barouch Giechaskiel, Pierre Bonnel
India comments on EPPR 23-33
GTR Corrections, Open Points, Expert Proposals and Confirmations in GTR 15 4/9/2019.
COP statistic proposal for UN-WLTP
PN Counting from Raw Exhaust via Fixed Dilution and PMP Round Robin Project JRC and ACEA.
Current status All European laboratories (except 3rd JRC measurement) have conducted their measurements Equipment finally returned to JRC US, Japanese.
PMP INFORMAL GROUP Exhaust particle emissions – progress report
ACEA and JRC PMP meeting 7/11/2018
PNC and VPR Validation PMP Meeting 30th March 2009
Presentation transcript:

Revisions To Heavy Duty Validation Report General Numerous clarifications to text as requested at December meeting Partial flow systems referred to consistently as PFDS throughout ‘background’ changed to ‘tunnel background’ throughout General Numerous clarifications to text as requested at December meeting Partial flow systems referred to consistently as PFDS throughout ‘background’ changed to ‘tunnel background’ throughout

Revisions To Heavy Duty Validation Report Executive Summary Exec Summary added outlining exercise and summarising conclusions Section 3.9 – Particle Number Measurement Systems ‘Alternative’ systems renamed ‘PMP type’ systems Description of PMP type systems tested added Description of additional instrumentation employed added Section – Summary of Preliminary Experiments Explanation of reason for <23nm solid particle investigations added along with reference to US study Explanation that high WHTC >3nm results are total particles added Executive Summary Exec Summary added outlining exercise and summarising conclusions Section 3.9 – Particle Number Measurement Systems ‘Alternative’ systems renamed ‘PMP type’ systems Description of PMP type systems tested added Description of additional instrumentation employed added Section – Summary of Preliminary Experiments Explanation of reason for <23nm solid particle investigations added along with reference to US study Explanation that high WHTC >3nm results are total particles added

Revisions To Heavy Duty Validation Report Section – Daily Protocol Description of Continuity Protocol Added Section 4 – Statistical Analyses Terminology aligned with ASTM/ISO Explanation of relevance of unbalanced sample equations adedd CoV’s defined Section 5.1 – Calibration and Validation, Mass Systems Observations on PM reference filter weighings added (no deviation from temperature or relative to humidity requirements but reference filter mass variability sometimes on border of +/-5ug criteria) Section – Daily Protocol Description of Continuity Protocol Added Section 4 – Statistical Analyses Terminology aligned with ASTM/ISO Explanation of relevance of unbalanced sample equations adedd CoV’s defined Section 5.1 – Calibration and Validation, Mass Systems Observations on PM reference filter weighings added (no deviation from temperature or relative to humidity requirements but reference filter mass variability sometimes on border of +/-5ug criteria)

Revisions To Heavy Duty Validation Report Section 5.2 – Calibration and Validation, Number Systems Description of Golden System calibration added Penetration measured with both monodisperse & polydisperse aerosol Dilution ratio measured using HC tracer + FID PNC linearity via primary method (i.e v electrometer), electrospray PAO aerosol Section 6.1 – Emissions Results, Full Flow & Partial Flow PM Purpose of PM measurements in this programme clarified (not making recommendations) Observations clarified as being observations of this programme only Section 5.2 – Calibration and Validation, Number Systems Description of Golden System calibration added Penetration measured with both monodisperse & polydisperse aerosol Dilution ratio measured using HC tracer + FID PNC linearity via primary method (i.e v electrometer), electrospray PAO aerosol Section 6.1 – Emissions Results, Full Flow & Partial Flow PM Purpose of PM measurements in this programme clarified (not making recommendations) Observations clarified as being observations of this programme only

Revisions To Heavy Duty Validation Report Section 6.3 – Emissions Results, Gaseous Emissions Observations on raw v dilute differences and CO and HC diluent background levels noted Comparison of variability to LD_ILCE added, comparison with WHDC data to be added Section 9.1 – Discussion and Overview, Particulate Measurement Filter loading recommendation deleted Tunnel background discussions, e.g. comparison with PM emissions results, clarified as being observations of this programme only Clarified that PFDSs used in this programme were relatively new and clean Clarified that, after exclusion of outliers all PM results were below Euro VI 10mg/kWh limit Comments on suitability of PFDS over CVS redrafted. PFDS may be preferable due to greater ease of controlling tunnel background. Where CVS used labs should take care to minimise tunnel background Section 6.3 – Emissions Results, Gaseous Emissions Observations on raw v dilute differences and CO and HC diluent background levels noted Comparison of variability to LD_ILCE added, comparison with WHDC data to be added Section 9.1 – Discussion and Overview, Particulate Measurement Filter loading recommendation deleted Tunnel background discussions, e.g. comparison with PM emissions results, clarified as being observations of this programme only Clarified that PFDSs used in this programme were relatively new and clean Clarified that, after exclusion of outliers all PM results were below Euro VI 10mg/kWh limit Comments on suitability of PFDS over CVS redrafted. PFDS may be preferable due to greater ease of controlling tunnel background. Where CVS used labs should take care to minimise tunnel background

Revisions To Heavy Duty Validation Report Section 9.3 – Simultaneous PN and PM Measurement Recommendations added for; 1 Hz PN sample flow signal (or feeding back sample flow) to increase accuracy of flow rate control Compensation for PN sample extraction in controlling PFDS proportionality Compensation for PN sample extraction in PM calculation for total sampling type PFDSs Section 9.10 – Alternative Approach To Sampling for PN Measurements Clarified that discussion of fixed DF approach is an observation on a potential alternative technique which may be worthy of further research in future, not a recommendation. Section 9.3 – Simultaneous PN and PM Measurement Recommendations added for; 1 Hz PN sample flow signal (or feeding back sample flow) to increase accuracy of flow rate control Compensation for PN sample extraction in controlling PFDS proportionality Compensation for PN sample extraction in PM calculation for total sampling type PFDSs Section 9.10 – Alternative Approach To Sampling for PN Measurements Clarified that discussion of fixed DF approach is an observation on a potential alternative technique which may be worthy of further research in future, not a recommendation.

Revisions To Heavy Duty Validation Report Section 10.7 – General Conclusions Clarified that PM consistently below 10mg/kWh, and therefore measurement technique is suitable for assessing compliance with Euro VI limits Clarified that PM measurements in this programme were generally not distinguishable from tunnel background Section 11- Recommendations Recommendations added that; PN Tunnel background should be monitored and minimised PN tunnel background subtraction should be permitted for CoP & ISC Higher PN variability on WHSC needs to be considered in limit value setting Retain 23nm PNC cut-off for heavy duty as well as light duty Compensate for PN sample flow extraction in controlling PFDS proportionality & PM calculation (total sampling type PFDSs) Section 10.7 – General Conclusions Clarified that PM consistently below 10mg/kWh, and therefore measurement technique is suitable for assessing compliance with Euro VI limits Clarified that PM measurements in this programme were generally not distinguishable from tunnel background Section 11- Recommendations Recommendations added that; PN Tunnel background should be monitored and minimised PN tunnel background subtraction should be permitted for CoP & ISC Higher PN variability on WHSC needs to be considered in limit value setting Retain 23nm PNC cut-off for heavy duty as well as light duty Compensate for PN sample flow extraction in controlling PFDS proportionality & PM calculation (total sampling type PFDSs)

Revisions To Regulation 49 Proposal Compensation For Particle Number Sample Extraction Where PN sample >0.1% of dilute exhaust gas flow, flow rate used for maintaining proportionality must be compensated by feeding back sample or mathematical correction. PN sample flow signal (or PN sample – equivalent returned flow) signal must be 1Hz and accurate to 0.1% of dilute exhaust flow rate For total flow type PFDS, PM must also be corrected for PN sample extracted Time Alignment Time alignment procedure redrafted for consistency with WHDC using ‘transformation time’ (t 50 ) Compensation For Particle Number Sample Extraction Where PN sample >0.1% of dilute exhaust gas flow, flow rate used for maintaining proportionality must be compensated by feeding back sample or mathematical correction. PN sample flow signal (or PN sample – equivalent returned flow) signal must be 1Hz and accurate to 0.1% of dilute exhaust flow rate For total flow type PFDS, PM must also be corrected for PN sample extracted Time Alignment Time alignment procedure redrafted for consistency with WHDC using ‘transformation time’ (t 50 )

Revisions To Regulation 49 Proposal Determination of Particle Numbers Clarified that instantaneous particle concentrations should be corrected to standard conditions Periodic Regeneration Results Additive regeneration adjustment (k) added as an option as per WHDC Weighted WHTC Result Cold start weighting factor changed to 14% in line with latest WHDC discussions Determination of Particle Numbers Clarified that instantaneous particle concentrations should be corrected to standard conditions Periodic Regeneration Results Additive regeneration adjustment (k) added as an option as per WHDC Weighted WHTC Result Cold start weighting factor changed to 14% in line with latest WHDC discussions

Revisions To Regulation 49 Proposal Equipment Specification Clarification inserted that sampling should be from a homogeneous flow Particle sampling probe/point and transfer tube inner diameter deleted Clarification added common or separate pre-classifiers may be used for PM and PN EN 1822 reference updated and equivalent standards accepted Calibration URL reference updated Clarification added that upstream and downstream concentration measurements used in pcrf calibrations should be corrected to the same conditions Requirement for confirmation of PND1 and ET temperatures clarified Equipment Specification Clarification inserted that sampling should be from a homogeneous flow Particle sampling probe/point and transfer tube inner diameter deleted Clarification added common or separate pre-classifiers may be used for PM and PN EN 1822 reference updated and equivalent standards accepted Calibration URL reference updated Clarification added that upstream and downstream concentration measurements used in pcrf calibrations should be corrected to the same conditions Requirement for confirmation of PND1 and ET temperatures clarified