SELECT Scheme Provider Certification of Construction (Electrical Installations to BS 7671)

Slides:



Advertisements
Similar presentations
AUDITS 29 th November 2011 Marriott Hotel, Leeds Presentation by Robert Jopling BEng, CEng, MICE Member of Scottish Registration Board.
Advertisements

Company Confidential Registration Management Committee (RMC) 1 Roles & Responsibilities San Diego, California January 20, 2011 R. Darrell Taylor Raytheon.
Module 13 Oversight Assessment of Auditor Authentication Bodies
Prepared and presented by Paul French AJA Registrars Operations Director AJA are a multi-accredited International Certification Body based in Portishead.
SOP Melody Lin, Ph.D. Deputy Director, Office for Human Research Protections Director, International Activities Santiago, Chile August.
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
The New TNI Laboratory Accreditation Standards Requirements for an Accreditation Body.
1 The aim…. ‘to enable assessors to objectively assess a laboratory’s compliance with the new standards’
Registration Management Committee (RMC) Other Party (OP) Assessor AS9104/2 - Oversight Training January 24, 2008 – Phoenix, Arizona Roles and Responsibilities.
October 3, 2006TCBC Meeting October, 2006Slide 1 TCB Code of Practice Art Wall
Contractor Safety Management
LEGISLATION OVERVIEW & PROCEDURES Douglas Walker Chairman Scottish Registration Board Structural Engineers Registration Ltd.
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.7 Commissioning Geoff Vaughan University of Central.
© The Association of Independent Schools of NSW Preparing for the ASQA Audit.
Potential Electrical Problems Tennant replaces lighting fittings on their own Tennant adds lighting point Tennant adds socket outlet point Tennant removes.
Fire Safety Jonathan Harrison Fire Protection Inspector West Yorkshire Fire & Rescue Authority.
Quality Assurance/Quality Control Policy
World Health Organization
A Guide to Fire Alarm Service and Maintenance Requirements.
ESSENTIAL SAFETY MEARURES IN BUILDINGS PRESENTED BY: BRUCE HOWIE.
LEGISLATION OVERVIEW & PROCEDURES Douglas Walker Chairman Scottish Registration Board Structural Engineers Registration Ltd.
SER Organisation and Governance Dr Sue Doran Company Secretary and Head of Certification.
5.2 Personnel Use competent staff Supervise as necessary
How to pass the test Stephen Shorrocks David Starr.
COMPETENCY CERTIFICATION WITHIN THE INDUSTRY Hazardous Area Standardisation - A case study from Australia 3 What is Competency Competency comprises the.
S3: Module D Physikalisch-Technische Bundesanstalt Session 3: Conformity Assessment Module D Peter Ulbig, Harry Stolz Belgrade, 31 October.
ISO CERTIFICATION PROCESS Philip Thompson Head of BPIF Business.
Quality Management Systems P.Suriya Prakash Final Mech Vcet
Partners in Compliance Local Authority Building Standards Scotland Bob Renton FRICS Consultant to LABSS Honorary President LABSS.
ICAO Aerodrome Safety Workshop Almaty, Kazakhstan – 18 to 22 November 2002  AERODROME MANUAL.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Toolbox talk on BS 5266 a guide to the maintenance of emergency lighting systems Yorkshire Electrical Services (Contracting) Limited.
Part of the BRE Trust Approved Certifiers of Design: Section 6 (Energy) BRE Scotland.
Overview of existing assessment schemes Rolf Bienert, John Lin.
Verification: Quality Assurance in Assessment Verification is the main quality assurance process associated with assessment systems and practice - whether.
CCAB Training Providers Event 17 November 2008 Reviews Required by QAC Heather Briers Director Chartered Accountants Regulatory Board.
The New Building Standards System Completion certificates.
Important informations
Company Confidential Registration Management Committee (RMC) AS9104/2A Presentation San Diego, CA January 17, 2013 Tim Lee The Boeing Company 1 Other Party.
Our Glasgow Solicitors To-Do List for New Residential Landlords Tenancies (like people) come in all shapes and sizes. But when it comes to private sector.
ITEM 7 BODY TO MANAGE DEVELOPMENT PROCESS 2012 October QCTO.
Consistency of Assessment (Validation) Webinar – Part 1 Renae Guthridge WA Training Institute (WATI)
Webinar FSSC audit report 7th september 2015
Assessment Validation. MORE THAN YOU IMAGINE ASQA (Australian Skills Quality Authority) New National Regulator ASQA as of 1 July, 2011.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
Promoting Quality in Fire Safety Presentation by:.
Managing Fire Safety In Common Parts of Flats and Mixed Use Buildings Simon Gibbins Merseyside Fire and Rescue Service.
1 Service Coordinator Orientation FN R. CollESH SectionX8518.
Ian Bell Tyne and Wear Fire and Rescue Service
Authority Requirements Margit Markus Tallinn, 7 May 2009.
The Repairing Standard ELECTRICAL INSTALLATIONS AND APPLIANCES.
S TANDARDS, CERTIFICATION AND ASSESSMENT C HAPTER 23 Dr. Ahmad F. Shubita.
Level 1 Diploma in Plumbing Studies © 2013 City and Guilds of London Institute. All rights reserved. 1 of 15 PowerPoint presentation Career opportunities.
Developing a Local Authority Policy for Safety Audit Jo Horton - Road Safety Engineer Kent County Council
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
Welcome to the FSSC Global Markets Webinar 11 September 2017, 4pm CET
Pat Nestor MSCSI MRICS Head of Building Control Dublin City Council
ISO/IEC
Accreditation process for Industrial Hygiene Inspection Bodies
Software Subcontractor
UNIT V QUALITY SYSTEMS.
Michel BRENON IEC ExTAG Secretary
Temporary Works Co-ordination
PRESENTED BY ING. EBENEZER K. HAIZEL
National Artisan Moderation Body
GMP Inspection Process
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO]
Onsite Control of Visitors & Contractors
Operationalizing Export Certification and Regionalization Programmes
Presentation transcript:

SELECT Scheme Provider Certification of Construction (Electrical Installations to BS 7671)

SELECT Dave Forrester Head of Technical Services Head of Certification

SCOPE Who we are Scheme overview The audit process Value of Certification Complaints Handling

Who we are Member Companies 90% of all electrical installation work 15,000 electricians employed 2,200 apprentices in training

Mission Statement “To be recognised as delivering the exceptional support which enables our members to prosper”

Scheme Overview

Approved Body Approved Certifier of Construction Certificate of Construction Scheme Provider Certification Coordinator Verifier

Audit Process The Assessor –SELECT Technical Adviser –Incorporated Engineer –Many year’s experience in the industry –UKAS accredited inspection

Audit Process At the Approved Body’s premises the Assessor checks: –Appropriate documents are available –copies of BS certification have been retained –Appropriate test equipment is available –Qualification certificates of ACCs are available

Audit Process At appropriate site(s) the Assessor will ask the Approved Certifier to: –Inspect all or part of the electrical installation(s) –Carry out tests of all or part of the installation(s) –Assess all or part of the installation(s) for overall compliance with the Building Regulations

Audit Process The Assessor will compile a report. Any non-compliance will require action The Assessor will make a recommendation: –Acceptance –Deferment –Rejection The applicant may appeal the decision

Value of Certification

The Audit Process Scheme providers Subject to audit by BSD Continuous Improvement Action Plan Issues Log

Value of Certification Certificate of Construction The Approved Certifier signs Part A The Certification Co-ordinator signs Part B

Value of Certification Scheme Checklist

Value of Certification Appropriate BS Certificates should be completed, which may include: Electrical Installation Certificate together with Inspection and Test Result Schedules Minor Electrical Installation Works Certificate(s) Fire Detection and Fire Alarm Installation Certificate (Dwellings) to BS Fire Alarm Installation Certificate to BS Emergency Lighting Completion Certificate to BS

Certification Practice 1.The building owner or developer should inform the Verifier that they intend to use an Approved Certifier at the warrant application stage 2.During construction and on completion the Certifier must be satisfied that the work complies with the Building (Scotland) Regulations The Certifier must be satisfied that they are competent to certify aspects of the work or use the advice of suitably qualified persons 4.The Certifier completes the Certificate of Construction, signs Part A and the Certification Co-ordinator signs Part B

Certification Practice 5.The Certifier completes the Scheme Checklist and retains it 6.The completed Certificate of Construction along with the appropriate BS Certification is given to the building owner or developer 7.The relevant person fills in the Completion Certificate, attaches the Certificate of Construction and submits them to the Verifier 8.The Verifier will check that the Approved Body and Approved Certifier are currently registered on the Certification Register 9.A record of all certificates issued must be maintained by the Approved Body

Value of Certification No additional inspection required The Approved Certifier takes responsibility Scottish Government backed

Complaints Handling The Guide is produced jointly by the two scheme providers SELECT and NICEIC. It describes the scheme and its operation!

Complaints Handling Complaint received by Approved Body/ Approved Certifier Complaint received by Scheme Provider valid? Inspection required? breach of Scheme rules? breach of section 19(4) of Act?

Complaints Handling Scheme Disciplinary Panel Certification Disciplinary Panel Disciplinary procedure reported to local authority action plan cancellation of registration

Summary SELECT has been part of Certification from the beginning Regular audit is a key part Certification brings benefits for all …but requires collaborative working

Contacts John Allen – Highlands & Islands Allan McCabe – Glasgow/Dumfries & Galloway Yvonne Wilson – Fife, Tayside & Grampian Elaine Gilchrist – Edinburgh/Borders/Lanarkshire