Yongho Kim Aug 2, 2011. : My Job TLM_ReceiverRS decoderGSEOS Nothing.. Interface - Serial line - TCP/IP connection with MPS Functions - CCSDS frame,

Slides:



Advertisements
Similar presentations
Page 1 Aalborg University Communication system for the AAUSAT-II Communication System for the AAUSAT-II Kresten K. Sørensen Department.
Advertisements

1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) GSE Timothy Quinn.
® The Bluetooth Architecture APIs, L2CAP, Link Management, Baseband, and the Radio.
Instrument TrainingIDPU - 1 UCB, Dec 6, 2006 THEMIS INSTRUMENT TRAINING IDPU.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Telecommand and Telemetry Data Dictionary Services Sergio.
March 2004 At A Glance ITOS is a highly configurable low-cost control and monitoring system. Benefits Extreme low cost Database driven - ITOS software.
- Software block schemes & diagrams - Communications protocols & data format - Conclusions EUSO-BALLOON DESIGN REVIEW, , CNES TOULOUSE F. S.
MAVEN CDR May 23-25, 2011 Particles and Fields Package Pre-Environmental Review May , 2012 Flight Software Peter R. Harvey Mars Atmosphere and Volatile.
Shell and Flashing Images Commands and upgrades. RS-232 Driver chip – ST3232C Driver chip is ST3232C Provides electrical interface between UART port and.
PPP (Point to Point Protocol)
SCADA and Telemetry Presented By:.
Computerized Train Control System by: Shawn Lord Christian Thompson.
G O D D A R D S P A C E F L I G H T C E N T E R 1 The Trade Between CCSDS and HDLC Framing on Global Precipitation Measurement David Everett and Jonathan.
Oppenheimer Technologies Rick King Jonathan Creekmore.
NETWORK CENTRIC COMPUTING (With included EMBEDDED SYSTEMS)
Aerospace Testing 2006 A Centralized Approach To Ground Support Software To Reduce Technical Risk and Overall Mission Costs Thomas Hauck GSE Software,
DESIGN & IMPLEMENTATION OF SMALL SCALE WIRELESS SENSOR NETWORK
ISUAL Instrument Software S. Geller. CDR July, 2001NCKU UCB Tohoku ISUAL Instrument Software S. Geller 2 Topics Presented Software Functions SOH Telemetry.
December 2009 Target Group Control System of production furnace for SPES project Results and progress status december 2009.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Jerry Kim, SSL Mechanical.
Project Description. This project aims to monitor an area through a camera, transmits the video wireless.
KHU Ground Station Nayoung Yoon KHU, 2010/10/041TRIO-CINEMA.
Lecture 20: Communications Lecturers: Professor John Devlin Mr Robert Ross.
SECCHI Consortium Meeting, July 2001 SECCHI Ground Data Systems and Data Processing Nathan Rich NRL/Interferometrics
CHIPSat Cosmic Hot Interstellar Plasma Spectrometer Spacecraft Julius-Maximilians-Universität Würzburg S: Telematik in der Raumfahrt Prof. Dr. Schilling.
CCSDS Security WG meeting October 2008, hosted by DLR at DIN premises (Berlin) 1 Data Link Security BOF An ESA contribution on Lessons Learned and Issues/Questions.
TRIO-CINEMA 1 UCB, 2/08/2010 Instrument Interface Board Dorothy Gordon CINEMA - EE Team Space Sciences Laboratory University of California, Berkeley.
Done By: Amnon Balanov & Yosef Solomon Supervisor: Boaz Mizrachi Project ID: d02310.
CINEMA (CubeSat for Ions, Neutrals, Electrons & MAgnetic fields) Jerry Kim * David Glaser † Thomas Immel ‡ * Systems Engineer, †
TRIO-CINEMA 1 UCB, 2/08/2010 Cinema Stein Interface FPGA (CSI) [Part II] Karthik Lakshmanan CINEMA - EE Team Space Sciences Laboratory University of California,
FPGA firmware of DC5 FEE. Outline List of issue Data loss issue Command error issue (DCM to FEM) Command lost issue (PC with USB connection to GANDALF)
1 Transmission of Digital Data : Interface and Modems.
REDNet - Status overview Rok Stefanic Ziga Kroflic
NCKU UCB Tohoku GSE Software, T.T. Wang 1 Ground Support Equipment(GSE) Software Tzu-Te Wang.
TRIO-CINEMA 1 UCB, 8/10/2010 CINEMA Project Update Thomas Immel UCB/SSL Space Sciences Laboratory University of California, Berkeley.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Suites (Backup) Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope.
5 June 2002DOM Main Board Engineering Requirements Review 1 DOM Main Board Software Engineering Requirements Review June 5, 2002 LBNL Chuck McParland.
Tracing the JWST Proposal from User Interface to Commanding of an Instrument Margaret Meixner & WIT Balzano, Robinson & CMD.
TRIO-CINEMA FSW- 1 SSL, 8/10/2010 Flight Software Seyoung Yoon and Sameet Ramakrishnan Space Sciences Laboratory Kyung Hee University University of California,
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
TRIO-CINEMA 1 KHU, 10/08/2010 Ground Support Software Yong-ho Kim 22 Feb 2011 School of Space Research Kyung Hee University.
TRIO-CINEMA 1 UCB, 2/08/2010 Integration and Test Program Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
13-1 MAVEN PFP ICDR, May 23 – 25, 2011 Particles and Fields Package Critical Design Review May , 2011 GSE Timothy Quinn.
Preliminary Design Review By: Alireza Veiseh Anh-Thu Thai Luai Abou-Emara Peter Tsang.
4000 Imaje 4020 – Software Imaje 4020 – Content ■ Content of Chapter Software: 1. Flash Up 2. Netcenter 3. FTP 4. Active X 5. XCL commands 6. Exercise.
CTG Command, Telemetry, and GSE (CTG) Software Design Will Rachelson
11/3/2000cmd_soh1 SOH and CMD Current Status. 11/3/2000cmd_soh2 ISUAL Flight Software 0.0 SOH Telemetry CMD Input Debug I/O.
Timothy Edward Quinn FIELDS iPDR – GSE Solar Probe Plus FIELDS Instrument PDR GSE Timothy Edward Quinn UCB 1.
Rohde & Schwarz Topex TOPEX IP Radio Gateway July 2011.
E2.2 Implementation of a Demodulator Sponsor: Steve Hicks, FlexRadio Systems Faculty Advisor: Dr. Harold Stern & Dr. Semih Aslan.
Software and TDAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
TRIO-CINEMA C&DH- 1 KHU, 10/19/2009 Command & Data Handling System (C&DH) Peter Harvey David Curtis David McGrogan Space Sciences Laboratory University.
Final Design Review By: Alireza Veiseh Anh-Thu Thai Luai Abou-Emara Peter Tsang.
S-band Telemetry Description DMC 211 October 2015.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 647 Ground Support Equipment Will Rachelson University of.
TRIO-CINEMA 1 UCB, 2/08/2010 FSW & Operations Winter Summary Seyoung Yoon KHU EE Team.
3DoT Technical Documentation
“COMMAND PARSE” - A STATUS REPORT - Matt Smith Pallavi Khandelwal
Command & Data Handling
Seyoung Yoon and Sameet Ramakrishnan
Ground Support Software
CINEMA System Engineering
ESA GSE.
Solid State Recorder Liu Dahai CSSAR.
DSP Operation Management Center (DOMC)
CubeSat vs. Science Instrument Complexity
Manual Robotics ..
Chapter 6 Transmission of Digital Data Interfaces and Modems
<Your Team # > Your Team Name Here
<Your Team # > Your Team Name Here
Presentation transcript:

Yongho Kim Aug 2, 2011

: My Job

TLM_ReceiverRS decoderGSEOS Nothing.. Interface - Serial line - TCP/IP connection with MPS Functions - CCSDS frame, packet parser - Decode telemetry based on APID - Transmit binary-type Immediate command to FSW Error Handling - CCSDS parser exception - APID decoder exception - CMD generation exception Integration test - Test with FSW for Mode change, start downlink, stop downlink command

 TLM_receiver ◦ Using C# (programming language) ◦ Send telemetry transmitted from satellite to RS decoder ◦ Store telemetry as a file which can be re-loaded if Mission Planning System wants Interface -TCP/IP(done) -Error handling(done) Function -Receive telemetry from S-band RF device using RS422 I/F (done) -Error handling(almost done) -Remote operation(on going) -Store telemetry as a file(done) Error Handling -TCP/IP exception(done) -Remote operation exception(on going) Integration test & Inner functional test -Inner functional test (done) -Integration test with RS decoder (done) - Integration test with s-band RF chain(not performed)

 CCSDS(255, 223) RS(Reed-Solomon) decoder ◦ Use RS coder (verified by satellite company in Korea) based on C# ◦ Decode telemetry and can correct up to 80 bytes for each CCSDS frame(1,275 bytes) Interface -TCP/IP(done) -Error handling(on going) Function - Decode telemetry (done) - Error handling (done) - Remote operation(on going) Error Handling -TCP/IP exception(on going) -Remote operation exception(on going) Integration test & Inner functional test -Inner functional test (done) -Integration test with GSEOS (done) - Integration test with TLM_receiver (done)

 GSEOS(Update EPS, Battery statement in GSEOS) ◦ Parsing EPS, Battery information with calibration equiation based on EPS document ◦ Integration test with FSW using EPS, Battery device is done

 GSEOS(Implementation of delay CMD based on CTM) ◦ Generate delay CMD with timestamp(5 bytes) ◦ Integration test with newest version of FSW is done ◦ Transmitted delay CMD was executed depending on the timestamp ◦ We tested only start downlink, stop downlink delay CMD. Implementation of other delay CMD defined in CTM is matter of time Time Transmit delay CMD With timestamp CMD will be executed The timestamp

 GSEOS(Showing payload data) ◦ STEIN  According to stein data structure, have to draw 32 stripcharts for 32 ch detector  For now, we considerd only 2 ch ◦ MAGIC  Just set up a window for MAGIC science data  When MAGIC module in FPGA is done, we can test with FSW using IIB, MAGIC time Event count Second channel detectorFourth channel detector

 GSEOS(RF test with Jonathan) ◦ GSEOS transmits telecommand through radio equipments ◦ Test was successful and transmitted data was shown in Helium radio configuration program time Attenuators GSEOS Digital Transceiver With TNC Helium Radio Helium radio Configuration program dsPic RF signal Digital (CDI packet) Digital

 Ground Station Manager ◦ Manage whole ground system ◦ Send command(not telecommand) to perform what we want to do ◦ Monitor the status of each sub-system(i.e. TLM_receiver, RS decoder, GSEOS1 and 2) ◦ I/F is done ◦ Connection between subsystem and GS Manager is using private TCP line (not data line)

 Write ground support software CPD document  Write GSEOS CPD document  Write ground station operation document

TLM_ReceiverRS decoderGSEOS Done Interface -TCP/IP connection -Connect with GS Manager Functions -Receive TLM -Save TLM -Transmit TLM Error handling -Connection Exception Integration test -Test with RS decoder Interface -TCP/IP connection Functions -Receive TLM -Decode RS encoded TLM Error handling -none Integration test -Test with GSEOS, TLM_receiver -Test with FPGA’s RS encoder using text file Interface - Serial line - TCP/IP connection with MPS Functions - CCSDS frame, packet parser - Decode telemetry based on APID - Transmit binary-type Immediate command to FSW Error Handling - CCSDS parser exception - APID decoder exception - CMD generation exception Integration test - Test with FSW for Mode change, start downlink, stop downlink command Remains Interface - none Functions -Execute remote CMD from GS Manager -Remote command handling Error handling - Remote control exception Integration test - Test with s-band RF devices Interface - Connect with GS Manager Functions -Execute remote CMD from GS Manager -Remote command handling Error handling -Remote control exception -TCP/IP exception Integration test - Decoding speed test using GSE computer with full load Interface -none Functions -Decode CCSDS frame depending on TM module -Remote command handling Error handling -GS Manager Exception Integration test -Test with FSW using MAG module -Test with FSW using STEIN module -Test CMD generation with MPS