WisDOT - Bureau of Structures Brandan Burger.  Anything “structural” – change in loading, structural capacity, pile locations  If in doubt, call us!

Slides:



Advertisements
Similar presentations
Metro Muncipal Agreement Program
Advertisements

ODOT Structure Project Manager Training
Change Order Missouri Local Programs How to Complete a Change Order & Get it Approved.
Actions and Retrofit of Post Earthquake-Damaged Bridges
BRIDGE CONSTRUCTION INSPECTOR Practice Questions Next.
2013 Northcentral Region Construction Conference
Pavement, Geotechnical and Structures Group Safety Standards and Research Awtar Jandu Safe Roads, Reliable Journeys, Informed Travellers Bridge Owners.
Findings from On-site Inspection (Rt 202/US Rt 23 BRIDGE)
As told by Elizabeth Anderson, Stormwater and Erosion Control Engineer (SWECE), SE-Region.
SOUTHEAST PBES/ABC REGIONAL PEER EXCHANGE ARKANSAS STATE HIGHWAY & TRANSPORTATION DEPARTMENT FEBRUARY 26,
SPEED and STRENGTH SPEED and STRENGTH  When speed of construction and strength of slab are your concerns, the KWIK SLAB system is your fast and strong.
Oklahoma Department of Transportation Susan McClune Regulatory Services.
Bridge over BNSF Railroad 7 km East of Windham - East Bridge Replacement Project Using Accelerated Bridge Construction.
Chapter 34 Bridge Construction.
District 8-0 QA Review Trends Summary Documentation and Certification Project certifications for materials should be reviewed as they.
Asset Management Performance (Structures) Awtar Jandu Safe Roads, Reliable Journeys, Informed Travellers Bridge Owners Forum – Cambridge –16 Jan
National Bridge Inspection Standards (NBIS)
MAJOR REVISIONS TO THE POLICY FOR ACCOMMODATING UTILITIES ON HIGHWAY RIGHTS Presented By: Mark Attaway March 29, 2011.
 Project Delivery  Design Considerations  Lessons Learned.
Construction Loading Analysis 2010 Contractor Engineer Conference Bill Dreher Structures Design Chief WisDOT.
Project Closeout Issues A Review of Critical Tasks Required During the Closeout Process.
Green Light-Go Program Pennsylvania’s Municipal Signal Partnership Program April 7, 2015 Daniel Farley Chief, Traffic Signal and Arterial Management Section.
Todd Demski, P.E., CBI, CWI Fish & Associates, Inc. February 19, 2015
Schematic Design of an Accelerated Bridge Construction Project Michael P. Culmo, P.E. Vice President of Transportation and Structures CME Associates, Inc.,
I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.
SIGN MANAGEMENT UPDATE Tracy Nowaczyk Pavement Management and Operations Section Engineer Meeting Fall 2013.
LS Engineering Associates Corporation LS Engineering Associates Corporation CORPORATE PORFILE Engineering Services ■ Bridge Inspection ■ Bridge Design.
 Quality Management Program (QMP) Review  HTCP Program  IRI News.
Acceptance Process for Manufactured Products by Certification: A users guide for implementation of Materials Bulletin No. MB 06-02, DCE Memorandum No.
VALUE ADDED FEATURES Who’s Excited??? 2015 Construction Academy Larry Ritchie July 28 th, 2015.
1 8/29/2015WisDOT BTS MMS.  MIT – Materials Information Tracking (Field Version) Used by WisDOT/Consultant/& Municipal staff in the field to enter a.
Background Established by law in 2008 via the Clean and Affordable Energy Act. District Department of the Environment (DDOE) oversees the contract. The.
Old Policy – which no one ever seem to have heard of.
 Importance of Material Coordinators  Spec Requirement  CMM Requirement  General Description of Training  Materials Coordinator Learning Objectives.
Introduction to a pit installation
Office of Highway Safety Oversight of Construction Projects George Black.
WisDOT - Bureau of Structures Matthew Coupar.  Anything “structural” – change in loading, structural capacity, pile locations  If in doubt, call us!
Office of Highway Safety Gusset Plate Inspection Issues Mark Bagnard.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
Standardizing Transportation Project Submittals to DNR Team Jim Doperalski WDNR Mike Halsted WDNR Janet Smith WisDOT Troy Stapelmann WisDOT Standard Submittal.
How to Submit An Amendment Tips from the 21 st CCLC Unit Updated September 17, 2009.
Introduction to a pit-less lever scale “concrete deck” The scale to be shown is a B-Tek Side/rail Side/lever electromechanical Platform is 60’x11’ on.
ODOT Traffic Standards Engineer
Submittals. Submittals key to quality management of project Document or product turned in by construction team to verify that what they plan to purchase,
There are 2 Types of Bridge Inspectors – Class B and Class A.
Work Zone Safety and Mobility Transportation Management Plans Jason Gutting, P.E. Michigan Department of Transportation.
Presented to Wisconsin Department of Transportation presented by Traffic Operation Infrastructure Plan Team 3/10/08 Traffic Operation Infrastructure Plan.
0 Electronic Subcontracting Reporting System (eSRS) Department of Defense Government Training Submitting a SSR – Commercial Plan.
WisDOT - Bureau of Structures Brandan Burger.  Anything “structural” – change in loading, structural capacity, pile locations  If in doubt, call us!
Sign Structures Updates: Helpful Tips for Inspectors
MDOT Geotechnical Construction Support Anthony Pietrangelo, P.E. Geotechnical Construction Support Engineer Midwest Geotechnical Conference September 22,
11/23/2004Module # 11 The NCSX Project Web An Indoctrination and Overview.
Caltrans Bridge Construction Forum 2007
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Introduction to BearQuest 1- 1 Getting the training you need1-2 Logging on and Getting Access1-3 Starting your Request1-6 Basic Screen Navigation1-8 Course.
Role & Responsibility for Quality Assurance What is your opinion on this topic heading? Role and Responsibility of: Role and Responsibility of….(Er.) for.
Offsite manufactured Bridges
Required Drawings and Info for Formwork or Scaffold Design
There are 2 Types of Bridge Inspectors – Class B and Class A.
Implementation of Computer Maintenance Management system - CMMS
New Bridge Construction
Acceptance Process for Manufactured Products by Certification:
Emphasis on Quality Rochester’s City Owner Contract Process
Board of Commissioners Meeting
Navigating FDOT Specifications and Standards
Usually occur every 3 to 5 years.
QC Personnel Responsibilities
Chapter 4 Types of Signs Traffic Signs 101 April 24, 2018.
Chapter 6 Sign Components
WisTMP 2.0 Update Andy Heidtke, PE Statewide Work Zone Design Engineer
Presentation transcript:

WisDOT - Bureau of Structures Brandan Burger

 Anything “structural” – change in loading, structural capacity, pile locations  If in doubt, call us! See Structures Contacts Handout BOS Contacts.doc  Remind Contractor to go thru Construction Staff for answers

 Proper rebar clearance  Release welded tabs prior to deck set

 Plan details for fill at wing tips  Proper Fill = Minimize Future Erosion

 Overhead sign supports, sign bridges, traffic signal monotubes, high mast light poles  Inspect at time of installation  Proper lubrication of bolts is critical  New – bolt suppliers paperwork should include suppliers rotational capacity test  New – Pre-installation test for direct tension indicator (DTI) washers - contractor should submit form DT2322 to engineer  Schedule an in service initial inspection prior to opening to traffic - NC bridge maintenance ancillary inspector  Ancillary Structures QA/QC Training on April 9th

 Inspect temporary structures before opening to traffic Conform to NBIS & department’s structure inspection manual  Guidance in CMM: Chapter 5 Structures  Contractor’s Responsibility Included in Std. Spec Submit DT2007 to the engineer & BOS Maintenance Section  Inspector must be department-certified active team leader List online – see CMM

 New Structural Approach Slabs US Highways & Interstates

 Bridge Manual – ABC chapter  Recently Completed WisDOT projects: Precast pier columns & pier caps; Inverted T girders; SPMT move.

 Submit electronic copy via .  Pile forms:  dt1315.xls dt1315.xls  dt1924.doc dt1924.doc

 Probing during deck pour and dry run  Top Cover  Deck thickness  See CMM

 Upcoming change for 2015  New installation requirements: ACI/CRSI Certified Installer, or Field Verification by Non-Destructive Pullout Testing Implementation as a part of (and guidance provided in) 2015 Standard Specifications

 Std. spec.“As approved by the Engineer”  Does not have to be on Approved Products list.  Engineer should read manufacturer’s information and determine if it is appropriate.

 Call us with Questions  We look forward to another great year of bridge construction! THANK YOU!