ITS Procurement Workshop Module 3: Selecting a Contracting Approach.

Slides:



Advertisements
Similar presentations
DESIGN BUILD NATIONAL PERSPECTIVE by Dwight Horne FHWA.
Advertisements

1.1Definition of Construction:. Is the process by which material, equipment, machinery are assembled into a permanent facility. Is the process by which.
Effective Contract Management Planning
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
CONTRACT A binding agreement between two or more parties for performing, or refraining from performing, some specified act(s) in exchange for lawful consideration.
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
Course: e-Governance Project Lifecycle Day 1
Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.
1 Basics of Government Contracting. Federal Procurement Background The U.S. Government is the world’s largest purchaser of goods and services 2.
Alternative Project Delivery
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Project Procurement Management
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
National Contract Management Association – Norfolk Chapter Contracting Ground Rules.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
PROJECT DELIVERY SYSTEMS
Rethinking Construction Review of traditional construction models and a comparison of product development processes with other industries School of Architecture.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
PROCEDURES FOR SELECTING THE CONTRACTOR
Energy Performance Contracting Approach David Birr President Synchronous Energy Solutions.
Financial Assistance Workshop Contract versus Grant.
1 Department of Education Race to the Top Assessment Program Procurement Strategy Discussion Dr. Allan V. Burman President Jefferson Solutions
1 Where Do I Find it in the Contract? Understanding Government Contracts for the Property Manager: Part 1 of 2 C-200-INT NPMA.
Contract Type Selection Don Shannon
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
Effective Methods for Software and Systems Integration
Honoraria for Design Build Projects Methodology Assessment Matrix.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
PM/CAM Training H. Jeff Moore May 11, AGENDA Overview CM at Risk Design (Completion) / Build Lunch Break / Discussion – 11:30 AM – 12:30 PM CM Agency.
S/W Project Management Software Process Models. Objectives To understand  Software process and process models, including the main characteristics of.
New State Term Contract Effective April 1, 2004 Information Technology Consulting Services.
Module 10 Session 10.4 Visual 1 Module 10 Organizing Procurement Session 10.4 Procurement of Services: Use of Consultants and Developing Terms of Reference.
1.6 Contracting Methods Don Shannon. Sealed Bidding Discussed in FAR Part 14 Solicitation is an “Invitation for Bid” (IFB) IFB is publicly advertized.
COMP 323 Research Administration for Scientists Contracts, Grants & Cooperative Agreements: How They Are Different and Why It Matters! Wednesday, February.
SERVICES ACQUISITION REFORM ACT OF 2003 A STATUS REPORT Alan Chvotkin Senior Vice President and Counsel Professional Services Council DEFENSE ACQUISITION.
Departmental Administrators Training Course (DA-202)
©Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 2Slide 1 Chapter 2 Computer-Based System Engineering As modified by Randy Smith.
Construction Contracts and Project Delivery Methods
ITS Procurement Workshop Module 2: ITS Procurement Characteristics and Challenges.
Best Value Public Works Procurement September 7, 2007.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Protecting Data Rights Under DoD Contracts October 14, 2009 NCMA Workshop Cape Canaveral Chapter Keith R. Szeliga Sheppard Mullin Richter & Hampton.
Chapter 11: Project Procurement Management
CONTRACT PRICING ALTERNATIVES Presented by: Fahad H. Al-Anazi CEM 520 February 27,1999.
MGT 575 Summer 2008 Purchasing. MGT 575 Summer 2008 Steps in the Purchasing Process Accurate description of desired commodity or service Selection of.
Project Delivery Methods Part I. What is A Project Delivery Method? The owner’s selection of the organizational structure of the project. Three popular.
Project Procurement Management
Project Manager
Lecture 2 System Development Lifecycles. Building a house Definition phase Analysis phase Design phase Programming phase System Test phase Acceptance.
Coordination of Right of Way on Design-Build Contracts By- Richard Bennett State Right of Way Director Virginia DOT.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
+ Departmental Research Administrator Training Series An Introduction to Contracts and OCIA James J. Casey, Jr., J.D. Director, Office of Contracts and.
Construction Management At Risk Process
Introduction to Procurement for Public Housing Authorities Getting Started: Basic Administrative Requirements Unit 1.
Becoming a Procurement Pro Barbie Faust – Child Nutrition Program.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
1 Statements of Work – Getting Them Right!!. 2 Today’s Agenda A.The Basics B. Sources of Information C. Scenario #1: Procurement is in the loop D. Scenario.
Contract management 1. Acquiring software from external supplier This could be: a bespoke system - created specially for the customer off-the-shelf -
1 Consent to Subcontract Breakout Session # D12 Name: Rita Wells Daniel Johnson Anthony Simmons Date:July 12, 2011 Time:11:15 – 12:30.
PWGSC - KOREA 2nd JCC Meeting Canadian Federal Real Property Construction Contracting Presentation by Bruce Fletcher Director General – CASMS - PWGSC November.
1 1 The FAA's ECSS Acquisition — An Innovative Approach to Procuring Enterprise-Wide Support Services Breakout Session # 782 Scott M. Bukovec Senior Contracting.
1. 2 Cost & Price Analysis Breakout Session # 312 Beverly Arviso, CPA, Fellow, CPCM, CFCM, Arviso, Inc. Melanie Burgess, CPA, CFCM, Burgess Consulting,
Project Management – PTM712S
Acquisition Support New Horizons Consulting Services, LLC’s, premier business unit is an offering of a full range of services and support for acquisition.
SERVICES ACQUISITION REFORM ACT OF 2003 A STATUS REPORT
2016 SAME Small Business Conference - Atlanta
Consent to Subcontract
PROJECT DELIVERY METHODS
Ch 11 - Procurement Management Learning Objectives
Honoraria for Design Build Projects Methodology Assessment Matrix
Presentation transcript:

ITS Procurement Workshop Module 3: Selecting a Contracting Approach

ITS Procurement Workshop ITS Projects Products –Vehicle detectors, CCTV, lane control signals, DMS, communication medium and devices, traffic management building, conduit, pull boxes, foundations, structures, poles, hardware, computers, software, and traffic controllers Systems –Incident management systems; emergency dispatch systems; freeway management system and associated metered ramps; and arterial traffic signal systems Services –Architectural, surveying, mapping, engineering, design, construction, construction management, software development, system testing, and system integration.

ITS Procurement Workshop Mini-Cases

ITS Procurement Workshop Procurement Approach Model Work Structure Agency Characteristics Project Characteristics Method of AwardContract Type Enabling Legal Framework Other Tools

ITS Procurement Workshop Work Structure Agency Characteristics Project Characteristics Method of AwardContract Type Enabling Legal Framework Other Tools Work Structure Phased One Step Multi-Contract Combinations Work Structure Phased One Step Multi-Contract Combinations

ITS Procurement Workshop Basic Work Structure Plan DesignM & O Typical Steps in ITS Acquisition Steps in Traditional Project Acquisition Plan DevelopImplement M & OBuild

ITS Procurement Workshop ITS Acquisition Plan DevelopImplement M & O Vision Goals Schedule Cost Procurement Method High Level Requirements Requirements Refine Cost and Schedule Development Install Test Maintenance and Operations Contract Staff Privatize

ITS Procurement Workshop Phased Work Structure Plan DevelopImplement M & O Contractor 1 Contractor 2 Agency (or Contractor) One Contract for Each Step

ITS Procurement Workshop One-Step Work Structure One Contract Encompasses All Steps Plan DevelopImplement M & O One Contractor

ITS Procurement Workshop Multi-Contract Work Structure Multiple Contracts On-Going at the Same Time Sub-Contractor 1: Software System Sub-Contractor 2: Communications System Sub-Contractor 3: Field Device Installation “System Manager” Contractor “System Manager” Contractor

ITS Procurement Workshop Why Is Work Structure Important? Ensure you have the proper prime contractor Ensure you get the help you need

ITS Procurement Workshop Inputs to Deciding Work Structure Consider the Type of ITS Project –Majority OTS –Field devices –Communications –Majority new software/integration –Combinations Note: Consider degree of software development

ITS Procurement Workshop Inputs to Deciding Work Structure What are the other elements of the project beyond ITS? –Structures? –Trenching? –Remodeling?

ITS Procurement Workshop Inputs to Deciding Work Structure How should the work be managed? –Should an ITS Prime manage a “construction” sub? Vice-versa? –Perhaps the ITS work should be separated?

ITS Procurement Workshop Work Structure - Key Points Many ways to “slice it” Consider the ITS elements - should they be contracted separately? You will have to change your concept of the agency as project manager and devote more time no matter how you structure a project

ITS Procurement Workshop Mini-Cases

ITS Procurement Workshop Project Characteristics Work Structure Agency Characteristics Project Characteristics Method of AwardContract Type Enabling Legal Framework Other Tools Project Characteristics Determine Need For Flexibility in Contract Management Project Characteristics Determine Need For Flexibility in Contract Management

ITS Procurement Workshop Project Characteristics Need for Flexibility –Maturity of technology –Size/Scope/Complexity –Coordination with other work –Goals are fixed or not –Final product is stable, known, seen or not

ITS Procurement Workshop Project Characteristics Rating

ITS Procurement Workshop Agency Characteristics Work Structure Agency Characteristics Project Characteristics Method of AwardContract Type Enabling Legal Framework Other Tools Agency Characteristics Determine Need For Support Agency Characteristics Determine Need For Support

ITS Procurement Workshop Agency Characteristics Need for Support –Experience with similar work –Staff Skills –Workload –Funding

ITS Procurement Workshop Agency Characteristics Rating

ITS Procurement Workshop Mini-Cases

ITS Procurement Workshop Enabling Legal Framework Work Structure Agency Characteristics Project Characteristics Method of AwardContract Type Enabling Legal Framework (FARs) Other Tools Enabling Legal Framework Construction Engineering and Design Services Common Rule Services Goods SEP 14 Design/Build Others Enabling Legal Framework Construction Engineering and Design Services Common Rule Services Goods SEP 14 Design/Build Others

ITS Procurement Workshop Enabling Legal Framework Federal-aid procurement regulations – Code of Federal Regulations (CFR) Title 23 Parts 172, 635, 655 and Title 49 CFR Part 18 The laws that govern the use of Federal-aid highway funds If you use Federal funds for your ITS project - at any proportion - procurement is guided by the Code

ITS Procurement Workshop Enabling Legal Framework Construction Engineering and Design Services Common Rule –Goods –Services –Construction SEP 14

ITS Procurement Workshop Lessons Learned About Frameworks The Traditional Model - Engineering and Design Services and Construction –Contractor manages the subcontractors, rather than the agency. –However, ITS subs are often inaccessible under many layers of subcontractors (e.g. WSDOT) –Construction is low bid, and usually not suitable for ITS.

ITS Procurement Workshop Lessons Learned About Frameworks The Traditional Model - Engineering and Design Services and Construction –Imposes an artificial break between “design” and “construction”. –System Manager or Integrator contracts work well when risk is appropriately shared between client and contractor. –Past failures have been due to lack of shift in client/contractor relationship.

ITS Procurement Workshop Lessons Learned About Frameworks Common Rule –Many agencies have more flexible procurement rules, better suited to ITS (e.g. VDOT). –Some have rules specifically developed for technology (e.g. City of Bellevue, WA, State of Texas).

ITS Procurement Workshop Lessons Learned About Frameworks SEP 14 –Allows merging of “goods”, “services” and “construction” (e.g. CARAT). –Allows cost and quals combined in selection (e.g. UDOT). –Good alternative if your own processes are rigid (Common Rule)

ITS Procurement Workshop Lessons Learned About Frameworks SEP 14 –Design/Build allowed under SEP 14 –The term “Design/Build” carries a lot of baggage - use an alternative. –ITS is inherently design/build –Like all ITS, design/build ITS procurements require you to change your view of the client/contractor relationship.

ITS Procurement Workshop Mini-Cases

ITS Procurement Workshop Method of Award Work Structure Agency Characteristics Project Characteristics Method of AwardContract Type Enabling Legal Framework Other Tools Method of Award Qualifications Cost Quals and Cost Method of Award Qualifications Cost Quals and Cost

ITS Procurement Workshop Method Of Award Qualifications –Standard RFP/Interview –Two-Step Qualifications (LOI or RFQ, then RFP and/or interview) –Competitive Design –Demonstrations and/or Site Visits –Requirements Checklists –Sole Source –Unsolicited Proposals

ITS Procurement Workshop Method of Award Cost and Qualifications Combined –Two-Step Sealed Bids (Quals then Cost) –Competitive Proposals Best Value Life-Cycle Cost –Best and Final Offers –Competitive Negotiations –Sole Source

ITS Procurement Workshop Method of Award Cost (Low-bid) –Fixed cost works best for fixed outcome projects. –Cost alone is often inappropriate for ITS.

ITS Procurement Workshop When use Quals? When Quals and Cost? Consider what you are “buying”. –Intellectual property versus real property –Proportions of each How difficult is achieving the outcome? –Technically –Institutionally (people issues)

ITS Procurement Workshop Method Of Award - Lessons Learned Match selection method to outcome: –Qualifications and cost combined work well if the product is a combination of services and products. –Qualifications alone works well for software alone, or services. Beware of low bid for software: only use low bid for items with very little or no software development/integration.

ITS Procurement Workshop Contract Type Work Structure Agency Characteristics Project Characteristics Method of AwardContract Type Enabling Legal Framework Other Tools Contract Type Fixed Price Cost Reimbursement Incentive Contract Type Fixed Price Cost Reimbursement Incentive

ITS Procurement Workshop Contract Type Fixed Price –Firm Fixed Price –Variations Various Price Adjustments (Not scope-based) Fixed Price Works Best for Fixed Outcomes

ITS Procurement Workshop Contract Type Cost Reimbursement –Reimburses labor and direct costs, scope often very unclear. –Cost plus Fixed Fee –Time and Materials

ITS Procurement Workshop Contract Type Incentive –Relates fee to contractor performance –Target cost-based –Award Fee –Others

ITS Procurement Workshop Contract Types - Lessons Learned Fixed Price is applicable to fixed outcome work – not new software. Cost Reimbursement is applicable to software-intensive work and other work with flexible outcomes. –Long history of success in IT world. (MDSHA) Incentive applies to mature technology and software.

ITS Procurement Workshop Other Tools Work Structure Agency Characteristics Project Characteristics Method of AwardContract Type Enabling Legal Framework Other Tools Task Order IQC Other Tools Task Order IQC

ITS Procurement Workshop Other Tools Can be used with most any Contract Type (except, perhaps, construction). –IQC/On-Call Services (MinnDOT, GDOT) –IQC For Goods (UDOT) –Task Order (VDOT) –Independent Validation and Verification Contractor (MdSHA, NJ Turnpike)

ITS Procurement Workshop Other Tools - Lessons Learned Task Order increases control and flexibility, increases administrative burden. IQC reduces total time to contract. Little I,V & V contract experience - rely on DoD methods for conflict resolution.

ITS Procurement Workshop Procurement Approach Model Work Structure Agency Characteristics Project Characteristics Method of AwardContract Type Enabling Legal Framework Other Tools

ITS Procurement Workshop Effective Practice Summary Matrix

ITS Procurement Workshop Project/Agency Characteristics Diagram  High Low Traditional Practice OK Compromises In Effective Practice, Carefully Selected May Work NOTE: METHODS ARE ARRAYED IN A COMPARATIVE SENSE Apply Effective Practices Get Help! Perhaps Use I,V &V, or Think about DBOM Rethink Your Overall Approach Need For Flexibility (Project Characteristics ) Need For Support (Agency Characteristics) 1

ITS Procurement Workshop Work Structure Agency Characteristics Project Characteristics Method of AwardContract Type Enabling Legal Framework Other Tools Effective Practices Include... Enabling Legal Framework Method of AwardContract Type Other Tools Effective Practices

ITS Procurement Workshop The Matrix Contractor specifies materials purchased by Client Agency. Restrictions on combining goods and services. Cost Reimbursement Fixed Price (unless it isa fixed outcome or product) Least Effective (Traditional Practices) ITS combined with other installation disciplines. Traditional approach where “design” and “construct” phases are separated. A contractor must accept the risk of other contractors or other parties. Services and goods completely separated. Low Bid selection required. None used. Cost– Do not use low bid for ITS unless you are purchasing a fixed outcome job

ITS Procurement Workshop Applying the Tools 1- Work Structure 2- Assess Project and Agency Characteristics 3 - Use the Diagram To Determine if Your Conditions Allow Compromises To Most Effective Practices 4- Apply Most Effective Practices Unless You Cannot Or Unless You Are Certain They Do Not Apply

ITS Procurement Workshop Key Points  Other procurement options exist that are more suited to ITS  ITS requires new procurement practices  ITS requires a change in management approach

ITS Procurement Workshop Key Points  Fixed outcomes = Fixed Costs = Cost- Based Selection  Uncertain outcome = Flexible Costs = Qualifications Based Selection  Most ITS is somewhere between these two