Presented by “Weather Warriors” Susan Gardner Ann Elmer CIS 1020–045 Spring 2011
For President Bioteau Salt Lake Community College
Proposal Provide covered walkways between buildings Shelter students and faculty from inclement weather
Benefits Decrease travel time between classes Help prevent illness Reduce injuries Alleviate exposure Minimize tardies and absences Cost savings from reduced ground maintenance
Total Cost Benefits ExpenseBefore walkwayAfter walkwayTotal savings per yearTotal savings after 10 years Annual snow removal$5,000$1,000$4,000$40,000 Annual litigation$12,000$2,000$10,000$100,000 Total$17,000$3,000$14,000$140,000
Total Cost Benefits
Estimated Start-up Costs Estimated Start-Up Cost for 100' Length Material typeCostUnit length in feetQuantity Installation at $75/hrInstallation costTotal cost Wood$ $4,600 Plastic$ $5,183 Steel$ $6,850 Solar$ $8,750
Estimated Start-up Costs
Conclusion Don’t walk away from the benefits and safety we at Weatherproof Walkways can provide for the students and faculty at Salt Lake Community College
Thank you We would like to thank you, President Bioteau for taking time out of your busy schedule to review our proposal.