Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.

Slides:



Advertisements
Similar presentations
4 Wiring Systems. 4 Wiring Systems Objectives Know where to find codes and authorities for an installation. Recognize the marks of the most popular.
Advertisements

AT&T strives to provide a smooth and successful installation experience for our Customers. We will do all that we can to install your service on time and.
Cabling system components
Network Design Issues Design and Documentation Prepared by: Aline L. Mendoza.
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
UNIT 31 HOME ELECTRICAL SYSTEM
Chapter 3: Planning a Network Upgrade
New Mexico FFA Agricultural Mechanics Career Development Event Electric Power.
INTD 51 human environments building systems. heating/ventilation/air-conditioning (HVAC) maintain a comfortable indoor climate control temperature and.
Telecom Cabling Grounding and bonding.
EE4503 Electrical Systems Design
FIRE PUMP ELECTRICAL CONFIGURATIONS UNDER 600 VOLTS.
4 Wiring Systems. 4 Wiring Systems Objectives Know where to find codes and authorities for an installation. Recognize the marks of the most popular.
DAY 4 CHAPTER 3 CONDUCTOR SIZES,TYPES, ETC.. Continuous Load. A load where the maximum current is expected to continue for 3 hours or more. Continuous.
Guide to Network Cabling Fundamentals
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
EET Survey of Electronics
Power Supply, Lighting Equipment, and Emergency Scene Safety Firefighter I.
Designing and Implementing Cabling Infrastructure Dr. Saif al Zahir King Fahd University of Petroleum & Minerals Computer Engineering Department Dr. Saif.
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE PV APPLICATIONS CODES AND STANDARDS EMERGENCY RESPONSE.
1 Fiber Optics FIBER OPTIC PATCH PANELS. 2 Fiber Optics Just like our copper cable plant the fiber cable plant incorporates many of the same hardware.
Georgia Tech Safety and Health Consultation Program ELECTRICAL SAFETY TOOL BOX SESSION.
Design Considerations for Telecommunications Pathways and Spaces
The Home Inspection Book: A Guide for Professionals By Marcia Darvin Spada Copyright, Thomson/South-Western, 2003, Revised, 2006.
By Carlin Bright. Electricity The flow of electrons in a conductor.
1 Project # 2 Steve Klesper Tom Ondick Garry Meadows Aaron Hurt Tim Wade.
HVACR116 – Trade Skills Mechanical Drawings.
INTRUSION ALARM TECHNOLOGY
ELECTRICAL HAZARDS Electricity is an essential of modern life Some work directly with electricity (Engineers, circuit assemblers) Some work indirectly.
MINIMUM ACCEPTABLE LEVELS OF SAFETY & RELIABILITY
Electric Power ID. Next Generation Science/Common Core Standards Addressed! CCSS.ELA Literacy.RST.9 ‐ 10.4 Determine the meaning of symbols, key terms,
©Ted “Smitty” Smith This speed drill focuses on subjects that will be required for the journeyman and masters examination arranged by chapter of.
Home Electrical Systems. Behavior Objectives  Define the basics of Electrical Systems  Explain the basic principles of Electricity.  Describe the different.
Electrical Safety and Electrical Safe Work Practices EHS Course #525 Reference EHS Electrical Safety Procedure
2008 Code Drills (C) Copyright 2008 Ted "Smitty" Smith 1 Smitty’s Speed Drills.
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
TELECOMMUNICATIONS SPACES. WORK AREA WA Work Area Work Area (WA) Telecommunications Outlet (TO) Horizontal subsystem cables Equipment and patch cords.
TELECOMMUNICATIONS SPACES
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
Copyright 2008 Ted "Smitty" Smith Two Minute Drill Number 21- Residential Improving your skill in code Look Up Increasing Speed Drill.
AT&T Managed Internet Service (MIS) with Ethernet Customer Site Preparation Document This document addresses Customer sites that do not have AT&T fiber.
Sprinkler Loads on Trusses
Sprinkler Loads on Trusses Educational Presentation.
Fundamental Concepts for Design of Special Hazard and Fire Alarm Systems Chapter 1.
Grounding the Electrical System Reference: AAVIM “Electrical Wiring” Created May 2007.
ELECTRICAL WIRING WIRING BASICS Written by Bobby Joslin
ELECTRICAL INSTRUMENTS ( service and utilization )
Primary and Backup Connectivity. Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or.
Chapter 30 Electrical Wiring Copyright Goodheart-Willcox Co., Inc. May not be posted to a publicly accessible website. Define basic electrical terms.
Construction. Asset management Field force management Fleet management Mobile job site Automated maintenance Learn how to turn job site chaos into choreography.
Energy & Utilities. Smart metering Demand response Meter data management Distribution monitoring Fleet management Find out what Verizon can do for utilities.
WIRES, CONDUITS AND RACEWAYS Class Instructor : VINCENT J. DAYAG JR,MSArch.UAP.PIEP. Architect / Environmental Planner.
Radio Frequency (RF) Safety When Working Near Cellular Antennas
Smitty’s Two Minute Drill Grounding
Agricultural Science Career Development Event Electric Power
License Examination Practice Drill
Materials conductor and equipment
Smitty’s Two Minute Drills
Personal Protective Equipment
AFCI Protection: AFCI Receptacles and the NEC
Engineering Project Cable Management.
One Talk from Verizon One TalkSM offers a flexible, scalable phone system that combines employees’ desk phones and mobile phones using the same number.
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE
Conductor A material, such as copper, that permits the flow of electricity; usually refers to the a wire.
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE
Click anywhere to get started…
Smitty’s Two Minute Drill Services, Feeders, and Branch Circuits 1
North Carolina Department of Insurance Office of State Fire Marshal
Presentation transcript:

Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is not permitted to any unauthorized persons or third parties except by written agreement.1 Ethernet Installation Premises Ready Considerations To help assure customer premises readiness, it is Verizon’s standard practice that the customer perform a site survey with Verizon prior to installation of Verizon cable and equipment. Below is a general (but not exhaustive) list of items to be considered in performing the survey and preparing the premises.  Environmental Factors  T he customer must provide and environment suitable for Verizon’s cable and equipment at no cost to Verizon.  Temperature and humidity:  Dust free environment.  Adequate lighting.  Space for a cabinet, rack, or wall mount (see section on Backboards below) based on the service(s) ordered. Specific requirements will be determined at the site survey.  Cable Path and Conduit  The customer must provide a cable path at no cost to Verizon. Verizon will utilize common building telecom riser shafts where available. If core drilling or other premises preparation work is required, the customer must have this work performed at no cost to Verizon by a person other than Verizon.  Verizon usually will install rigid plastic tubing in which Verizon will install Verizon’s fiber optic cable. Verizon usually does not require intra-building metallic conduit for installation of its fiber optic cable.  If the customer or the building owner/manager requires metallic conduit, the conduit must be provided by the customer at no cost to Verizon. If metallic conduit is to be used, the required conduit specifications are 2” electrical conduit with pull rope or tape installed. Conduit routes must be designed with gradual bends (bend radius should be a minimum of 15 times the diameter of the cable to be placed) and a maximum of two 90° bends or 180° of total bends between pull boxes. Verizon must be provided with engineering drawings or as-built documentation if the route is extensive and/or complex.  Verizon will co-occupy a conduit provided by the customer or building owner/manager that contains the telecommunications cable(s) of other person(s) only if the customer provides a spare, roped, sub-duct for Verizon’s cable.  Verizon will place riser-rated cable that meets applicable fire and electrical code requirements. When a customer-provided cable path includes air plenum space, Verizon will install plenum-rated cable and additional charges to the customer and an extended installation interval will apply. (As an alternative, the customer may provide, at no cost to Verizon, metallic conduit through the air plenum space for Verizon’s use, which will avoid the need for installation of plenum-rated cable.)

Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is not permitted to any unauthorized persons or third parties except by written agreement.2 Ethernet Installation Premises Ready Considerations  Power  The customer must provide at no cost to Verizon commercial AC power for Verizon’s equipment. The amperage, number and type of receptacles will be determined at the site survey. Dedicated circuits backed up by UPS/generator systems are strongly recommended.  Verizon, at its discretion, may elect to accept alternative electric power arrangements such as -48V DC. Options can be discussed at the site survey.  For Switched Ethernet Service (SES/ “TLS”), Network Interface Devices (NID’s) placed at the customer’s premises must be on surge protected electric power circuits. The customer must provide these electric power circuits at no cost to Verizon. The cost of repairing any power surge related damage suffered by Verizon equipment will be charged to the customer. For any order requiring DC electric powered NID’s, the customer is responsible for providing all necessary DC electric power at no cost to Verizon.  Adequate grounding capability must be available.  A 120V AC, 20A, convenience outlet must be available for Verizon’s use.  Ground  The customer at no cost to Verizon must provide a ¾” metallic conduit from the Verizon equipment to a Verizon approved building ground. Verizon will run the appropriate gauge wire to the Verizon approved ground connection. Grounding options in order of preference are: 1.Building Service Ground. 2.Main Electric Box. 3.Building Steel. 4.Metallic Water Pipe. Must be in direct contact with the earth for 10’ or more and electrically continuous to the point where the protector ground wire is installed. There must be a bond placed around any meters.  Backboard  If a backboard is needed for the installation of Verizon’s equipment, the customer must provide the backboard at no cost to Verizon. The backboard must be 4 feet x 8 feet x ¾ inches. Variations can be discussed at the site survey.  Service Demarcation  The standard interface for the demarcation with Verizon’s equipment will be a CAT 5 connector or optical connector in the proposed cabinet, bay, or wall mount space based on the type of service ordered and the customer’s requirements. The type of interface to be used will be determined at the site survey.  Premises Access and Use  The customer at no cost to Verizon must provide Verizon access to all portions of the premises for which Verizon needs access in order to install Verizon’s cable and equipment. It is the customer’s responsibility to obtain building owner/manager permission at no cost to Verizon for installation of Verizon’s conduit, cable and other equipment.

Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is not permitted to any unauthorized persons or third parties except by written agreement.3  Occupancy Charges  It is the customer’s responsibility to provide, at no cost to Verizon, space, electric power and cable paths for Verizon’s use. Verizon will not pay charges for space, power, or cable paths (regardless of whether the charges are one-time or recurring).  Other Requirements  The foregoing list of requirements for premises readiness is not intended to be a complete list of premises readiness requirements. Other requirements may apply.  Applicable Verizon tariffs and contracts apply. In the event of a conflict between this document and a Verizon tariff or contract, the Verizon tariff or contract will control. Ethernet Installation Premises Ready Considerations