Aggregate Planning and Master Scheduling

Slides:



Advertisements
Similar presentations
Topics to be Covered 1. Capacity Planning
Advertisements

Aggregate / Production Planning
IES 371 Engineering Management Chapter 14: Aggregate Planning
Chapter 12 Aggregate Planning.
Operations Management Aggregate Planning Chapter 13
Aggregate Planning 13 © 2011 Pearson Education, Inc. publishing as Prentice Hall.
PRODUCTION AND OPERATIONS MANAGEMENT
Aggregate Planning.
Ardavan Asef-Vaziri Systems and Operations Management
WEEK 11A – [S&OP] AGGREGATE PLANNING (CHAPTER 13) Planning levels (long, intermediate and short ranges and real time control); Planning & Control Model;
1 Introduction to Operations Management Aggregate Planning CHAPTE R 12.
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
Manufacturing’s Objectives
Aggregate Planning Chapter 11 MIS 373: Basic Operations Management.
Chapter 8 Aggregate Planning in a Supply Chain
© 2007 Pearson Education Sales and Operations Planning Chapter 14.
© 2008 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning Delivered by: Eng.Mosab I. Tabash Eng.Mosab I. Tabash.
Chapter 5 Aggregate Planning Operations Analysis Using MS Excel.
The MRP II Hierarchy. Long-Range Planning At the top of the hierarchy we have long-range planning. This involves three functions: resource planning,
Aggregate Planning and Master Scheduling
Intermediate-range capacity planning Usually covers a period of 12 months. Short range Intermediate range Long range Now2 months1 Year Aggregate Planning.
IES 303 Engineering Management & Cost Analysis | Dr. Karndee Prichanont, SIIT 1 Learning Objectives:  Understand the concepts and methods of aggregate.
Aggregate Planning.
Aggregate Planning and Master Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
Ardavan Asef-Vaziri Systems and Operations Management
Lesson 16 Aggregate Planning
Operations Management Aggregate Planning
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 13 Aggregate Planning.
OM4-1Aggregate Planning Chapter 14. OM4-2Aggregate Planning Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering.
Operations Management
11 Master Scheduling CHAPTER
CHAPTER 3 AGGREGATE PLANNING. LEARNING OBJECTIVES Define aggregate planning and how it is useful Identify optional strategies for developing an aggregate.
Aggregate Planning.
© 2008 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning PowerPoint presentation to accompany Heizer/Render Principles of.
Operations Management Aggregate Planning
Aggregate Planning Chapter 11.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 Aggregate Planning and Master Scheduling
Operations Fall 2015 Bruce Duggan Providence University College.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
Aggregate Planning Intermediate-range capacity planning that typically covers a time horizon of 2~12 months – may extend to as much as 18 months. Product.
Aggregate Planning and Master Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
Planning Horizons Today3 Months 1 year5 years Planning Horizon Short-range plans Job assignments Ordering Job scheduling Dispatching Intermediate-range.
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 13 Aggregate Planning.
Chapter 13 Aggregate Planning.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 16 Sales and Operations Planning.
14-1 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights.
Aggregate Planning and Master Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Operations Management
Aggregate Planning and Master Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Aggregate Planning.
14-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Aggregate Planning. Session Break Up Aggregate Planning Master Production Schedule.
Production Planning.  What to produce  When to produce  How to produce.
LESSON 2 Sales and Operations Planning (S&OP) and Aggregate Planning
SALES AND OPERATIONS PLANNING AGGREGATE PLANNING PRODUCTION PLANNING OPERATIONS PLANNING How to meet effectively and efficiently forecasted requirements.
Chapter 14 Aggregate Planning.
13 Aggregate Scheduling PowerPoint presentation to accompany
BUAD306 Aggregate Planning.
Operations Management
Basic Strategies Level capacity strategy: Chase demand strategy:
IOA- C th July.
13 Aggregate Planning.
Chapter 8 Aggregate Planning in the Supply Chain
Fundamentals of Production Planning and Control
Dr Sh Salleh bin Sh Ahmad
13 Aggregate Scheduling PowerPoint presentation to accompany
Production and Operations Management
Manufacturing’s Objectives
Aggregate Production Planning (APP)
Presentation transcript:

Aggregate Planning and Master Scheduling Chapter 11 Aggregate Planning and Master Scheduling

Chapter 11: Learning Objectives You should be able to: Explain what aggregate planning is and how it is useful Identify the variables decision makers have to work with in aggregate planning and some of the possible strategies they can use Describe some of the graphical and quantitative techniques planners use Prepare aggregate plans and compute their costs Describe the master scheduling process and explain its importance 11-2

Aggregate Planning Aggregate planning Intermediate-range capacity planning that typically covers a time horizon of 2 to 18 months Useful for organizations that experience seasonal, or other variations in demand Goal: Achieve a production plan that will effectively utilize the organization’s resources to satisfy demand 11-3

Sales and Operations Planning Some organizations use the term sales operations and planning rather than aggregate planning Sales and operation planning Intermediate-range planning decisions to balance supply and demand, integrating financial and operations planning Since the plan affects functions throughout the organization, it is typically prepared with inputs from sales, finance, and operations 11-4

Overview of Planning Levels Long-Range Plans Long-term capacity} 5 Location} 8 Layout} 6 Product design} 4 Work system design} 7 Intermediate Plans (This Chapter) General levels of: Employment Output Finished-goods inventories Subcontracting Backorders Short-Range Plans Detailed plans: Production lot size} 13 Order quantities} 13 Machine loading} 16 Job assignments} 16 Job sequencing} 16 Work schedules} 16 Overview of Planning Levels (chapter numbers shown) 11-5

The Planning Sequence 11-6

Aggregation The plan must be in units of measurement that can be understood by the firm’s non-operations personnel Aggregate units of output per month Dollar value of total monthly output Total output by factory Measures that relate to capacity such as labor hours 11-7

Dealing with Variation Most organizations use rolling 3, 6, 9 and 12 month forecasts Forecasts are updated periodically, rather than relying on a once-a-year forecast This allows planners to take into account any changes in either expected demand or expected supply and to develop revised plans 11-8

Dealing with Variation Strategies to counter variation: Maintain a certain amount of excess capacity to handle increases in demand Maintain a degree of flexibility in dealing with changes Hiring temporary workers Using overtime Wait as long as possible before committing to a certain level of supply capacity Schedule products or services with known demands first Wait to schedule other products until their demands become less uncertain 11-9

Overview of Aggregate Planning Forecast of aggregate demand for the intermediate range Develop a general plan to meet demand requirements Update the aggregate plan periodically (e.g., monthly) 11-10

Aggregate Planning Inputs Costs Inventory carrying Back orders Hiring/firing Overtime Inventory changes subcontracting Resources Workforce/production rates Facilities and equipment Demand forecast Policies Workforce changes Subcontracting Overtime Inventory levels/changes Back orders 11-11

Aggregate Planning Outputs Total cost of a plan Projected levels of Inventory Output Employment Subcontracting Backordering 11-12

Demand Options Pricing Promotion Back orders Used to shift demand from peak to off-peak periods Price elasticity is important Promotion Advertising and other forms of promotion Back orders Orders are taken in one period and deliveries promised for a later period 11-13

Supply Options Hire and layoff workers Overtime/slack time Part-time workers Inventories Subcontracting 11-14

Aggregate Planning Pure Strategies Level capacity strategy: Maintaining a steady rate of regular-time output while meeting variations in demand by a combination of options: inventories, overtime, part-time workers, subcontracting, and back orders Chase demand strategy: Matching capacity to demand; the planned output for a period is set at the expected demand for that period. 11-15

Uneven Demand and Two Strategies: 11-16

Chase Approach Capacities are adjusted to match demand requirements over the planning horizon Advantages Investment in inventory is low Labor utilization in high Disadvantages The cost of adjusting output rates and/or workforce levels 11-17

Level Approach Capacities are kept constant over the planning horizon Advantages Stable output rates and workforce Disadvantages Greater inventory costs Increased overtime and idle time Resource utilizations vary over time 11-18

Workers and inventory 11-19

Estimating Cost 11-20

Techniques for Aggregate Planning General procedure: Determine demand for each period Determine capacities for each period Identify company or departmental policies that are pertinent Determine unit costs Develop alternative plans and costs Select the plan that best satisfies objectives. Otherwise return to step 5. 11-21

Trial-and-Error Techniques Trial-and-error approaches consist of developing simple table or graphs that enable planners to visually compare projected demand requirements with existing capacity Alternatives are compared based on their total costs Disadvantage of such an approach is that it does not necessarily result in an optimal aggregate plan 11-22

Trial-and-Error Technique Assumptions The regular output capacity is the same in all periods Cost is a linear function composed of unit cost and number of units Plans are feasible All costs are associated with a decision option can be represented by a lump sum Cost figures can be reasonably estimated and are constant for the planning period Inventories are built up and drawn down at a uniform rate throughout each period Backlogs are treated as if they exist the entire period 11-23

Cumulative Graph 11-24

Mathematical Techniques Linear programming models Simulation models Computerized models that can be tested under different scenarios to identify acceptable solutions to problems 11-25

Aggregate Planning in Services Hospitals: Aggregate planning used to allocate funds, staff, and supplies to meet the demands of patients for their medical services Airlines: Aggregate planning in this environment is complex due to the number of factors involved Capacity decisions must take into account the percentage of seats to be allocated to various fare classes in order to maximize profit or yield Restaurants: Aggregate planning in high-volume businesses is directed toward smoothing the service rate, determining workforce size, and managing demand to match a fixed capacity Can use inventory; however, it is perishable 11-26

Aggregate Planning in Services The resulting plan in services is a time-phased projection of service staff requirements Aggregate planning in manufacturing and services is similar, but there are some key differences related to: Demand for service can be difficult to predict Capacity availability can be difficult to predict Labor flexibility can be an advantage in services Services occur when they are rendered 11-27

Disaggregation Aggregate Plan Disaggregation Master Schedule 11-28

Disaggregating the Aggregate Plan Master schedule: The result of disaggregating an aggregate plan Shows quantity and timing of specific end items for a scheduled horizon 11-29

Master Scheduling The heart of production planning and control It determines the quantity needed to meet demand from all sources It interfaces with Marketing Capacity planning Production planning Distribution planning Provides senior management with the ability to determine whether the business plan and its strategic objectives will be achieved 11-30

The Master Scheduler The master scheduler’s duties: Evaluating the impact of new orders Providing delivery dates for orders Deals with problems Evaluating the impact of production or delivery delays Revising master schedule when necessary because of insufficient supplies or capacity Bring instances of insufficient capacity to the attention of relevant personnel so they can participate in resolving conflicts 11-31

“frozen” (firm or fixed) “slushy” somewhat firm Time Fences Period 1 2 3 4 5 6 7 8 9 “frozen” (firm or fixed) “slushy” somewhat firm “liquid” (open) 11-32

The Master Scheduling Process Inputs Outputs Beginning inventory Projected inventory Master Production Schedule Forecast Master production schedule Uncommitted inventory Customer orders 11-33

Master Scheduling Process The master production schedule (MPS) is one of the primary outputs of the master scheduling process Once a tentative MPS has been developed, it must be validated Rough cut capacity planning (RCCP) is a tool used in the validation process Approximate balancing of capacity and demand to test the feasibility of a master schedule Involves checking the capacities of production and warehouse facilities, labor, and vendors to ensure no gross deficiencies exist that will render the MPS unworkable 11-34

MPS – Forecasts and Customer Orders 11-35

MPS – Projected On Hand 11-36

Determining MPS and Projected On Hand Week Inventory from Previous Week Requirements Inventory before MPS (70) MPS Projected Inventory 1 64 33 31 2 30 3 -29 + 70 = 41 4 11 5 40 6 7 -39 8 -9 61 11-37

Adding MPS and Projected On Hand to the MPS 11-38

Available-to-Promise 11-39