Ms. Gripshover Landscaping Unit 12. Identify the difference between an estimate and a bid. Describe landscape specifications. Prepare a cost estimate.

Slides:



Advertisements
Similar presentations
Software Solutions for Landscape Professionals Change Orders made easy with DS|Manage360 Planning for Profitability 2012 Webinar Series June 28, 2012 Presenter:Marcus.
Advertisements

Estimating & Tendering. Estimating work involves dealing with Measurements and quantities Pricing and rates Subcontract packages Tender preparation.
Presenter: Victor C. Tyler, P.E. Estimating and Bidding Strategies that Drive Best Practices.
Adding New Enterprises: The Financial Aspects Dr. Alex White Virginia Tech
Chapter 12 Estimate Summaries and Bids. Bid Summaries The format of the summary depends for what the estimate is to be used. –Ordering materials –Calculating.
Constructionsite Economic use of Plant Ron Gatepain.
Ms. Gripshover Landscaping Unit 18 INSTALLING PATIOS, WALKS, AND DECKS.
FINAL ACCOUNTS.
How to do an estimate. Steps 1) Estimate from bottom up –How you construct the project –Lets you get an understanding of project path –Lets you find errors.
Estimating CTC-415. Estimate Types Concept Detailed Definitive.
Setting the Right Price. “Underpricing is one of the most common mistakes home-based businesses make.” SLIDE 1 Setting the Right Price.
Chapter 9 Pricing Construction Equipment. Objectives Upon completion of this chapter, you will be able to: –Identify the three main equipment categories.
Copyright 2012 John Wiley & Sons, Inc. Chapter 7 Budgeting: Estimating Costs and Risks.
Decimals
Terms to know Labor=human activity that produces a good or service.
EM15 – Contractors COST MANAGEMENT
Setting the Right Price. Lesson Goals: Learn how to: –Calculate total costs –Calculate a profit margin –Use break-even analysis Identify the difference.
Pricing Landscape Maintenance Work. Next Generation Science/Common Core Standards Addressed!  CCSS.Math. Content.7.R P.A.3 Use proportional relationships.
Pricing A Menu. You have chosen your menu items, written enticing descriptions and created an amazing design….now what? PRICING THE MENU!!
PREPARING THE LANDSCAPE SITE Ms. Gripshover Landscaping Unit 14.
Chapter 3 Job Order Costing. Review: Control and Subsidiary Accounts Most financial statement line items are totals of multiple lower level accounts Subsidiary.
Contract Pricing Methods Ch 2. Lump Sum –Contractor bids 1 price for entire project –Estimate needs to be detailed –Design needs to be finished before.
Menu Pricing reflect the overall cost of running the operation These prices the costs needed to purchase, prepare and service it as well as labor rent.
Cost Concepts and Cost Allocation
Chapter 8 Pricing Generally. Objectives Upon completion of this chapter, you will be able to: –Describe the general process of pricing a construction.
Landscape Business Concepts
Copyright 2012 John Wiley & Sons, Inc. Chapter 7 Budgeting: Estimating Costs and Risks.
Measurement and Payment. Construction Progress Payments –Contractor gives a bill for progress to RPR Outlines what bill is for Give details as needed.
© 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
© South-Western Educational Publishing GOALS LESSON 3.4 PRICING MERCHANDISE  Describe the methods buyers use to calculate the cost of merchandise  Calculate.
Horticulture CD Unit C 4-4: Nursery, Landscaping, and Gardening.
Lesson 5 Marketing the Landscape Business. Next Generation Science/Common Core Standards Addressed! CCSS. Math. Content.7.RP.A.3 Use proportional relationships.
Horticulture CD-Rom Illinois CORE Curriculum. Unit C Nursery, Landscaping, and Gardening.
Chapter 7 Budgeting: Estimating Costs and Risks © 2012 John Wiley & Sons Inc.
CORNERSTONES of Managerial Accounting, 5e © 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part,
Estimates and Quotes Apply procedures to develop plans, estimates and quotes Objective 4.03 Remember key terms, abilities needed, and items included in.
Chapter 3 Economics in the United States 3.3. Profit Profit is the money a business or person makes after expenses have been paid. Profits are very important.
Lesson 8 Pricing the Landscape Plan. Next Generation Science/Common Cores Standards Addressed! n CCSS.Math.Content.7.R P.A.3 Use proportional relationships.
THE COST OF MANUFACTURING How much does manufacturing cost?
Project Costing & Cost Risk. Business is a game And we use money to keep score.
Chapter 13 Estimates for Remodeling Work
Management & Development of Complex Projects Course Code - 706
POB 4.01 PARTS 1 & Understand financial planning.
Measurement and Payment
Business Utilities What is “utility”? Economic term that means…
MARKETING THE LANDSCAPE BUSINESS MS. GRIPSHOVER LANDSCAPING UNIT 4.
Goal 4.03: Calculate prices of menus for a culinary business.
Markup vs. Margin Margin is the amount of gross profit, net profit, or overhead, compared to volume of work. (Expressed as a percentages) Markup is the.
HORTICULTURE II - LANDSCAPE Unit B Landscape Design.
 To provide a realistic accurate idea of the cost  Provide information about building or not.
Copyright 2015 John Wiley & Sons, Inc. Chapter 7 Budgeting: Estimating Costs and Risks.
Lesson 8 Pricing the Landscape Plan Reminder: student learning activities are at the end of this power point.
Copyright © 2015 McGraw-Hill Education. All rights reserved
Marketing the Landscape Business
Chapter 17 Job Order Costing
Budgeting and Cost Estimation
Estimating Project Costs
Chapter 8 Accounting for overhead
Budgeting: Estimating Costs and Risks
STEPS IN THE DEVELOPMENT OF A DETAILED ESTIMATE
PS&E – Plans, specifications and estimate
Sections in a Venture Plan
Copyright 2012 John Wiley & Sons, Inc. Chapter 7 Budgeting: Estimating Costs and Risks.
Business Finance Break Out Session
Cornerstones of Managerial Accounting, 6e
Budgeting: Estimating Costs and Risks
CIVL 493 CONSTRUCTION MANAGEMENT
PowerPoint presentation
Sections in a Venture Plan
Presentation transcript:

Ms. Gripshover Landscaping Unit 12

Identify the difference between an estimate and a bid. Describe landscape specifications. Prepare a cost estimate of the landscape plan. Our Objectives

When meeting with a customer, the designer msut be prepared to discuss prices Estimate- the initial price presented to the customer Rough guess of cost including labor and materials Price can change throughout the process Sometimes “bids” are taken for a job Landscaper gives a “bid”, which is an exact price and CANNOT be changed Other landscapers can offer bids and usually the customer takes the lowest bid What is the difference between an estimate and a bid?

Specifications are a list of all the details needed to install the landscape plan accurately Size and number of plants Pacing material need Decks or patios Amending the soil Mulch Etc. The more detailed the specifications, the more accurate the landscape What are landscape specifications?

Cost estimate- written statement of the costs of installing a landscape plan Includes descriptions, numbers, cost of plant material, etc. Includes overhead costs, labor, and profit Overhead costs- cost of operating a business Ex: maintenance of equipment, utilities, etc. Usually calculated by calculating 20% of the material and labor cost How do I prepare a cost estimate for a landscape plan?

Determine the overhead cost The total of materials and labor are $ What price should be added to that to cover overhead? The total of materials and labor are $ What price should be added to that to cover overhead? The total of materials and labor are $ What price should be added to that to cover overhead? The total of materials and labor are $ What price should be added to that to cover overhead? The total of materials and labor are $ What price should be added to that to cover overhead? Your Task

Contingency costs- added to all plans as insurance against unforeseen problems like weather Usually calculate 10% of the material and labor costs Landscaper can not only charge for materials, labor, and cost of operation however They must make a profit The money left after all the costs of operation are complete Calculating by taking the total of everything and multiplying by 20% How do I prepare a cost estimate for a landscape plan? (cont.)

Determine the contingency cost. The total of materials and labor are $ What price should be added to that to contingency? The total of materials and labor are $ What price should be added to that to contingency? The total of materials and labor are $ What price should be added to that to contingency? The total of materials and labor are $ What price should be added to that to contingency? The total of materials and labor are $ What price should be added to that to contingency? Your Task

Determine the profit based on the %. Total cost of job is and you want to make a 20% profit. How much will you add to the total cost? Total cost of the job is and you want to make a 35% profit. After adding the 35% profit to the total cost of the job, what is the final TOTAL price? Total cost of the job is and you want to make a 20%. How much will you add to the total cost. Total cost of the job is and you want to make a 15% profit. After adding the 15% profit to the total cost of the job, what is the final TOTAL price? Total cost of the job is and you want to make a 30% profit. After adding the 30% profit to the total cost of the job, what is the final TOTAL price?