Advanced Scheduler for Wonderware MES

Slides:



Advertisements
Similar presentations
© 2009 OSIsoft, Inc. – Company Confidential 1 Empowering Business in Real Time Regional Seminar Series Presents: Jonathan Procopio, Project Engineer,
Advertisements

Master Data for SCM (1) Master Data for Demand Planning & Fulfillment Processes EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2012.
19-20 November, 2008 | Copenhagen. Christian Rytt & Thomas Jensen Program Managers Microsoft Corporation NAV08.
Inventory, job costing, manufacturing service and distribution Ostendo® adds advanced Add-on solution for MYOB, Quickbooks and Sage OSTENDO.
Wonderware Performance Software
A tour of the integration between Macola ES / Progression and Preactor V11 Preactor.
A Day in the Life of a Planner Copyright © 2009 Idhasoft Inc.. All Rights Reserved. Copyright © 2009 Idhasoft Inc. All Rights Reserved.
©2009 GE Intelligent Platforms All Rights Reserved Customer Example 1 Eka Expancel Produce expandable microspheres used in other products, like auto &
1 Chapter 12: Decision-Support Systems for Supply Chain Management CASE: Supply Chain Management Smooths Production Flow Prepared by Hoon Lee Date on 14.
MRP and Related Concepts
Supply Chain Operations: Making and Delivering
The Production Process
22–1. 22–2 Chapter Twenty-Two Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Information Systems within the Organization
Increase Your Manufacturing Efficiency with QAD’s Planning and Scheduling Workbenches Gary Wasserman – Applications Specialist.
Achieving Operational Excellence and Customer Intimacy:Enterprise Applications Chapter 9 (10E)
Production Scheduling: What Tool is Right for You?
Wonderware Operations Software “Improving Manufacturing Operations”
Production Planning Processes Theories & Concepts
Traceability Using QAD’s Enterprise Edition
The Magical World of Chocolate Manufacture
Chapter 12 MRP and ERP.
FLEXIBLE MANUFACTURING SYSTEMS. FLEXIBLE MANUFACTURING SYSTEMS MODELING AND ANALYSIS OF MANUFACTURING SYSTEMS.
Rodney Mullins, Manufacturing Consultant InSource Software Solutions Business Center Drive Richmond, VA (804) MES “Unlocking The Value.
Andrea Sartori Solution Architect EMEA
Operations Management Contemporary Concepts and Cases Chapter Thirteen Scheduling Operations Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights.
X-Change 2007 User Group Conference Ugan Maistry Wonderware Shop Floor to SAP Top Floor using SAP xMII.
ISPE/MESA Seminar Merck Sharp & Dohme Biologics Ireland Delivering value from MES: Optimizing Manufacturing Efficiency Paul Murray MES.
Electronic Commerce Semester 2 Term 2 Lecture 29.
The Microsoft Office 2007 Enterprise Project Management Solution:
Production visibility: KPI’s in Real-time BASF – The Chemical Company
Deployment & Available-to-promise (ATP) in SCM EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
QAD Master Scheduling Workbench (QAD MSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC MMUG.
Over, Short and Damaged Data to Manage Unsaleables Understanding a structured Over, Short & Damaged (OS&D) program can drive value though process controls.
McGraw-Hill/Irwin ©2008 The McGraw-Hill Companies, All Rights Reserved SECTION 8.1 SUPPLY CHAIN FUNDAMENTALS.
Master Data for SCM (1) Master Data in Demand Planning & Fulfillment Processes EGN 5346 Logistics Engineering (MSEM, Professional) Fall, 2013.
Thursday Night Operations Management Class 7. Chapter 14 Resource Planning.
Purpose: These slides are for use with customers by the Microsoft Dynamics NAV sales force and partners. How to use: Add these slides to the core customer.
ERP. What is ERP?  ERP stands for: Enterprise Resource Planning systems  This is what it does: attempts to integrate all data and processes of an organization.
QAD Production Scheduling Workbench (QAD PSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC.
Supply Chain Management AN INITIATIVE BY: VAINY GOEL BBA 1 MODI COLLEGE.
How to Sell Manufacturing Foundation Presenter. Agenda What is Microsoft Navision Manufacturing Foundation? Naming Positioning Why We Enhanced Our Manufacturing.
SCM Master Data - 2 Master Data for Distribution & Production Processes EGN 5346 Logistics Engineering (MSEM, Professional) Fall, 2013.
1 Copyright © 2004, Manugistics, Inc. All rights reserved. Objectives At the end of this section you will be able to:  Understand the key pains and challenges.
Copyright © 2007 OSIsoft, Inc. All rights reserved. Ekho - MES Applications that leverages AF 2.0 Yannick Galipeau Inexcon Technologies Patrick Ramsey.
Production Planning and Detailed Scheduling (PP/DS) in SCM EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
A tour of the integration between Macola ES / Progression and Preactor V11 Preactor.
1 Outsourced Manufacturing Within The Current Global Marketplace Mr. Anthony Della-Croce VP Solutions Architecture Core Services.
Orange County Convention Center Orlando, Florida | June 3-5, 2014 Planning Board Experiences – Scheduling and More Julie Lushbough and Veronica Morris.
Master Data for SCM (1) Master Data in Demand Planning & Fulfillment Processes EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
1 Manufacturing Operations Scheduling B2 [ ] B2 [ ] E5 [ E5 [ P9 [---] P9 [---] D1 [ D1 [
Project Portfolio Management Business Priorities Presentation.
PI Gateway to SAP R/3 Ron Kolz, Gretchen M. Schwenzer, Ph.D OSI Software, Inc.
QAD Manufacturing Solution Enhancements for 2012 March 12, 2012 QAD Midwest User Group Meeting.
SUPPLY CHAIN MANAGEMENT SYSTEMS Part I. 7-2 LEARNING OUTCOMES 1.List and describe the components of a typical supply chain 2.Define the relationship between.
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
INFORMATION SYSTEMS IN THE ENTERPRISE
SYSPRO ERP for all Manufacturing Types and Processes
Copyright © 2005 World Batch Forum1 How to use ISA95 part 3 for MES functional URS Jean Vieille
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
APO Technical Workshop for LG Chemical Based on APO 3.10.
AXUG Partner Showcase – Introducing Preactor
The Compelling Solution . .
MESA Africa Manufacturing Enterprise Solutions Association Africa
Planning and Scheduling Production Operations
Delivering value from MES: Optimizing Manufacturing Efficiency
Achieving Operational Excellence and Customer Intimacy:Enterprise Applications Chapter 9 (10E)
A Process View of the Supply Chain
SCM Master Data - 2 Master Data for Distribution & Production Processes EGN 5346 Logistics Engineering Fall, 2015.
Real Time Engineering Slab & Coil Yard Management and Plate Stock Report , Planning, Production, Reporting & Data Base Management Solution for Metal Industry.
Presentation transcript:

Advanced Scheduler for Wonderware MES Chris Mollison Scheduling Solutions

Introduction Project Solution Agenda Benefits Considerations Summary

Background to the Project This presentation shows how the Preactor scheduling functionality has been integrated with Wonderware Operations 3.4 It discusses the benefits of using finite scheduling functionality. It reviews the results obtained at Aquacolor where Wonderware Operations and Preactor are integrated

Background to the Project Receive Preparation Batching Make Unit Packaging Ship Manufacturing Order Management Enterprise Integration Finite Scheduling Dispatching Material Management/ Formula Manufacturing Performance Management Manufacturing Reporting/ Analysis/ Dashboard In Line Product Quality Compliance Equipment Condition Monitoring Production Capacity Management (OEE, TEEP) Deviation/ Yield Management/ Scrap Rework Material Management Material Receivables Pre-Weighing/ Dispensing Food and beverage solution map Inventory Material Management Material Quality Inspection Manufacturing Operations Execution WIP Status Management Production Practices Enforcement (multi Unit) Product Traceability Brand Integrity/ Quality Sample Plan Management Container Management (Tote bin management) Regulative Compliance (HACCP) Batch/ Process Execution Batch/ Unit Execution Final Inventory Process Automation Control Bar Code Printing Secondary Production Execution RFID Coding Production Order Execution Shipping Execution Discrete Automation Control

Project Goals To create a certified integration between Wonderware Operations 3.4 and Preactor.

Introduction Project Solution Agenda Benefits Considerations Summary

Wonderware Food and beverage solution map Receive Preparation Batching Make Unit Packaging Ship Manufacturing Order Management Enterprise Integration Finite Scheduling Dispatching Material Management/ Formula Manufacturing Performance Management Manufacturing Reporting/ Analysis/ Dashboard In Line Product Quality Compliance Equipment Condition Monitoring Production Capacity Management (OEE, TEEP) Deviation/ Yield Management/ Scrap Rework Material Management Material Receivables Pre-Weighing/ Dispensing Inventory Material Management Material Quality Inspection Manufacturing Operations Execution WIP Status Management Production Practices Enforcement (multi Unit) Product Traceability Brand Integrity/ Quality Sample Plan Management Container Management (Tote bin management) Regulative Compliance (HACCP) Batch/ Process Execution Batch/ Unit Execution Final Inventory Process Automation Control Bar Code Printing Secondary Production Execution RFID Coding Production Order Execution Shipping Execution Discrete Automation Control

Where does APS fit? ERP APS MES System Control Automation Jurgen Kletti, 2008

Fills the MESA function group for detailed planning: APS Role in MES 20-Apr-17 Fills the MESA function group for detailed planning: Sequence and time optimization of the orders finely tuned to the performance of the machines, including their finite capacity and relationship to other resources (c) 2002 Invensys Systems, Inc.

Why is scheduling different from planning? 20-Apr-17 Why is scheduling different from planning? Planning systems are bucketed (monthly, weekly, daily) and cannot preserve operation sequences within the time bucket True scheduling systems are bucketless, preserving sequencing, and capable of generating work-to or dispatch lists. Assignment of operation to resource is a key function to achieve operational efficiency and optimizing performance (c) 2002 Invensys Systems, Inc.

SAP APO APO is a global Supply Chain solution 20-Apr-17 APO is a global Supply Chain solution APO is made up of several modules : Collaborative Planning (CP) Supply Chain Cockpit (SCP) Demand Planning (DP) Supply Network Planning (SNP) Production Planning & Detailed Scheduling (PP/DS) Global Available-to-Promise Preactor does not compete with APO, but only with the “Production Planning & Detailed Scheduling” (PP/DS) module of APO (c) 2002 Invensys Systems, Inc.

Limitations PP/DS for MES 20-Apr-17 PP uses an MRP calculation with infinite capacity and large planning and scheduling ‘bucket’ sizes (typically a week) and mid/long term vision Hence a planning system with all the limitations DS does not link dependent WOs (pegging), it uses launch date data, No synchronization of materials between dependent WOs or WOs to WOs APO uses heuristics technology Very difficult to parameterize Solver cycle long and not repeatable Very difficult for users to understand Limited, rigid rule set (c) 2002 Invensys Systems, Inc.

Where does APO fit? APS MES ERP/PPS SNP DP SCP GATP CP 20-Apr-17 (c) 2002 Invensys Systems, Inc.

Why Preactor? 20-Apr-17 Founded in 1993 – 15 years of experience in developing and implementing scheduling solutions Microsoft Gold Partner International coverage across 5 continents Over 10 000 licenses sold (c) 2002 Invensys Systems, Inc.

Preactor’s Install Base 20-Apr-17 Why Preactor? Preactor’s Install Base Since its first release in 1993 more than 10,000 Preactor scheduling systems have been installed in the broadest range of verticals….. (c) 2002 Invensys Systems, Inc.

Data Flow Production Order item qty ERP SYSTEM date Operations management production process recipe management inspection tracking Wonderware Operations 3.4 Sequencing sequencing logic dates & times resources to use APS

Integration with Wonderware Operations Work Order Wonderware Ops (MES) Data Sent per Op Scheduled Start Time Target Scheduled Resource Data Sent per Op Initial Scheduled Resource Required Finish Time Priority Route constraints Actual Start Time Preactor APS

Integration structure Links with Operations 3.4 Demand passed from Operations 3.4 to Preactor APS Schedule is released from Preactor APS to Operations 3.4 Context sensitive windows in Preactor shows data from WIS Resource calendar exceptions sent from Operations 3.4 Shop floor data updates Preactor APS Static data synchronized from Entities Preactor Gantt charts available though WIS Wonderware's Operation Modules (Factelligence) Supply Chain Connector Clients

Integration Example

20-Apr-17 Flash Demo of Preactor (c) 2002 Invensys Systems, Inc.

Aquacolor Aquacolor is also heavily involved in the development of applied nanotechnology for textiles finishing and works with leading fashion brands including Levi Strauss, Burberry, Hugo Boss and Trussardi The ability to respond to this and consistently deliver high levels of customer service depends on a solid yet flexible manufacturing approach Different orders may require different levels of dyeing, washing and finishing yet challenges exist for some orders may require repeat operations – typically washing - with some processes – typically dying – involving correction and adjustments during the actual process Every order may be different

Aquacolor Aquacolor are a Wonderware user and they wanted improved management over shop floor operations. They selected Wonderware Operations (originally Factivity) to provide the required functionality. Factivity does not have inbuilt scheduling functionality so Aquacolor selected Preactor to provide this capability.

Introduction Project Solution Agenda Benefits Considerations Summary

Wonderware Operations - benefits Benefits achieved from Wonderware Operations implementations Improved control of operations Improved recipe management Improved traceability

Preactor - benefits Benefits achieved from Preactor implementations VISIBILITY Decision support Improved customer service Improved delivery date promising Improved delivery performance Improved productivity Better machine utilization Reduced inventories

Aquacolor Benefits Operational improvement at recipe management, operations information and traceability levels, with a direct impact on costs. 50% reduction in the time spent to build a new work order Saves 70% time required to give a delivery date Scheduling overhead reduced 35%

Benefits / Goals Achieved Were the initial goals achieved? Yes – an integration has been developed Is the customer happy with the project? Wonderware and Preactor are happy with the integration. The interface has been certified. What benefits (business, technical & other) were gained A certified solution is now available to Wonderware Operations users to role out scheduling functionality with minimal effort.

Introduction Project Solution Agenda Benefits Considerations Summary

Lessons Learned This is possible to integrate Wonderware Operations 3.4 and the Preactor scheduling functionality. Wonderware has certified the interface. Linking Wonderware Operations and Preactor delivers measurable benefits.

Introduction Project Solution Agenda Benefits Considerations Summary

Conclusions The certified interface shows that it is possible to easily transfer data between Wonderware Operations and Preactor. Wonderware Operations users can feel secure in knowing that world class scheduling functionality is available to them when required. Wonderware Operations users can benefit from implementing the scheduling functionality now available to them.

Going to Market With Wonderware Local Wonderware distributors will sell Preactor with the support of Preactor Network Partner responsible for region Wonderware distributors will place their orders with Network Partner Preactor servcies, training, and annual support provided by Network Partner

….any questions?